• Title/Summary/Keyword: Soil resistivity

Search Result 259, Processing Time 0.025 seconds

Grounding Impedance Behaviors Associated with the Current Injection Point and the Length of Counterpoise (매설지선의 길이와 전류인가점에 따른 접지임피던스특성)

  • Li, Feng;Lee, Bok-Hee
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.23 no.6
    • /
    • pp.66-71
    • /
    • 2009
  • This paper presents the grounding impedance behaviors of counterpoise exposed to impulse currents. The transient and conventional grounding impedances of three counterpoises having the length of 10, 30 and 50[m] were measured and analyzed as a function of the injection point of impulse currents. As a result, the trend of the conventional grounding impedances measured as a function of injection of impulse current is similar to the transient grounding impedance of counterpoise. The injection point of impulse current has great influence on the transient grounding impedance characteristics of counterpoise. The transient grounding impedance characteristics in a short time range are strongly dependent on the length of counterpoise. The transient characteristics of grounding impedance of 10[m] counterpoise subjected to the impulse current was capacitive behavior, on the other hand, those of 30[m] and 50[m] counterpoises were inductive behavior. It is found that the grounding conductor should be connected to the central point of counterpoise.

Evaluation of Dynamic Ground Properties of Pohang Area Based on In-situ and Laboratory Test (현장실험 및 동적실내실험을 이용한 포항지역 동적 지반특성 평가)

  • Kim, Jongkwan;Kwak, Tae-Young;Han, Jin-Tae;Hwang, Byong-Youn;Kim, Ki-Seog
    • Journal of the Korean Geotechnical Society
    • /
    • v.36 no.9
    • /
    • pp.5-20
    • /
    • 2020
  • In 2017, after the Pohang earthquake, liquefaction phenomena were firstly observed after the observation of domestic earthquake by epicenter. In this study, various in-situ tests and laboratory tests were performed to determine the dynamic properties in (1) Songlim Park, (2) Heunghae-eup, Mangcheon-ri and (3) Heungan-ri, Pohang. As a site investigation, the standard penetration test (SPT), cone penetration test (CPT), multichannel analysis of surface wave (MASW), density logging, downhole test, and electrical resistivity survey were performed. In addition, cyclic triaxial test against sampled sand from site was also conducted. Based on the result, high ground water level and loose sand layer in shallow depth were observed for all sites. In addition, liquefaction resistance ratio of soil sampled from Songlim park was lower than those of Jumunjin sand, Toyoura sand, and Ottawa sand.

Precise Detection of Buried Underground Utilities by Non-destructive Electromagnetic Survey (비파괴 전자탐사에 의한 지하 매설물의 정밀탐지)

  • Shon, Ho-Woong;Lee, Seung-Hee;Lee, Kang-Won
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • v.22 no.3
    • /
    • pp.275-283
    • /
    • 2002
  • To detect the position and depth of buried underground utilities, method of Ground Penetrating Radar(GPR) survey is the most commonly used. However, the skin-depth of GPR is very shallow, and in the places where subsurface materials are not homogeneous and are compose of clays and/or salts and gravels, GPR method has limitations in application and interpretation. The aim of this study is to overcome these limitations of GPR survey. For this purpose the site where the GPR survey is unsuccessful to detect the underground big pipes is selected, and soil tests were conducted to confirm the reason why GPR method was not applicable. Non-destructive high-frequency electromagnetic (HFEM) survey was newly developed and was applied in the study area to prove the effectiveness of this new technique. The frequency ranges $2kHz{\sim}4MHz$ and the skin depth is about 30m. The HFEM measures the electric field and magnetic field perpendicular to each other to get the impedance from which vertical electric resistivity distribution at the measured point can be deduced. By adopting the capacitive coupled electrodes, it can make the measuring time shorter, and can be applied to the places covered by asphalt an and/or concrete. In addition to the above mentioned advantages, noise due to high-voltage power line is much reduced by stacking the signals. As a result, the HFEM was successful in detecting the buried underground objects. Therefore this method is a promising new technique that can be applied in the lots of fields, such as geotechnical and archaeological surveys.

Estimation of Groundwater Flow Rate into Jikri Tunnel Using Groundwater Fluctuation Data and Modeling (지하수 변동자료와 모델링을 이용한 직리터널의 지하수 유출량 평가)

