• Title/Summary/Keyword: Small construction projects

Search Result 174, Processing Time 0.025 seconds

Success Factors of Scheduling in Small-Scale Building Construction with Owner-CM Delivery Method (건축주-CM 방식의 소규모 건축공사에서 공정관리 성공 요인)

  • Kim, Seon-Gyoo;Kim, Junyoung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.96-104
    • /
    • 2019
  • Recently, projects are being actively promoted to develop a new residential district centered around the metropolitan area, or to redevelop the residential area that was established long ago as unplanned land development. In this residential area, the owner can directly construct the building, and the way the building owner builds the residential house is called the direct construction of the owner. If the owner has the construction management (CM) capability while conducting direct management of the owner, the direct construction can be carried out by the CM method. This type of construction is called Owner-CM delivery method. However, it is very rare for small-scale construction in Korea to be implemented by the Owner-CM method. This may be due to the lack of knowledge and experience about the CM of the owner. In this study, we investigated the actual cases of the scheduling for the residential houses of similar size which were built at the same time in the residential housing complex developed near the metropolitan area. The purpose of this study is to derive the success factors of the scheduling in the small-scale construction from the cases carried out by the Owner-CM method. These success factors of the scheduling can be used as meaningful reference for the owners who want to build their own house in the future.

Improvement of Technical Proposal Tendering Evaluation Criteria for Small and Medium sized Construction Projects (중·소형 건설공사를 위한 기술제안입찰 평가기준 개선)

  • Yu, Jun-Hyeok;Hyun, Chang-Taek;Moon, Hyun-Seok;Son, Myung-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.95-105
    • /
    • 2012
  • The government introduced the technical proposal drafting system in September 2007, as a new method to stimulate technical competence among construction companies to require ingenuity, creativity, artistic sense, and high-level technology. However, an examination of instances has shown that this system has been applied only to large scale constructions worth 30 billion won or more, and not to small and medium constructions worth less than 30 billion won. This is because the evaluation criteria of the system is structured in a manner that makes it difficult to apply to small and medium constructions. This study presented methods to improve the evaluation factors, categories, and scoring scheme of the technical proposal creation system for medium to small scale constructions to be able to further apply the current system to small and medium constructions. The technical proposal evaluation criteria presented in this study was significant in that it enabled the technical proposal creation system that was mainly used for large scale constructions to be further applied to medium to small scale constructions. And it also contributes to the establishment and settlement of a new technical proposal tendering for medium to small scale constructions.

Web 2.0 Cluster based Process and Performance Management System Modeling (Web 2.0 Cluster 기반의 공정 및 성과관리 시스템 모델 구축)

  • AHn, Jae-Gyu;Ong, Ho-Kyoung;Kim, Dae-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.892-898
    • /
    • 2007
  • This study aims to implement an efficient process management system for small and medium sized(local) construction companies and a performance management system for the Korean construction industry. The process management system by Lean Construction is Web 2.0 platform-based and creates clusters with numerous general contractors and sub-contractors, which will enable mutually organic process management. Plus, this system will enable them to compare project performance management by analyzing it during or after a project by collecting and accumulating lots of data occurring in pursuit of a project. These performance management cases will be of help in process planning during similar upcoming projects. This study is expected to somewhat reduce the burden of implementing a complicated process management protocol and system that Korean small and medium sized (local) construction companies experience with their web-based process management, and is supposed to realize accurate performance management with highly reliable data which are significantly accumulated within the database.

  • PDF

How to Improve the Competency of Agency CM Companies to Conduct the CM at Risk Projects? (용역형 CM사가 책임형 CM 프로젝트를 수행하기 위해 필요한 역량)

  • Jeon, Myeongsik;Kang, Youngcheol
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.44-54
    • /
    • 2021
  • As the CM at Risk market grows recently, designers and CM companies that have been performing agency CM services have been showing their interests to participate in the CM at Risk projects. With the assumption that agency CM companies with a lot of experiences and know-how in the field of construction project management have created the circumstances to enter the CM at Risk market, this study investigates the competencies necessary for the agency CM companies to carry out the CM at Risk projects. The compentencies to run the CM at Risk projects were identified based on the literature review. A survey was conducted to identify the competencies that need to be supplemented first. The survey results revealed that competency related to partner companies, finance and guarantee, risk and claim, and project cost were identified to have a higher level of complementation compared to other competencies. In addition, considering that the level of competency that need to be secured is high, as the level of holding of all competency is on average 76% of the required level, in the beginning, small-scale CM at Risk projects with relatively low risk are mainly carry out, strengthening competency and then increasing the scale is considered more appropriate strategy.

