Suggestion for Collaboration-Based UI/UX Development Model through Risk Analysis

  • Cho, Seong-Hwan;Kim, Seung-Hee
    • Journal of Information Processing Systems
    • /
    • v.16 no.6
    • /
    • pp.1372-1390
    • /
    • 2020
  • An attractive user interface (UI) design with a clear user experience (UX) is the key for the success of applications. Therefore software development projects require very close collaboration between SI developers and front-end service developers. However, methodologies for software development only exist with inadequate development processes or work standards for collaboration. This survey derived 13 risk factors in developing UI/UX from 113 risk factors of IT projects through a questionnaire and factor analysis and proposed a collaboration-based UI/UX development model that can eliminate or mitigate six risks with high weights and reliability. To extract risk factors with high reliability, factor and reliability were analyzed to extract 13 major risks, and based on the expert opinions and the results of correlation analysis, UI/UX development stages were classified into planning, design, and implementation. The causal relationships between risks were verified through regression analysis. This study is the first to expertly analyze major risks based on collaboration in UI/UX development and derive a theoretical basis that can be used in project risk management. These findings are expected to provide a basis for research on development methodologies for higher levels of front-end services and to construct rational collaboration systems between SI practitioners and front-end service providers.

Determinants of Implementation of Enterprise Resource Planning System: A Case Study in Vietnam

  • NGUYEN, Xuan Hiep;NGUYEN, Thi Cam Loan;MAI, Xuan Dao;BUI, Thi To Loan;TRAN, Thi Tra Giang;HO, Thuy Trinh;NGUYEN, Thi Huyen
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.8 no.4
    • /
    • pp.501-506
    • /
    • 2021
  • Under the pressure of business competition and effectiveness, more and more organizations in the world are likely to apply modern software such as enterprise resource planning (ERP) which can help them to create better organizing practice, better managing capabilities of administrators, and better operations of personnel. In Vietnam, many firms are afraid to install it and the number of firms adopting this software is limited mainly due to the insufficient scientific evidence of the successful implementation of ERP. This study aims to identify and measure the factors influencing the successful implementation of ERP of firms in Vietnam. Qualitative research methodology combined with quantitative research methodology is used. The data are surveyed with 343 administrators of 45 organizations that have successfully deployed ERP in Ha Noi and Ho Chi Minh cities. Of these 19 were excluded from analyses due to unsatisfactory responses, and only 324 were used for statistical processing. The collected data were processed by using the SPSS software. The result of the study shows that there are six factors affecting the successful implementation of ERP of firms in Vietnam, (ranked in descending order of importance), they are top management commitment and support, business process re-engineering, user involvement, project management board, vendor support, and suitability of software and hardware.

A Review of Large-Scale Hydropower Project in Public Sector of Pakistan

  • Umair, Muhammad;Choudhary, Muhammad Abbas;Jahanzaib, Mirza
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.4
    • /
    • pp.47-59
    • /
    • 2014
  • Client organization inadequate project planning before awarding the contract and insufficient monitoring and control system among the parties involved create severe problems. Ultimately, large-scale projects go beyond the expected cost and time control limits. This paper discusses the major issues involved with a large-scale Hydropower Project in Pakistan Public Sector environment. The latest approved Baseline Plan of project was reviewed and analyzed using Variance Analysis and Trend Analysis techniques in Primavera project management software to assess the efforts made of the parties involved. It was found that Project is 202% Cost overrun and 25% time delays from original contract award. After analysis of baseline plan and quantification of various variance issues in impacted activities, the questionnaire survey was conducted to identify the impact of causative factors. There were almost 17 most significant causative factors identified among 60 identified factors and responsibilities are assigned accordingly. At the end recommendations are made for strategic decisions as lessons learned during project evaluation.

Factors Affecting the Success of Construction Projects in Khyber Pakhtunkhwa, Pakistan

  • Musarat, M. Ali;Ahad, M. Zeeshan
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.4
    • /
    • pp.1-6
    • /
    • 2016
  • Construction industry ranks as the largest industry and imparts a significant part in developing and achieving the aims of society. Due to the involvement of larger number of stakeholders, construction industry is complex in nature. The current study is designed to identify and evaluate the factors affecting the success of construction projects in Khyber Pakhtunkhwa (KP), Pakistan. To carry out the study, a questionnaire was developed in term of interview pilot study. The data from the questionnaire survey was analyzed through SPSS software in five groups to accumulate authenticity of 44 factors. Later on the ranking was done by relative importance index (RII). According to the outcome of the research, "Project Group" stood highest among the five groups with factor of "project size" at the top rank while "Contractor Group" stood lowest with the factor of "client size" at bottom rank. From the study it is concluded that the Project Group is identified as a crucial blockade in success of construction projects. By giving pivotal attention to project group, the projects could be successfully attained from factors of project size, materials and equipment, funds and resources and project planning. To focus on the factors of project group, trust of the province people could be restored in construction of projects.

Material Planning Model for Multi-Project Management in Medium-sized Construction Companies (중견건설업체의 다중현장관리를 위한 자재조달계획 지원 모델)

  • Jung Sung-Lim;Han Ju-Yeon;Kim Kyung-Rai;Shin Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.106-114
    • /
    • 2004
  • As the scale of construction work is enlarged, complicated and diversified, much construction information from the large number of construction sites is generated and reported to the head office. To control much information generated in construction sites simultaneously, the necessity of supporting system which could extract necessary information is increased. However, comparing with those of large companies, medium-sized companies's organization of head office and management system are weak. So it's difficult to manage multi-projects. Among these site managements, resource management is an important management area. But, resource planning is based on experience and judgement and has not associated with schedule information. So when schedule is changed, the plan must be amended manually. This study investigates material-planning model for multi-project management which is connected with daily report system and scheduling software.