  • Lee, Jeong-Hwan;Hamm, Se-Yeong;Cheong, Jae-Yeol;Jeong, Jae-Hyeong;Kim, Nam-Hoon;Kim, Ki-Seok;Jeon, Hang-Tak
    • Journal of Soil and Groundwater Environment
    • /
    • v.14 no.5
    • /
    • pp.29-40
    • /
    • 2009
  • In general, understanding groundwater flow in fractured bedrock is critical during tunnel and underground cavern construction. In that case, borehole data may be useful to examine groundwater flow properties of the fractured bedrock from pre-excavation until completion stages, yet sufficient borehole data is not often available to acquire. This study evaluated groundwater discharge rate into Jikri tunnel in Gyeonggi province using hydraulic parameters, groundwater level data in the later stage of tunneling, national groundwater monitoring network data, and electrical resistivity survey data. Groundwater flow rate into the tunnel by means of analytical method was estimated $7.12-74.4\;m^3/day/m$ while the groundwater flow rate was determined as $64.8\;m^3/day/m$ by means of numerical modeling. The estimated values provided by the numerical modeling may be more logical than those of the analytical method because the numerical modeling could take into account spatial variation of hydraulic parameters that was not possible by using the analytical method. Transient modeling for a period of one year from the tunnel completion resulted in the recovery of pre-excavation groundwater level.

A Study on the Applicability of Levee Leakage Monitoring System Using Movable TDR Sensor (제방 누수 모니터링을 위한 이동식 TDR 센서의 적용성 평가)

  • Cho, Jinwoo;Choi, Bong-Hyuck;Cho, Won-Beom;Kim, Jin-Man
    • Journal of the Korean Geosynthetics Society
    • /
    • v.13 no.3
    • /
    • pp.1-10
    • /
    • 2014
  • Several types of methods such as resistivity survey, ground penetration radar, etc are used for detection of levee leakage and according to the river design guidelines detection of levee leakage is performed by measuring the hydraulic conductivity of levee soil. But, the former can not verify the leakage point and degree of saturation, the latter is an after treatment method. Movable sensor, which is a high-tech TDR system developed since 2000, can obtain directly the dielectric constant profile covering the whole depth of levee. In this study, laboratory and field model experiments were carried out using movable TDR sensor in order to evaluate the applicability as detection system of levee leakage, As the result, movable TDR system has proven to be 3 times more sensitive to water contents than dry unit weight, and the results conclude that the dielectric constant, water contents and density of the ground proved to have a correlation among them, and the dielectric constant is expected to be a basic data on detection of levee leakage.

Proper Monitoring Methods for Safety Management of Tailings Dam (광물찌꺼기적치장의 안전관리를 위한 적정 모니터링 방안 연구)

  • Jung, Myung Chae;Kim, Jeong Wook;Hwang, In-ho;Yang, In Jae;Park, Jay Hyun;Park, Ju Hyun;Kim, Tae Youp
    • Journal of the Korean Society of Mineral and Energy Resources Engineers
    • /
    • v.55 no.6
    • /
    • pp.576-587
    • /
    • 2018
  • This study has focused on analysis factors affecting safety monitoring system at tailings sites, and the evaluation equipment to monitor the factors. Twenty sites at eighteen mines with unsafe conditions were selected to examine the equipment. There were three main factors influenced safety in the sites including surface erosion, piping, and slope instability. In detail, the surface erosion was divided into three sub-factors (planting, soil-topping layer, and tailings), piping into three sub-factors (liner, rain protection facility and leachate), and slop instability was also divided into three sub-factors (slop, concrete wall, and reinforcing wall). As results of in-field measurement, a CCTV was the most effective facility, and electrical resistivity survey, acoustic sensing, thermal liner sensor, structure inclinometer, rainfall meter, and flowmeter were also highly effective. According to applications of the facilities in the unstable tailings, structural defects were mainly found in the piping, which was the most important monitoring factor for safety management of tailings sites.

A Case Study on the Cause Analysis of Land creep Using Geophysical Exploration (물리탐사를 활용한 땅밀림 원인분석의 사례적 연구)

  • Jae Hyeon Park;Gyeong Mi Tak;Kook Mook Leem
    • Journal of Korean Society of Forest Science
    • /
    • v.112 no.3
    • /
    • pp.382-392
    • /
    • 2023
  • Recent reports have indicated a rapid increase in the frequency of sediment disasters due to climate change and other changes in the geological environment. Given this alarming situation and the recent increase in the frequency of land creep in Korea, systematic and efficient recovery and management of land creep areas is essential. The purpose of this study is to identify disaster vulnerability by conducting a physical exploration of land creep in San 4-1, Jayeon-ri, Gaegun-myeon, Yangpyeong-gun, Gyeonggi-do, and examine stability by identifying the overall geological structure of the affected ground. In addition, drilling surveys are conducted to verify the reliability of the measured data. The results of the study reveal that low specific resistance abnormalities are distributed in the upper part of the soil layer and weathering zone and that this section is a 50-120 m exploration line. It is also confirmed to be a low-hardness ground area where tensile cracks are observed. Therefore, there is a need for research focused on developing measures to reduce economic and social damage within the domestic context by continuously monitoring indicators of land creep and identifying land creep risks.