A Model for Improving Performance Structure of Build-Transfer-Lease in Small Public Educational Facilities (소규모 공공교육 시설 임대형 민자사업(BTL)의 수행구조 개선모델)

  • Kim, Seung-Sup;Jung, Sang-Min;Koo, Choong-Wan;Koo, Kyo-Jin;Hyun, Chang-Taek;Hong, Tae-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.116-124
    • /
    • 2007
  • It is Increasing that requirements of social infrastructure which includes educational, welfare, cultural facilities for public. Government introduced BTI(Build-Transfer-Lease) as a PFI(Private Financial Initiative) system. This research is about BTL projects in small public educational facilities. Some problems when BTL system is applied to small public educational facilities are identified, and the reason of those problems are examined. This research proposes alternatives in a institutional way and it proposes improvements in contractual structure of consortium when BTL system is applied. Based on reasonable system, it promotes creativeness and effectiveness of a project, and it makes local minor construction companies participate in BTL project without difficulties as mentioned.

A Study on the Application of Defense IoT for the Implementation of Common Service in the Army, Navy, and Air Force (전군 공통 서비스 구현을 위한 국방 IoT 적용방향 연구)

  • Bae, Young-Min
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.45 no.3
    • /
    • pp.31-39
    • /
    • 2022
  • The Army, Navy, and Air Force are currently making various efforts to apply defense IoT technology by reflecting the characteristics of each military. However, there are concerns that comprehensive collection, management, and analysis may be limited because each military has no overlapping system or guaranteed interoperability of data, and there are inefficient aspects in terms of using and investing a limited defense budget. In this study, evaluation items and priorities for pilot projects were selected by applying Delphi technique and AHP method to determine which projects are preferentially effective when commonly applied in terms of Army, Navy, and Air force. As a result of the analysis, the project basis and driving force, project feasibility, performance and ripple effect, redundancy and connection were identified in the order of IoT-based small detachment units and unmanned base construction, intelligent smart unit, smart ground ammunition depot, and smart training management system. According to the comprehensive results reflecting the weights of each evaluation item, the fact that small detachment units and unmanned base construction project are recognized as the first project to be applied to the Army, Navy, and Air Force is a valid approach to be effective while each military is burdened with personnel management because of the reduction of manpower. Through the research results, it is expected that the direction of application to the policy of the defense IoT project can be confirmed in terms of efficient use of limited budgets.

Derivation of BIM Project Properties Through an Analysis of On-Line BIM Project Cases (온라인 BIM(Building Information Modeling) 사례 분석을 통한 BIM 프로젝트 속성정보 도출)

  • Lee, Kyungha;Uhm, Miyoung;Lee, Hwayeon;Lee, Ghang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.194-195
    • /
    • 2015
  • When starting a new project, generally similar existing projet are searched. As Building Modeling Information(BIM) has short history and experience, the dependence on similar project is high. Small and medium sized design companies are depending on website search tool for information of BIM project besides companies maintaining the Database(DB) from lots of project experience. However, the information level and contents provided by websites differ drastically from each other which makes it difficult to utilize the information and apply cases. Furthermore, the different classification system of the sites makes the situation even worse. Therefore, we collected and analyzed over 100 BIM cases from 18 global websites, to develop a system for BIM case application. Result showed that over 90% of our subject pool provided basic information including the construction type, characteristics of the client (public/ private), location of the project, and detailed information such as primary usage. Moreover, the reasons for applying BIM where to solve problems of geometric design, building system like MEP and construction. Furthermore, there was a contrast between cases conducted only within Korea and cases conducted with other countries. While there was almost always helpful information regarding the administrative steps for Korean BIM cases, there was close to no information for projects carried out outside of Korea. These results could contribute to verifying the trend of information provision of the websites for BIM projects data, and this is believed to be helpful for developing an application system for BIM cases which have an organized information provision system and level as well as for bench marking.

