• Title/Summary/Keyword: Shortening Construction duration

Search Result 24, Processing Time 0.022 seconds

THE KEY SUCCESS VEHICLES FOR FAST-TRACK IN PUBLIC DESIGNBUILD PROJECTS

  • Kyu-Man Cho;Kyo-Jin Koo;Chang-Taek Hyun
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1094-1099
    • /
    • 2005
  • Nowadays the Design-Build Delivery Method in public sector has been remarkably grown up in applying owing to its merits such as shortening construction duration. The Fast-Track is the wide-using method for accelerating schedule at Design-Build projects. But the public agency is in trouble to execute Fast-Track because of the lack of guideline for its process. As a result, in some cases applying Fast-Track methods, cost and construction duration are increased more than cases of non-Fast-Track projects. In this study, through the questionnaire surveys to professionals having actual implementation experiences as a construction manager, owner or general contractor, key success vehicles of Fast-Track are induced.

  • PDF

A Study on Estimating Normal Project Duration of Apartment Remodeling Project (공동주택 리모델링공사 표준공기 설정에 관한 연구)

  • Yoon, Jongsik;Yu, Ilhan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.12-20
    • /
    • 2017
  • The biggest reason to prefer the remodeling is a relatively short period of time (5~6 years) compared to the reconstruction work that takes 8~9 years. In addition, from the perspective that the period of temporary residence is usually 24 months, the necessity of shortening is greater. Also, since the remodeling construction period is approximately 28~35 months on average, the strategies and efforts are needed to make up for the shortening the remodeling construction period. For these reasons, this paper is to develop an estimating model for normal project duration of apartment remodeling project. This model is reflected in the remodeling properties thorugh difference analysis of the new apartment construction project. Demolition works, reinforcement works, extension works are different, so this paper newly defines these construction work's duration in normal project duraion of remodeling. Case study and experts interviews are used to validate normal project duration. This model can be used to calculate rough construction period each alternatives, and will help a strategic decision making among the stakeholders.

An Experimental Study on Strength Properties of Early Strength Concrete for Reduction of Working Period in Apartment (공동주택 공기단축을 위해 개발된 조강 콘크리트의 강도 발현 특성에 관한 연구)

  • Jung, Yang-Hee;Lee, Jae-Hyun;Keum, Kyoung-Hun;Lee, Won-AM;Kim, Sun-Man
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.157-160
    • /
    • 2009
  • The decision of the Form removal time which leads the early assuring strength of the concrete from Apartment construction is the fact which is important from Reducing the period of works and the economical efficiency side. Especially, with Complex building of recent times the same Tall building and Multiple Apartment Site which only follows in upgrade of interior construction of apartment site and shortening the frame construction period becomes very, importantly is the actual condition where the effort which is various for this is attempted. But is caused by with limit and economical efficiency problem of case concrete early strength revelation of most and is not put to practical use is the actual condition. Develops concrete mixture which is a utility from the research which sees hereupon and the effect which is economic leads construction duration shortening under maximizing boil.

  • PDF

A Study on Early-strength Development of Concrete Using Accelerating AE Water Reducing Agents for the Estimation of Optimum Duration (촉진형 AE감수제를 사용한 콘크리트의 최적공기산정을 위한 조기강도 발현 특성 연구)

  • Lee, Joo-Hun;Sa, Soon-Heon;Ji, Suk-Won;Jeon, Hyun-Gyu;Seo, Chee-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.11a
    • /
    • pp.91-94
    • /
    • 2006
  • The way to shorten a construction period is considered to an very important technology development element as reducing the formwork removal periods with promoting strength revelation own concrete. This study executed experiment to review usability of early strength revelation chemical admixture which is judged in ways effective with premature removal of form about concrete. Use of early strength revelation AE water reducin admixture is apperaing so that strength revelation by early hydration promotions is excellent. The results of being applied proposed work process are that compressive strength are appeared more than 5MPa within 16 hours so that removal of vertical form was possible. the concrete compressive strength satisfied with a more than 2/3 of specified concrete strength for removal of horizontal form are appeared in 42 hours of 27 MPa proportioning strength, in 36 hours of 30, 35 MPa proportioning strength so that the 6 days cycle time of concrete structural frame work is cut by 2 days as shortening delayed period in works of removing slab forms. So construction cost reductions and a construction period shortening are judged so that it is possible.

  • PDF

A DECISION MAKING FRAMEWORK FOR REDUCING PROJECT DURATION BY APPLYING CONCURRENT ENGINEERING IN CONSTRUCTION

  • Han, Jin-Taek;Choi, Do-Seung;Lee, Jae-Seob
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1540-1547
    • /
    • 2009
  • Steel frame factories were surveyed in this study in order to explore the possibility of shortening the construction time and save on construction cost through overlapping at the stages of design or construction. In the survey, construction professionals were interviewed in order to collect quantitative data. Hypotheses were then formulated, and the data was thereby analyzed using the simulation technique in order to analyze the effects of the concurrent engineering method on shorter construction time and cost saving. In addition, actual cases were analyzed to determine the overlapping rates of major processes in terms of shorter construction time and cost saving and to analyze the relationship between time and cost due to overlapping.