Analysis of Solute Transport based on Electrical Resistance Measurements from Laboratory Column Tests (전기저항센서가 부착된 주상실험기에서 측정된 전기저항값을 이용한 용질의 이동해석)

  • Kim, Yong-Sung;Kim, Jae-Jin;Park, Junboum
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.4C
    • /
    • pp.231-238
    • /
    • 2008
  • A column testing device capable of measuring the electrical resistivity of soil at 3 different locations was developed to verify applicability of bulk electrical conductivity (BEC) breakthrough curves in monitoring contaminant transport. Tracer injection tests were conducted with three different types of saturated sands to obtain average linear velocities and longitudinal hydrodynamic dispersion coefficients based on BEC breakthrough curves and effluent solute breakthrough curves. Comparative analysis of transport parameters obtained from curve fitting the results into the analytical solutions confirmed the validity of resistance measurements in estimating time-continuous resident solute concentration. Under the assumption that a linear relationship exists between ${\sigma}_{sat}-{\sigma}_w-C$, the BEC breakthrough curves are able to effectively reduce the laborious and time-consuming processes involved in the conventional method of sampling and analysis. In order to reduce possible uncertainties in analyzing the BEC breakthrough curves, it was recommended that resistance measurements take place nearby the effluent boundary. In addition, a sufficient electrical contrast or difference in the electrical conductivity of the influent and the saturating solution is required to conduct reliable analysis.

무령왕릉보존에 있어서의 지질공학적 고찰

  • 서만철;최석원;구민호
    • Proceedings of the KSEEG Conference
    • /
    • 2001.05b
    • /
    • pp.42-63
    • /
    • 2001
  • The detail survey on the Songsanri tomb site including the Muryong royal tomb was carried out during the period from May 1 , 1996 to April 30, 1997. A quantitative analysis was tried to find changes of tomb itself since the excavation. Main subjects of the survey are to find out the cause of infiltration of rain water and groundwater into the tomb and the tomb site, monitoring of the movement of tomb structure and safety, removal method of the algae inside the tomb, and air controlling system to solve high humidity condition and dew inside the tomb. For these purposes, detail survery inside and outside the tombs using a electronic distance meter and small airplane, monitoring of temperature and humidity, geophysical exploration including electrical resistivity, geomagnetic, gravity and georadar methods, drilling, measurement of physical and chemical properties of drill core and measurement of groundwater permeability were conducted. We found that the center of the subsurface tomb and the center of soil mound on ground are different 4.5 meter and 5 meter for the 5th tomb and 7th tomb, respectively. The fact has caused unequal stress on the tomb structure. In the 7th tomb (the Muryong royal tomb), 435 bricks were broken out of 6025 bricks in 1972, but 1072 bricks are broken in 1996. The break rate has been increased about 250% for just 24 years. The break rate increased about 290% in the 6th tomb. The situation in 1996 is the result for just 24 years while the situation in 1972 was the result for about 1450 years. Status of breaking of bircks represents that a severe problem is undergoing. The eastern wall of the Muryong royal tomb is moving toward inside the tomb with the rate of 2.95 mm/myr in rainy season and 1.52 mm/myr in dry season. The frontal wall shows biggest movement in the 7th tomb having a rate of 2.05 mm/myr toward the passage way. The 6th tomb shows biggest movement among the three tombs having the rate of 7.44mm/myr and 3.61mm/myr toward east for the high break rate of bricks in the 6th tomb. Georadar section of the shallow soil layer represents several faults in the top soil layer of the 5th tomb and 7th tomb. Raninwater flew through faults tnto the tomb and nearby ground and high water content in nearby ground resulted in low resistance and high humidity inside tombs. High humidity inside tomb made a good condition for algae living with high temperature and moderate light source. The 6th tomb is most severe situation and the 7th tomb is the second in terms of algae living. Artificial change of the tomb environment since the excavation, infiltration of rain water and groundwater into the tombsite and bad drainage system had resulted in dangerous status for the tomb structure. Main cause for many problems including breaking of bricks, movement of tomb walls and algae living is infiltration of rainwater and groundwater into the tomb site. Therefore, protection of the tomb site from high water content should be carried out at first. Waterproofing method includes a cover system over the tomvsith using geotextile, clay layer and geomembrane and a deep trench which is 2 meter down to the base of the 5th tomb at the north of the tomv site. Decrease and balancing of soil weight above the tomb are also needed for the sfety of tomb structures. For the algae living inside tombs, we recommend to spray K101 which developed in this study on the surface of wall and then, exposure to ultraviolet light sources for 24 hours. Air controlling system should be changed to a constant temperature and humidity system for the 6th tomb and the 7th tomb. It seems to much better to place the system at frontal room and to ciculate cold air inside tombs to solve dew problem. Above mentioned preservation methods are suggested to give least changes to tomb site and to solve the most fundmental problems. Repairing should be planned in order and some special cares are needed for the safety of tombs in reparing work. Finally, a monitoring system measuring tilting of tomb walls, water content, groundwater level, temperature and humidity is required to monitor and to evaluate the repairing work.

  • PDF