• Title/Summary/Keyword: Side tunnel

Search Result 335, Processing Time 0.023 seconds

Three-dimensional numerical parametric study of shape effects on multiple tunnel interactions

  • Chen, Li'ang;Pei, Weiwei;Yang, Yihong;Guo, Wanli
    • Geomechanics and Engineering
    • /
    • v.31 no.3
    • /
    • pp.237-248
    • /
    • 2022
  • Nowadays, more and more subway tunnels were planed and constructed underneath the ground of urban cities to relieve the congested traffic. Potential damage may occur in existing tunnel if the new tunnel is constructed too close. So far, previous studies mainly focused on the tunnel-tunnel interactions with circular shape. The difference between circular and horseshoe shaped tunnel in terms of deformation mechanism is not fully investigated. In this study, three-dimensional numerical parametric studies were carried out to explore the effect of different tunnel shapes on the complicated tunnel-tunnel interaction problem. Parameters considered include volume loss, tunnel stiffness and relative density. It is found that the value of volume loss play the most important role in the multi-tunnel interactions. For a typical condition in this study, the maximum invert settlement and gradient along longitudinal direction of horseshoe shaped tunnel was 50% and 96% larger than those in circular case, respectively. This is because of the larger vertical soil displacement underneath existing tunnel. Due to the discontinuous hoop axial stress in horseshoe shaped tunnel, significant shear stress was mobilized around the axillary angles. This resulted in substantial bending moment at the bottom plate and side walls of horseshoe shaped tunnel. Consequently, vertical elongation and horizontal compression in circular existing tunnel were 45% and 33% smaller than those in horseshoe case (at monitored section X/D = 0), which in latter case was mainly attributed to the bending induced deflection. The radial deformation stiffness of circular tunnel is more sensitive to the Young's modulus compared with horseshoe shaped tunnel. This is because of that circular tunnel resisted the radial deformation mainly by its hoop axial stress while horseshoe shaped tunnel do so mainly by its flexural rigidity. In addition, the reduction of soil stiffness beneath the circular tunnel was larger than that in horseshoe shaped tunnel at each level of relative density, indicating that large portion of tunneling effect were undertaken by the ground itself in circular tunnel case.

The study for the aerodynamic effects of air-shafts in the railway tunnel (철도터널 통풍공의 공기역학적 성능에 대한 연구)

  • Kim, Dong-Hyeon;Kang, Bu-Byoung;Shin, Min-Ho
    • Proceedings of the KSME Conference
    • /
    • 2001.06e
    • /
    • pp.341-348
    • /
    • 2001
  • The purpose of present study is to investigate for reducing pressure fluctuations in the case of installing the air-shafts on the side wall of the tunnel with small cross-sectional area on conventional line. Experiments were performed with a 1/61-scale moving model rig for the tunnel of 0.764 km length in the condition of tunnel cross-section area of $28 m^2$. According to the results, the maximum pressure fluctuation is reduced by 45 % for 19 air-shafts. This results have the speed-up effects of about 33.4 km/h for the train running in tunnel.

  • PDF

Numerical Analysis of 3-Dimensional Unsteady Flow Around the High Speed Train (고속으로 주행하는 열차 주위의 3차원 비정상 유동장 해석)

  • Ha, Seong-Do
    • 연구논문집
    • /
    • s.27
    • /
    • pp.15-34
    • /
    • 1997
  • The 3-dimensional unsteady compressible flows around the high speed train have been simulated for the train entering a tunnel and for passing another train. The simulation method employs the implicit approximation-factorization finite difference algorithm for the inviscid Euler equations in general curvilinear coordinates. A moving grid scheme is applied in order to resolve the train movement relative to the tunnel and the other train. The velo-city and pressure fields and pressure drag are calculated to study the effects of tunnel and the other train. The side directional force which is time dependent is also computed for the passing train. Pressure distribution shows that the compression wave is generated in front of the train noise just after the tunnel entrance and proceeds along the inside of tunnel.

  • PDF

NLOS Propagation Characteristics in a Curved Subway Tunnel (지하철 곡선 터널에서의 NLOS 전파 특성)

  • 정회동;윤찬의;강영진;송문규
    • Proceedings of the IEEK Conference
    • /
    • 2003.07a
    • /
    • pp.322-325
    • /
    • 2003
  • In this paper, path loss characteristics in a curved subway tunnel are measured and analyzed. The measurement is carried out in the frequency bands of 2.45GHz and 5.8GHz. A directional antenna is employed for transmission and an omnidirectional antenna for reception. This measurement is performed in the subway tunnel in the vicinity of the Daejon station. The tunnel is curved and its cross section is arch-shaped. The path loss is measured with the location of the transmitter antenna fixed and the receiver antenna moving in the tunnel. The measured path loss ratio is about 0.1dBm/m. Also, the signal received from the antenna located on the outer side of curve in the tunnel experiences weaker path loss.

  • PDF

Detection of Noise Sources in a Cavitation Tunnel by using Beam-Forming Method (빔형성 기법을 이용한 공동수조 내부의 소음원 탐지)

  • 이정학;서종수
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2003.05a
    • /
    • pp.749-754
    • /
    • 2003
  • In this paper, we introduce the measurement of the underwater noise with 32channel hydrophone array of Samsung CAvitation Tunnel (SCAT) and the detection technique of noise sources by using the beam-forming method. Measurement and way signal Processing under fluid flow are essential works for the underwater acoustics, especially for the detection of noise sources. As the acoustic impedance of the water is relatively high and the tunnel is an enclosed system, we have to consider the interaction between tunnel and water together with the reflection of noise in the beam-forming technique. Also, for a hydrophone array system that is fixed on one side of tunnel wall as done in SCAT is liable to suffer from some limitations in the detection of the noise sources with the array, we discuss these limitations particularly on the frequency range and spacing of noise sources.

