• 제목/요약/키워드: Skill Building

검색결과 106건 처리시간 0.024초

건설기능인력난 해결을 위한 직업교육훈련의 활성화 방안에 관한 연구 (A Study on activation way of vocational education training for construction skill manpower problems solution)

  • 이승재;오상근
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2006년도 추계 학술논문 발표대회 논문집
    • /
    • pp.133-137
    • /
    • 2006
  • Can examine cause that the construction industry is faced in crisis of skill exhaustion in two sides. One is the tribe of actuality production manpower by entry evasion and graying of young man class specially new manpower to the tribe of skill manpower. Another is qualitative decline of skill manpower. Generally, problem of the systematic knowledge tribe and the picking up tribe about new technology etc, exists because learn skill for shoulder beyond in spot. In cutting phenomenon of skill that is depended on personal relationships availability with skilled worker in hereafter, problem that worker who is old or enter through rain skilled worker does not learn all life skill is detected. These problems institute entry of young man class and necessity of systematic vocational education training specially new human strength strongly. This study does presentation of way to promote construction industry entry of young man class and improvement way of vocational education training system that can do to train these by function manpower by purpose.

  • PDF

Visualization Based Building Anatomy Model for Construction Safety Education

  • Pham, Hai Chien;Le, Quang Tuan;Pedro, Akeem;Park, Chan Sik
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.430-434
    • /
    • 2015
  • Safety education at the tertiary level prepares students to enter construction industry with adequate safety knowledge; then accidents can be prevented proactively. However, safety subject has not been paid adequate attention in universities and most institutional safety programs consider safety matters in isolation. Meanwhile, anatomical theory in the medicine field has been successfully adopted and proved potential advantageous in various scientific disciplines. With this regard, this study proposes a visualization based Building Anatomy Model (BAM) for construction safety education, which utilizes the anatomical theory in order to improve student's safety knowledge and practical skill. This BAM consists of two modules: 1) Knowledge Acquisition Module (KAM) aims to deliver safety knowledge to students through building anatomy models; 2) Practical Experience Module (PEM) where students safely perform construction activities by using the system to improve safety skill. The system trial is validated with virtual scenarios derived from real accidents cases. This study emphasizes the visualization based building anatomy model would be a powerful pedagogical method to provide effectively safety knowledge and practical skill for students, as a result, safety competence of students would be enhanced.

  • PDF

호주 어워드 시스템과 국내 건설공사 시중노임단가 체계 비교연구 (Comparative Study on Awards System of Australia and Wage Rate in Construction of Korea)

  • 임채연;백승호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.70-71
    • /
    • 2018
  • The labor cost on construction project of Korea is calculated based on the Wage Rate in Construction of Korea which is published by Construction Association of Korea. The Wage Rate in Construction of Korea does not have any variation on the wage following skill level of labor although it has 123 work categories. In addition, the classification on skill level and career of construction labor in Korea does not defined. Therefore, to establish the concept of the classification on skill level and career of construction labor, this study aim to compare the difference between Wage Rate in Construction of Korea with Award system which present grade on skilled labor.

  • PDF

건설기능인력의 기술훈련 구성에 관한 연구 (A treatise about the institute training composition plan of construction skill human resource)

  • 임재영;오상근
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2003년도 학술.기술논문발표회
    • /
    • pp.117-120
    • /
    • 2003
  • 본 연구는 건설 기능 인력의 교육 훈련을 활성화하여 건축물의 품질 확보와 일용직 근로자의 경제적 문제를 해결하는 것을 목적으로 한다. 교육훈련의 활성화를 위해서는 정부의 지원과 개입이 필요하다. 특히 청년층을 건설 현장으로 유입하기 위해서는 이들이 요구하는 것이 무엇인지 분석하여 그 요구가 충족될 수 있도록 제도록 여건을 마련한 후 이를 적극 홍보해야 한다. 또한 건설 현자에서 전문성을 인정받을 수 있도록 교육 프로그램이 개편되어야 하며 이들이 자부심을 가지고 일을 할 수 있는 사회적 여건이 조성되어야 한다.

  • PDF

The Development of Automatic Module for Formwork Layout using the BIM

  • Chijoo Lee;Sungil Ham;Ghang Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1266-1271
    • /
    • 2009
  • Formwork layout is perceived as important due to its strong tie to site works. But, most formwork is done manually and influenced by worker's skill and thus, a lot of construction errors occur. The introduction of BIM (Building Information Modeling) enables acquiring more precise information on the building shape, dimension, structure, etc. than 2D-based drawings and thus, the increased productivity, such as reduction of workload and work times, and the economic efficiency, such as reduction of formwork types and form dimensions with the consideration of constructability, are expected. This study reviewed the previous studies and formwork layout systems to derive this study's differentiations and factors to be first considered for formwork planning were derived by analyzing priorities against consideration factors. Last, a flow chart and algorithm were developed to apply the derived factors to the formwork layout module.

  • PDF

녹색 건설기술의 중점 개발 영역에 대한 추출 및 분석 (Extraction and Analysis for Emphasis Development Field in Green Construction Technology)

  • 양진국;신성준;김기남;황치호;장윤석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.306-307
    • /
    • 2014
  • Green building technology has the potential a competitiveness. Reflecting this situation, the renewable energy market is growing rapidly. And, this field became value-added field in construction industry. In this study perform to prioritize the value improvements of green building technologies. To do this, first, we will extract potential development field through literature and case studies. Next, we will built a hierarchy structure based on the economic efficiency, technical skill, and policy. Third, we decide to prioritize between the items by performing AHP analysis.

