Kim, Jung-Min;Min, Jung-Whan;Jeong, Hea-Won;Im, Eun-Kyung;Yang, Han-Joon
Journal of radiological science and technology
/
v.29
no.4
/
pp.237-240
/
2006
The Noise of CR Systems is made up of X-ray quantum mottle and additional Imaging plate's structure noise, photon noise of lumine cence, noise of electrometer, quantization noise etc. In this Regius 150 system, SNR was increased from 8.2 to 30 with linearily according to radiation dose from 0.1 mR to 100 mR. It means that the Regius 150 system has enough trustability because of SNR is over 5 by Rose Model. NPS was calculated two dementional Fourier Transform with shake of pixel value in the white Image. In the spatial frequence range of $0.5\;lp/mm{\sim}2.5\;lp/mm$, the NPS was distributed $10^{-4}{\sim}10^{-5}$ at 1 mR X-ray dose. That is similar result compare other systems to that of Kodak CR system reported by Carlu, HR-CR system reported by Dobbins.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.22
no.2
/
pp.107-113
/
2008
In 22.9[kV]-y distribution systems, underground cables are provided with multiple-point ground in which each coaxial-neutral line of the distribution cable lines(A, B, C phases) is 3-wire common grounded. In the underground cable distribution systems, circulating current flows in the coaxial-neutral lines and its magnitude amounts to about $40{\sim}50[%]$ load currents, even though loads are balanced. Power loss due to the circulating current consequently reaches to about 76[%] total losses occurred in all conductor lines. This power loss provokes additional temperature rise of the underground cable lines and finally results in 20[%] reduction of the current capacity of the cables. This paper presents a new ground method to overcome such a problem. The proposed method eliminates the circulating current flowing in the coaxial-neutral line effectively. Measurement results confirmed from the practical site-test show validity and effectiveness of this research.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.22
no.2
/
pp.85-93
/
2008
In 22.9[kV]-y distribution systems, underground cables are provided with 3-wire loop multiple-point ground in which each coaxial-neutral line of the distribution cable lines(A, B, C phases) is 3-wire common grounded at every connecting section. In the underground cable distribution systems, circulating current flows in the coaxial-neutral lines and its magnitude amounts to about $40{\sim}50[%]$ load currents, even though loads are balanced. This paper presents a new ground method to overcome such a problem and a comprehensive analysis in tows of current capacity of power cables, induced voltage of cable sheath, and electromagnetic interference voltage from power cable lines.
The Journal of The Korea Institute of Intelligent Transport Systems
/
v.7
no.6
/
pp.63-69
/
2008
Reconfigurable RF one-chip solutions have been researched with the objective of designing for smaller-sized and more economical RF transceiver and it can be applied to a vehicular wireless terminal. The proposed voltage-controlled oscillator satisfies the targeted frequency range ($4.2{\sim}5.4\;GHz$) and the frequency planning which correspond to the standards such as CDMA(IS-95), PCS, GSM850, EGSM, WCDMA, WLAN, Bluetooth, WiBro, S-DMB, DSRC, GPS, and DVB-H/DMB-H/L(L Band). In order to improve phase noise performance, PMOS is adopted in the cross-coupled pair, the tail current source and MOS varactor in this VCO and differential-typed switching is proposed in capacitor array. Based on the measurement results, a total power dissipation is $5.3{\sim}6.0\;mW$ at 1.8 V power supply voltage. The oscillator is tuned from 4.05 to 5.62 GHz; The tuning range is 33%. The phase noise is -117.16 dBc/Hz at 1 MHz offset frequency and the FOM (Figure Of Merit) is $-180.84{\sim}-180.5$.
This paper describes the results of reliability prediction analysis of control rod control system, which is being developed as part of KNICS project. The results of reliability prediction indicate MTBF(Mean Time Between Failure) of cards for control rod control system. A purpose of reliability prediction is to evaluate MTBF of cards, identify the design drawbacks of cards, and propose design improvement to a designer to help design the more reliable control rod control system. This reliability prediction analysis used the the part count and part stress method in the basis of MIL-HDBK-217F.
Automatic control systems(AVR, Governor, Synchronizer) installed $1970{\sim}1980$ in K-water were considered to be rehabilitated around 2000. Moreover, Korea Power Exchange market system was changed from PPA (Power Purchase Agreement) to a bidding system. Therefore, depending on the power quality, the power provider could achieve additional profits. It is the excitation system and governor that have the functions of enhancing power necessities. During the 20 to 30 years of generator operation, there were many major and minor problems. Examples are SCR burnout (Andong: Excitation system), hunting (Imha: governor), field circuit breaker failure (Chungju 1st: excitation system), the rise of leakage current (Chungju 2nd: excitation system), power supply burnout (Chungju 2nd: governor). These are the typical examples of malfunction which hindered the generator operation and, consequently, diminished the profit of power business. In order to satisfy the needs of the power market and prevent malfunctions mentioned above, the rehabilitation of AVRs and governors were executed. A new system was made to have the flexibility of ancillary service (GF, AGC, etc.), PSS function. With user friendly HMI software, it is more convenient for the operator to fulfill suitable maintenance. It was possible to connect SCADA system by opening protocol of AVR, governor for the efficiency of operation and maintenance.