A study of actual planning how to increase IT productivity by COCOMO II Model (IT산업 생산성 향상을 위한 프로젝트 실행계획 수립 방안 연구 - COCOMO II 적용사례)

  • Park, Cheol-Gu;Kim, Chang-Eun
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.2
    • /
    • pp.147-152
    • /
    • 2010
  • Project implementation plan is a blueprint that confirms project performance activities and specifies required man-hour, period and resource imput ratio. Various figures, the results of implementation plan, are predicted through estimation, and because of superiority of objectivity and repeatability, numerical formula-based estimation model is often used overseas. COCOMO model is the representative estimation model whose theories and formulas are publicized and it predicts the total man-hour required for software system development. This model is publicized in "Software Engineering Economics" written by Professor Barry Boehm of the U.S., and is the most widely applied numerical formula-based estimation model. This study is conducted to provide a series of methods that are optimal for KTDS environment by choosing COCOMO II model among various types of COCOMO models. In establishing implementation plan, COCOMO II model alone is not sufficient, it is necessary to link with and apply standard WBS system and standard man-hour. In establishing specific implementation plan, phased standard WBS system in order of the first phase of all the activities implemented in the project, Activity, Task, and Role, and the man-hour put into this should be distributed according to standard ratio from COCOMO II model's total man-hour. This study provides explainations by establishing standard WBS system and linking with COCOMO II model.

Software Size Measurement from Information Strategy Planning With the Function Point Method (정보전략계획 단계에서의 정보시스템 규모 예측:기능점수모형을 중심으로)

  • Bae, Joon-Soo;Jung, Jae-Yoon
    • The Journal of Society for e-Business Studies
    • /
    • v.14 no.3
    • /
    • pp.153-168
    • /
    • 2009
  • Many companies and governments perform information technology (IT) projections repeatedly for higher competitiveness and efficiency. Moreover, as the sizes of IT projects increase, the manpower and cost estimation of the projects are getting more important. In this research, we present a size estimation method of information system development projects on the basis of the function point method at the stage of information strategy planning(ISP), and illustrate the size calculation of an example IT project. According to the method, we first identify the types of projects, the scope and boundaries of size estimation, then count data and transaction functions from the artifacts of the ISP project. The unadjusted function points are adjusted to function point by the table of the Early Function Point. The way of calculating the sizes of IT projects will support successful IT projects by estimating reasonable manpower and cost for the projects.

  • PDF

Study on ISA's assessment to software process for EN50128 SIL4 (EN50128 SIL4 소프트웨어 프로세스 ISA 인증 사례 연구)

  • Cho, Chi-Hwan;Kang, Chan-Yong;Hwang, Jin-Ho
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.838-849
    • /
    • 2010
  • It is inevitable to control the systematic failure to obtain the software safety integrity of embedded software installed in rolling stock. Because it is not possible to assess systematic failure integrity by quantitative methods, SILs are used to group documentation, methods, tools and techniques throughout software development lifecycle which, when used effectively, are considered to provide an appropriate level of confidence in the realization of a system to a stated integrity level. Normally, safety approval process is through generic product, generic application and specification application for. For safety approval on generic application of software based system, it is required to apply the certified software processes from the planning stage for the assigned SIL. As such, we will develop project specific application with high safety integrity within time limit of contractual delivery schedule through software assessment to the modified area with the re-use of certified software module and documentation. At this point, Hyundai Rotem has developed software processes applicable to support SIL 4 based on EN50128 which was assessed and certified by TUV SUD. This paper introduces the Hyundai Rotem's detailed approach and prospective action to achieve software safety integrity level.

  • PDF

Web-Based Cost Planning Program for High-Rise Office Building (고층 사무소건축의 공사비계획을 위한 웹 기반 개산견적 프로그램)

  • Kim Ki-Hong;Park Chan-Sik;Chang Sun-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.2 s.24
    • /
    • pp.69-79
    • /
    • 2005
  • The Purpose of cost Planning at the early Phase of construction Projects is to provide the clients with the appropriate cost information during the design decision-making process. Therefore, the cost planning process is expected not only to predict projects' cost accurately but also closely to coordinate with the design decision-making activities. This paper proposes a new cost planning method for the effective and efficient directions relating a design decision-making process. Strategies for this method are i ) to utilize elemental cost breakdown system, and ii ) to apply probabilistic distribution theories. Based on these strategic direction, this paper proposed a probabilistic cost planning model for high-rise office building projects. The suggested model provides appropriate cost information to meet clients limited budget and various project' requirements during the design decision-making process. This study is based on probabilistic distribution variables theories and the range estimating technique. This study also develops a web-based software program in order to apply the proposed cost planning model effectively in high-rise of office building construction practices.

Development of a Scheduling System for Mould and Die Manufacturing Factory Using Microsoft Project 98 (Microsoft Project 98을 이용한 금형공장의 일정계획 시스템 개발)

  • Ju, Sang-Yoon;Ok, Kyung-Jin
    • IE interfaces
    • /
    • v.13 no.2
    • /
    • pp.246-252
    • /
    • 2000
  • As moulds and dies are manufactured through complex processes under the make-to-order production environment, it is very difficult that the manufacturing activities as like observance of the due date, trace of the progress, etc are controlled with a real time. In this paper, a schedule-planning system using the commercial software Microsoft Project 98 is developed to control the procedures of mould and die manufacturing with real time. Once an initial schedule is planned from the BOM information in the intranet, it is rescheduled by data collected from machines on the shop floor. The system is suitable to medium- or small-sized manufacturing companies as well as large-sized ones, because it can be installed with a low cost.