  • PDF

국내·외 TBM 시뮬레이터 개발 현황 (Current Status of Technical Development for TBM Simulator)

  • 최순욱;이철호;강태호;장수호
    • 터널과지하공간
    • /
    • 제30권5호
    • /
    • pp.433-445
    • /
    • 2020
  • TBM의 운전 전문인력은 세계적으로 부족한 상황이며 신규 인력의 시공경험 부족은 각종 시공리스크 발생 시 대응능력 저하를 가져올 수 있다. TBM 시공품질이 TBM 운전자의 숙련도와 경험에 크게 좌우되는 점과 숙련인력 부족에 의한 생산성 저하, 숙련도 저하에 의한 안전성 저하는 TBM산업에서의 자주 거론되는 문제점이다. 이를 위해 국외의 몇 개 업체와 기관에서 시뮬레이터를 개발하였고 국내에서도 시뮬레이터 개발이 이루어지고 있다. 국제터널협회에서는 강의실 교육, e-learning, 시뮬레이터 교육 및 현장 실습을 포함하는 포괄적인 교육을 계획하고 있다. 국내외 진행상황으로 볼 때, TBM 운전자 교육 및 인증 또는 라이센스를 통한 공식적인 교육 인정은 멀지 않은 미래에 표준이 될 것으로 예상된다.

공동주택 외부 석재마감에 따른 창호주위 누수방지에 관한 연구 (A Study in the Water Leakage Prevention around the Windows with the Stone Materials in the Apartment House)

  • 윤홍중;조태제
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2006년도 추계 학술논문 발표대회 논문집
    • /
    • pp.117-121
    • /
    • 2006
  • This study intends to suggest the effective methods for water leakage prevention around the windows in stone works to up-grade the outdoor public space that has been taken much portion of apartment housing trends. The subjects of the study was selected among the domestic subcontractors of stone works. There are four methods for water leakage prevention around the windows; Firstly, the painting water-proof method after the masonry. Secondly, the urethane water-proof method after galvanizing panels on the gap. Thirdly, the separation method between stone and substructure and the last one is water-proof method that they put some water-proof screen between stone and substructure with the EPDM sheets. According to the analysis of the water-proof effects, constructability and planning, we could approach to conclusion that the most influent items to the water-leakage are the filling material's deformation, the state of oxygenation and deterioration of work skill. Among the water-proof methods in construction the EPDM sheet is most excellent water-proof method to meet the technical conditions. However, we have to apply it to stone works as a water-proof method for the decrease of the leakage defects after standardizing the materials, test and construction skill because there are many work skills according the subcontractors.

  • PDF

A Low-Cost Approach for Path Programming of Terrestrial Drones on a Construction Site

  • Kim, Jeffrey;Craig, James
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.319-327
    • /
    • 2022
  • Robots for construction sites, although not deeply widespread, are finding applications in the duties of project monitoring, material movement, documentation, security, and simple repetitive construction-related tasks. A significant shortcoming in the use of robots is the complexity involved in programming and re-programming an automation routine. Robotic programming is not an expected skill set of the traditional construction industry professional. Therefore, this research seeks to deliver a low-cost approach toward re-programming that does not involve a programmer's skill set. The researchers in this study examined an approach toward programming a terrestrial-based drone so that it follows a taped path. By doing so, if an alternative path is required, programmers would not be needed to re-program any part of the automated routine. Changing the path of the drone simply requires removing the tape and placing a different path - ideally simplifying the process and quickly allowing practitioners to implement a new automated routine. Python programming scripts were used with a DJI Robomaster EP Core drone, and a terrain navigation assessment was conducted. The study examined the pass/fail rates for a series of trial run over different terrains. The analysis of this data along with video recording for each trial run allowed the researchers to conclude that the accuracy of the tape follow technique was predictable on each of the terrain surfaces. The accuracy and predictability inform a non-coding construction practitioner of the optimal placement of the taped path. This paper further presents limitations and suggestions for some possible extended research options for this study.

  • PDF

패턴을 이용한 3D 가상 건축 기술 (3D Virtual Building Technic using Pattern)

  • 한정수;김귀정
    • 한국콘텐츠학회논문지
    • /
    • 제10권8호
    • /
    • pp.66-72
    • /
    • 2010
  • 본 연구는 건축자재들을 컴포넌트로 구성하고 컴포넌트들을 패턴으로 조립하여 패턴 단위로 건축설계가 효율적으로 이루어질 수 있도록 하는 3D 가상건축 기술을 개발한다. 또한 이 기술을 이용하여 건축의 공정에 설계, 분석, 변경정보, 조립 등의 건축설계를 시뮬레이션을 통하여 건축의 손쉬운 변경과 비용을 효과적으로 절감하기 위한 기술을 지원하는 조립 건축설계 시스템 개발을 목적으로 한다. 특히 설계자와 사용자도 패턴을 이용하여 쉽게 건축물을 변경시킬 수 있으며 변경에 따라 필요한 자재들의 패턴 정보와 변경된 건축물의 설계도가 자동 생성된다. 또한 개인의 숙련도나 지식 가시화를 통해 발생할 수 있는 지식검색 역시 구현 목표로 한다.