  • PDF

The CO Gas Concentration Characteristics in a Sound Proof Road Tunnel According to the Upper Opening Installation Distance Interval (방음터널 내부의 상부배출구 간격에 따른 CO 농도분포 특성)

  • Park, Myung Sig
    • Journal of ILASS-Korea
    • /
    • v.21 no.3
    • /
    • pp.162-169
    • /
    • 2016
  • When we construct a road near an apartment complex, we consider a soundproof wall. To make residential places quieter, we may consider a soundproof road tunnel. Such a tunnel, however, would become highly concentrated with soot from vehicles whenever a traffic jam might occur. To create an optimum design, this study utilizes the PHOENICS-VR software. The work considers three cases: (1) no openings (2) openings at 30m intervals, and (3) openings at 60m intervals on the upper side of the tunnel. The study finds that in the second case shows CO concentration distributions were 15% less than those without openings. And the CO concentration distributions of the second and third cases are almost the same. The findings suggest that we should make the soundproof tunnel to reduce construction fees.

Hard rock TBM project in Eastern Korea

  • Jee, Warren W.
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2008.10a
    • /
    • pp.33-41
    • /
    • 2008
  • The longest tunnel has been halted at Daekwanryung by the failure of the host country of the Winter Olympiad in 2014, but modern High-Power TBM will come to Korea to excavate these long tunnels to establish the better horizontal connection between the western and eastern countries to improve the strong powerful logistic strategy of Korean peninsula. Train operation provides a key function of air movements in a long underground tunnel, and heat generation from transit vehicles may account of the most heat release to the ventilation and emergency systems. This paper indicates the optimal fire suppress services and safety provision for the long railway tunnel which is designed twin tunnel with length 22km in Gangwon province of Korea. The design of the fire-fighting systems and emergency were prepared by the operation of the famous long-railway tunnels as well as the severe lessons from the real fires in domestic and overseas experiences. Designers should concentrate the optimal solution for passenger's safety at the emergency state when tunnel fires, train crush accidents, derailment, and etc. The optimal fire-extinguishing facilities for long railway tunnels are presented for better safety of the comfortable operation in this hard rock tunnel of eastern mountains side of Korea. Since year 1900, hard rock tunnel construction has been launched for railway tunnels in Korea, tunnels have been built for various purposes not only for infrastructure tunnels including roadway, railway, subway, and but also for water and power supply, for deposit food, waste, and oils etc. Most favorable railway tunnel system was discussed in details; twin tunnels, distance of cross passage, ventilation systems, for the comfortable train operations in the future.

  • PDF

A Development of the Light Weight Noise Tunnel on a High Degree of Efficiency and Environmentally Friendly for Railway (철도용 고효율 친환경 경량방음터널 기술개발)

  • Son, Jeong-Gon;Park, Gwang-Hyeon;Ryu, Rae-Eon
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2014.04a
    • /
    • pp.487-490
    • /
    • 2014
  • These Days a lot of Noise Complaints in vicinity of Railway has been more increase than before. Almost 1/3 Residences who lives in Railway side are Exposure to Noise Pollution. Since the Apartment Buildings around Railway are getting more higher, so those of the Noise Barrier are not best solution anymore. We are going to make a New Plane with the state of the art technology for Railway Noise Abatement Control. Our Goal are focus on a development of Light Weight Noise Tunnel designed by new absorption mat'l and tunnel Stucture on the Overbridge and Viaduct of existing Railway. New Noise Tunnel will be reducing their weight more than 30% against Road Traffic One and also 10dB(A) Noise Reduction against Noise Barrier.

  • PDF

NUMERICAL STUDY ON WIND TUNNEL GROUND PLATE WITH A PRESSURE CONTROL DEVICE (압력 조절 장치를 갖는 풍동 지면판에 관한 수치해석적 연구)

  • Lee, M.J.;Kim, C.W.
    • Journal of computational fluids engineering
    • /
    • v.15 no.4
    • /
    • pp.53-59
    • /
    • 2010
  • Preliminary design of a ground plate, a device installed close to the aircraft model for wind tunnel test to simulate the ground effect, was performed by a numerical simulation. A two-dimensional numerical study was performed initially to decide the optimal leading edge and flap configurations. Then, three-dimensional studies were conducted to decide the optimal flap deflection angle for pressure distribution reduction since the plate and the plate supporting system generate static pressure difference between the upper and lower flow regions. Three-dimensional simulation additionally studied the effect of the clearance between the plate and the wind tunnel side wall. For the efficiency of computation, half model was simulated and a symmetric boundary condition was applied on the center plane. Based on the preliminary design, a ground plate was designed, manufactured and tested at the Korea Aerospace Research Institute(KARI) wind tunnel. The measured pressure differences versus flap deflection angle agreed well with the predicted results.

The effect of air-shafts on reducing the pressure fluctuations in the tunnel with small cross sectional area on conventional line (소단면 기존 철도터널에서 통풍공 개수에 따른 터널내 풍압변동 저감효과에 대한 연구)

  • 김동현;강부병;이재환;신민호;이성욱
    • Proceedings of the KSR Conference
    • /
    • 2000.11a
    • /
    • pp.382-389
    • /
    • 2000
  • The purpose of present study is to investigate for reducing pressure fluctuations in tile case of installing tile air-shafts on the side wall of the tunnel with small cross-sectional area on conventional line. Experiments were performed with a 1/61-scale moving model rig for the tunnel of 0.764km length in the condition of tunnel cross-section area of 28 ㎡ According to the results, the maximum pressure fluctuation is reduced by 45% for 19 air-shafts. This results have the speed-up effects of about 33.4km/h for the train running in tunnel.

  • PDF