• Title/Summary/Keyword: Shorten method

Search Result 479, Processing Time 0.037 seconds

Effect of Materials and Construction Conditions on Shotcrete Quality (숏콘크리트 품질에 미치는 재료 및 시공 조건의 영향)

  • 현석훈;한기석
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1994.04a
    • /
    • pp.227-232
    • /
    • 1994
  • Recently, TBM (Tunnel Boring Machince) method for a tunnel construction in domestic is very promisible due to shorten a constrution period. It is very important to increase the efficiency of the shotcrete for the TBM. The major factors influencing the efficienty of shotcrete are materials, mix disign, constrution conditions and skill of nozzle-man. In this paper, first, optimum synthesize conditions for the shotcrete accelerators was explored and early stiffenting mechanisms also studied. Second, TBM method was applied for a real job site using the optimum conditions obtained from a lab scale experiment.

  • PDF

Development of robot calibration method based on 3D laser scanning system for Off-Line Programming (오프라인 프로그래밍을 위한 3차원 레이저 스캐닝 시스템 기반의 로봇 캘리브레이션 방법 개발)

  • Kim, Hyun-Soo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.3
    • /
    • pp.16-22
    • /
    • 2019
  • Off-line programming and robot calibration through simulation are essential when setting up a robot in a robot automation production line. In this study, we developed a new robot calibration method to match the CAD data of the production line with the measurement data on the site using 3D scanner. The proposed method calibrates the robot using 3D point cloud data through Iterative Closest Point algorithm. Registration is performed in three steps. First, vertices connected by three planes are extracted from CAD data as feature points for registration. Three planes are reconstructed from the scan point data located around the extracted feature points to generate corresponding feature points. Finally, the transformation matrix is calculated by minimizing the distance between the feature points extracted through the ICP algorithm. As a result of applying the software to the automobile welding robot installation, the proposed method can calibrate the required accuracy to within 1.5mm and effectively shorten the set-up time, which took 5 hours per robot unit, to within 40 minutes. By using the developed system, it is possible to shorten the OLP working time of the car body assembly line, shorten the precision teaching time of the robot, improve the quality of the produced product and minimize the defect rate.

Shift-and-Add Multiplication Algorithm for Decimal System (십진수의 자리이동-덧셈 곱셈법)

  • Lee, Sang-Un
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.14 no.2
    • /
    • pp.121-126
    • /
    • 2014
  • The problem of finding the fastest algorithm for multiplication of two large n-digit decimal numbers remains unsolved in the field of mathematics and computer science. To this problem so far two algorithms - Karatsuba and Toom-kook - have been proposed to shorten the number of multiplication. In the complete opposite of shorten the number of multiplication method, this paper therefore proposes an efficient multiplication algorithm using additions completely. The proposed algorithm totally applies shift-and-add algorithm of binary system to large digits of decimal number multiplication for example of RSA-100 this problem can't perform using computer. This algorithm performs multiplication purely with additions of complexity of $O(n^2)$.

Comparison of Driving Time between Stop-motion Method and Moving-motion Method

  • Kim, Soon-Ho;Kim, Chi-Su
    • Journal of Advanced Information Technology and Convergence
    • /
    • v.8 no.2
    • /
    • pp.139-145
    • /
    • 2018
  • Improvement of the speed of the gantry among equipment that mounts a chip using SMT can improve productivity. In order to improve the performance of the gantry, there are studies such as a method of increasing the speed of adsorption, the speed of the gantry by reducing the weight, and a method of facilitating the use of the gantry. But all of these are ways of improving equipment. In this paper, we propose a method to improve the speed of gantry mounting microchip. The method is to shorten the driving time of the gantry. To do this, calculate the driving time using the existing method. And we calculate the travel time using the method presented in this paper. As a result, the time calculated by the proposed method is reduced by 14%.

Research on the Strategy for Outsourcing in Construction Projects: in Fast-track Project (건설프로젝트에서 전략적 하도급 방안에 관한연구 : 설계시공병행방식 사례를 중심으로)

  • Choi, Soo-Ho;Choi, Hyun-Chul;Choi, Hye-Mi;Kim, Ju-Hyung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.6
    • /
    • pp.551-559
    • /
    • 2014
  • Fast-tracking was developed as an optimizing method to shorten the duration of construction project in 1960's, and it introduced to Korea in 1999. Since then, many Korean companies have been used fast-tracking for getting economical benefit from shorten duration. However, there were some problems(dispute, delay and cost overrun) because of using inappropriate subcontractor management system. For this reason, previous studies suggested some management models to solve these problems. Unfortunately, however, the models have been had some doubts about reliability, objectivity and possibility of using them on real construction site. Therefore, this study suggests 3 steps of strategic subcontracting method and apply it on real fast-tracking practice(L company) to secure reliability and objectivity. Through this, the method is expected to make up the doubts of previous studies.