  • PDF

Urban Regeneration Plan for Mid-sized Cities Deploying the Concept of Smart City - Focused on the US Smart City Challenge in 2015 - (스마트시티 개념을 이용한 중소도시재생계획에 대한 연구 - 2015 미국 스마트시티챌린지 공모전을 중심으로 -)

  • Yoo, Seungho;Kim, Yongseung;Kim, Soyeon
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.35 no.9
    • /
    • pp.29-40
    • /
    • 2019
  • The concept of smart city is understood as an indispensable component of urban regeneration projects in small cities in terms of providing a better urban environment and efficient living systems with a limited budget. Recently, the Korean government revised the law that related to the construction of the smart city and started to implement the smart city concept not only to new-large urban development but also to small-existed regeneration projects. However, it is difficult for small and medium-sized cities that are suffering from the insufficient professional workforce; knowledge supports for high-tech and lack of professional networks to proceed smart city planning and project that containing regional characteristics. This paper aims to examine the effective way of urban regeneration for small and medium-sized cities through smart city planning and strategy. As an important case, this paper looks at the 'Smart City Challenge' competition that was hosted by the US Department of Transportation in 2015. It examines the background and operation process of the smart city challenge competition, and then analyses each city's strategy and characteristics of seven finalists. This paper highlights the several key lessons to Korean cities: 1) the importance of national government's support in financial and professional resources; 2) the cooperation with local governments and IT corporations which provides realistic and detailed technical solutions; 3) the holistic and integrated approach to urban regeneration starting from transportation issues; 4) the necessity of the government's clear visions and guidelines toward the smart city.

Multidimensional Analysis of Unstructured Data and Trends in Architectural Review Opinions of Small and Medium-Sized Apartment Projects (다차원 분석방법을 활용한 중소규모 공동주택 건축심의 의견의 경향과 비정형 데이터로서의 특성분석)

  • Kim, Jinhee;Hwang, Taeeon;Kim, Jae-Sik;Huh, Youngki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.6
    • /
    • pp.74-80
    • /
    • 2023
  • This study examines the characteristics of architectural review opinions as unstructured data, focusing on the most challenging risk for developers of small and medium-sized apartment projects in response to the increasing number of single-person households in Korea. Using multidimensional analysis methods, the study analyzes the review opinions of 25 projects in B City. Correspondence analysis and MDS (Multidimensional Scale) analysis show that, consistent with prior research, the keywords related to 'structure' and 'planning' dominate architectural review opinions in B City. While the MDS model's stress is very poor at 34.4%, correspondence analysis reveals that this is due to the characteristics of unstructured data in architectural reviews. In addition, the non-structured data analyzed in this study, such as architectural review opinions, exhibited a probability distribution with low kurtosis and high skewness, as they involved various combinations and occurrences of data depending on the discretion of the review committee members and the specific formats of different local governments. This often led to the emergence of keywords that differed significantly from commonly mentioned terms. Although the study has some limitations, it provides a foundation for future detailed analysis by identifying the characteristics of architectural review opinions as unstructured data.

Strategy Prospects of Environmental Restoration of Stream Side in Japan(IV) (일본(日本)에서 계류변(溪流邊)의 환경복원(環境復元) 발전전략(發展戰略)(IV))

  • Park, Jae-Hyeon;Woo, Bo-Myeong;Lee, Heon-Ho
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.3 no.4
    • /
    • pp.84-90
    • /
    • 2000
  • The objective of this study was to introduce the current status and development strategy for an environmental restoration of stream side in Japan, and to consider a methodology which could be effectively applied for the environmental restoration of stream side in Korea. 1. In order to change the recent direction of the forest conservation and erosion control projects which are focused on the restoration of stream side ecology, we have to quit the past erosion control policy such as water control purpose, and establish new plans regarding on the forest conservation and erosion control which is considered the regional environmental restoration of watershed. 2. When we restore stream side and river side ecosystem, we should establish restoration plans which can keep the original nature of stream and river. 3. The forest conservation and erosion control construction projects for the restoration of stream and river ecosystem should be planned for the perfect restoration of their ecosystem by way of sustainable maintenance and management. 4. The restoration direction of stream and river ecosystem needs to be planned to restore the diversity of small geographies such as waterway, shoal and puddles rather than flattening of stream bed. 5. The main principle in the restoration of stream and river ecosystem is to accomplish forest conservation and erosion control construction projects which can conserve the existing stream and river ecosystem.

  • PDF