  • PDF

Construction Application of a Newly Developed Form-Latticed Prefabricated Steel Reinforced Concrete Column (Form-LPSRC 기둥 개발 및 적용 연구)

  • Baek, Hojin;Lee, Seung-Hwan;Kim, Sooyoung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.487-495
    • /
    • 2014
  • Shortening the construction duration of structural frame work is extremely important because the work accounts for a major percentage of all cost and duration in large projects. For this reason, new construction methods to reduce the duration of structural frame work are being continuously studied and developed. A PSRC composite column, which uses steel angles instead of H-beams, has the advantages of flexural strength and ductility. Moreover, with this PSRC technique, conventional work for reinforcing bars in columns in practice can be skipped. However, one limitation exists in which the form work is still required. This research proposes a Form-LPSRC column method that is prefabricated with the column frame that includes permanent forms attached. Feasibility was examined with mock-up specimens and finally, the technique applied to real practice. Compared to the conventional SRC column method, this study demonstrated that the proposed technique has many advantages in construction duration, cost, quality, safety and environment.

Analysis of Construction RCB Exterior Wall Formwork Placing High on Nuclear Power Plant (원자력 발전소 RCB 외벽 거푸집 1단 타설 높이별 시공성 분석)

  • Song, Hyo-Min;Shin, Yoon-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.205-206
    • /
    • 2014
  • It is very important to reduce the construction duration of the Reactor Containment Building (RCB) when considering the more than 50 months on average from concrete placement to completion. The purpose of this study attempts to evaluate the single-stage workability of the system given a change in the height of the setting of RCB exterior wall formwork to be used in nuclear power plant construction. As a result of this study, it is possible height of 3.5m~4m uses formwork when analyzing the construction period and material costs an increase in formwork by concrete lateral pressure, to ensure the workability of the RCB exterior wall formwork. Through this study, I want to provide as basic data for the improvement of workability and RCB shortening the construction period.

  • PDF

Features of Temperature Distribution of Exposed Reinforcement Bars Depending on Changes of Covering Methods of Bubble Sheets (버블시트 피복방법 변화에 따른 동절기 노출철근의 온도분포 특성)

  • Lee, Jea-Hyeon;Lee, Sang-Un;Lee, Joung-Gyo;Yang, Seong-Hwan;Kyung, Yeong-Hyeok;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.11-12
    • /
    • 2016
  • The contemporary buildings are becoming super-taller gradually as the industry evolves. Accordingly, winter concrete also became an important element for the year-round construction since shortening of a construction duration became important. Accordingly, this research team once developed a double bubble sheet as concrete cover curing compound during winter. But since there is no proper countermeasure for the exposed reinforcement bars, it is worried that the concrete can be damaged by exposed frozen reinforcement bars at a low temperature during the initial period. Therefore, in this study, it is intended to review the temperature history of the reinforcement bars depending on changes of the covering methods of the exposed reinforcement bars by using bubble sheets.

  • PDF

Fire Resistant Regulation Status and Activation Plan of Domestic Modular Construction (국내 모듈러 건축의 내화구조 제도 현황 및 활성화 방안)

  • Choi, Yun-Jeong;An, Jae-Hong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.6
    • /
    • pp.673-680
    • /
    • 2022
  • Modular construction is recognized as a construction method with various advantages, such as shortening the construction duration, achieving quality control through factory production, ease of maintenance, and reduced construction costs due to reduced weight of materials. However, despite efforts by the modular industry and government to activate modular construction, it has rarely been established in the domestic market. Currently, there are technical limitations to the modular construction fire resisting technology applied to general buildings. The lack of access to modular construction fire resistance regulation is considered a major factor. In this study, the current status and problems with modular construction fire resistance regulation, a significant hindrance factor, were considered to activate modular construction. This study is intended to present a direction for institutional improvement in modular construction fire resistance and a direction for research and development.

An Economic Analysis of Steel Framed Modular Housing: Compared with Case of Urban Type Living Housing of Wall-slab (강재 프레임 주택형 모듈러의 경제성 분석: 벽식구조인 도시생활형주택과의 사례비교를 통해)

  • Bang, Jong-Dae;Chun, Chu-Young;Park, Ji-Young;Kim, Jong-Yeob;Kim, Gap-Deug;Chun, Young-Soo
    • Land and Housing Review
    • /
    • v.5 no.4
    • /
    • pp.305-314
    • /
    • 2014
  • The technology-intensive unit modular method of factory production method is attracting attention by the limit of the labor-intensive and field centered wet construction method. In recent years, the unit modular method has been applied to the construction of schoolhouse and BOQ(bachelor offices' quarters), dormitories, etc. But the modular method still is not used in housing construction by the lack of verification of resident performance and construction cost. Therefore, this study analyzed the economics of modular house to vitalize the constructed residential building by modular method and to develop the modular method. According to the study results, the construction cost of the modular house was analysed more about 6.2% expensive than that of the existing housing. However, if the construction duration of modular house is shortened or the productivity of modular house is increased, the construction cost of modular house will be similar to the that of the existing house.