Development of a trench shield machine for the near-surface railway construction (저심도 철도 건설을 위한 트렌치 쉴드 장비 개발연구)

  • Lee, So-Oh;Sagong, Myung;Kim, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.2
    • /
    • pp.175-187
    • /
    • 2015
  • In this paper, the development of trench shield machine for near-surface railway construction were presented. The Near-surface railway can be constructed by cut and cover construction method, because it is installed at the depth of 5~7 m below roads. The cut and cover construction method mostly use temporary supports. The limitation of the cut and cover method is high installation cost and long construction period. To overcome these disadvantages, development of the trench shield machine is proposed and expected to shorten the construction time and cost of near-surface railway system. The sliding retaining wall of trench shield equipment replaces the role of temporary support (solider piles and lagging) and excavator equiped to the bottom front of the machine shorten the excavation time. This paper deals with design of the bit attached to the excavator and required capacity of the motor.

Updated Object Extraction in Underground Facility based on Centroid (중심점 기반 지하시설물 갱신객체 추출 기술)

  • Kim, Kwagnsoo;Lee, Kang Woo;Kim, Bong Wan;Jang, In Sung
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.38 no.6
    • /
    • pp.553-559
    • /
    • 2020
  • In order to prevent subsidence in urban areas, which is a major cause of damage to aging underground facilities, an integrated underground space map is being produced for systematic management of underground facilities. However, there is a problem of delaying the update time because an unupdated underground facility object is included in the process of updating the underground space integrated map. In this paper, we proposed a method to shorten the update time of the integrated map by selecting only the updated objects required for the update process of the underground space integrated map based on the central point of the underground facilities. Through the comparison of the centroid, the number of search targets is greatly reduced to shorten the search speed, and the distance of the actual location values between the two objects is calculated whether or not the objects are the same. The proposed method shows faster performance as the number of data increases, and the updated object can be reflected in the underground space integrated map about four times faster than the existing method.

A Novel Fractal Coding Method for Image Communication (영상통신을 위한 새로운 프랙탈 부호화 기법)

  • 김정일;김병천
    • Journal of the Korea Society of Computer and Information
    • /
    • v.3 no.3
    • /
    • pp.99-106
    • /
    • 1998
  • This Paper proposes a novel fractal image method for image communication to shorten time to take on fractal encoding by using limited search area method and scaling method First, the original image is contracted respectively by half and by quarter with the scaling method. And then, the corresponding domain block of the quarter-sized image which is most similar with one range block of the half-sized image is searched within the limited area in order to reduce the encoding time extremely As the result of the evaluation, the proposed algorithm provided much shorter encoding time and better compression ratio with a little degradation of the decoded image quality than Jacquin's method.

  • PDF

A Study on Improvement of Method for Measuring the Shield Performance of Shielding Enclosures (전자파 차폐실의 차폐효과 측정방법 개선에 관한 연구)

  • Yeon, Jae-Sung;Kim, Hie-Sik
    • Proceedings of the IEEK Conference
    • /
    • 2009.05a
    • /
    • pp.350-353
    • /
    • 2009
  • The shielding enclosure is very essential device to test the electromagnetic wave power generated by various RF equipments. Some standards for the shielding enclosures were established to test them in right method. Generally, There are IEEE-STD-299 and MIL-STD-285 and NSA-65-6 of the method for measuring the effectiveness of shielding enclosures, the IEEE-STD-299 combined MIL-STD-285 and NSA-65-6 about the method for measuring shielding effectiveness(SE) about 1969 years, but, the measurement point of 299 proposal is many points(including shielding wall, seam, coner beat, shielding door, etc) and demand long time of measurement. To improve SE test method for shielding enclosures was studied and suggested to develop a proper test procedure. First, we measure reference level as frequency range and H/V polarization, secondly, measure leakage point, and finally, measure shield effect and calculate SE. Our method has a merit of the less measurement point than IEEE-STD-299, and shorten time than 299, and define representation SE of shielding enclosure effectively.

  • PDF

A study on the railway signal system for high density traffic (열차의 고밀도운전을 위한 신호보안 시스템에 관한 연구)

  • 강규현;김희식
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1997.10a
    • /
    • pp.163-166
    • /
    • 1997
  • In order to shorten head-way time on existing railway lines without any change of signal block length between stations, it is a realistic optional way to change the control method of train signal, i.e. to modernize the cab signal using transponder. A new signalling system of operation pattern control technique is suggested as new model to increase the railway traffic efficiency. Through the computer simulation of this model, the train head-way time by the fixed signalling system and the new pattern control system is analyzed.

  • PDF