Kim, Sun-Jae;Jo, Hyang-Eun;Jeong, Gi-Woo;Kil, Gyung-Suk;Kim, Sung-Wook
Journal of the Korean Institute of Electrical and Electronic Material Engineers
/
v.28
no.1
/
pp.40-45
/
2015
Electrode systems: a protrusion on conductor (POC), a protrusion on enclosure (POE), a crack in epoxy plate and a free particle (FP) were fabricated to simulate insulation defects in a gas insulated switchgear (GIS). $SF_6$ gas was filled in the electrode systems by 3 bar and/or 5 bar, respectively. Partial discharge (PD) pulses were detected through a $50{\Omega}$ non-inductive resistor. A calibration test was carried out according to IEC 60270, and the sensitivity was 0.25 pC/mV. PD pulses were distributed in the phase of $50^{\circ}{\sim}135^{\circ}$ and over 95% of them existed in the phase of $55^{\circ}{\sim}120^{\circ}$ for the POC. PD pulses were distributed in the phase of $230^{\circ}{\sim}310^{\circ}$ and over 90% of them existed in phase of $220^{\circ}{\sim}300^{\circ}$ for the POE. PD pulses occurred in the phase of $40^{\circ}{\sim}60^{\circ}$ and $220^{\circ}{\sim}300^{\circ}$ for the crack, and pulse counts were 25% higher in negative polarity than in positive polarity. PD pulses were distributed in every phase unlike to other three electrode systems and the peak magnitude was measured at $118^{\circ}$ and $260^{\circ}$ for the FP. As described above, PD pulses were observed in positive polarity for the POC, in negative one for the POE, in both one for the crack and the FP. In conclusion, it is expected that the identification rate of defect type can be improved by considering the polarity ratio of PD pulses on the PRPDA method.
Sun, Young Ghyu;Hwang, Yu Min;Sim, Issac;Kim, Jin Young
The Journal of The Korea Institute of Intelligent Transport Systems
/
v.17
no.4
/
pp.150-158
/
2018
In this paper, we introduce an electric vehicle charging system using power line communication and propose a method to correct the error by applying a deep learning algorithm when an error occurs in the control signal of an electric vehicle charging system using power line communication. The error detection and correction of the control signal can be solved through the conventional error correcting code schemes, but the error is detected and corrected more efficiently by using the deep learning based error correcting code scheme. Therefore, we introduce deep learning based error correction code scheme and apply this scheme to electric vehicle charging system using power line communication. we proceed simulation and confirm performance with bit error rate. we judge whether the deep learning based error correction code scheme is more effective than the conventional schemes.
The Journal of Korean Institute of Communications and Information Sciences
/
v.31
no.6C
/
pp.603-613
/
2006
Low-power design is one of the most important challenges encountered in maximizing battery life in portable devices as well as saving energy during system operation. In this paper we propose a low-power DCT (Discrete Cosine Transform) architecture using a modified Computation Sharing Multiplication (CSHM). The overall rate of Power consumption is reduced during DCT: the proposed architecture does not perform arithmetic operations on unnecessary bits during the Computation Sharing Multiplication calculations. Experimental results show that it is possible to reduce power dissipation up to about $7\sim8%$ without compromising the final DCT results. The proposed low-power DCT architecture can be applied to consumer electronics as well as portable multimedia systems requiring high throughput and low-power.
Journal of the Institute of Electronics Engineers of Korea SC
/
v.44
no.4
s.316
/
pp.21-26
/
2007
Output voltage waves of a DC/AC inverter system are likely to be distorted if variable loads e.g. motors or rectifiers exist in the output terminal. This paper designs a disturbance observer-based PI-controller for a single-phase inverter system that is robust against load changes. In this Paper, we regard the output voltage changes due to various loads as disturbances of the control system. Then we design a disturbance observer for estimation of the disturbances caused by the load current and any other error sources (such as parameter uncertainties and model mismatches etc.). In order to test the performance of the proposed control law, simulation studies are carried out for a single-phase inverter system using SimPowerSystem of Matlab Simuink. Compared to a simple PI-control, the disturbance observer-based controller shows enhanced performance in transient responses for step load changes.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.