• Title/Summary/Keyword: Shipbuilding production plan

Search Result 17, Processing Time 0.024 seconds

A Simulation-Based Capacity Analysis of a Block-Assembly Process in Ship Production Planning (시뮬레이션을 이용한 블록조립 공정 능력 분석)

  • Song, Young-Joo;Lee, Dong-Kun;Choe, Sung-Won;Woo, Jong-Hun;Shin, Jong-Gye
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.46 no.1
    • /
    • pp.78-86
    • /
    • 2009
  • A capacity calculation and process analysis is a very important part for the entire ship production planning. Ship's production plan is set up with a concept that the product is produced based on the capacity achievable by the processes while general manufacturing sets up the production plan based on product lead-time. Therefore, in case the calculation of capacity for each process of shipbuilding yard is different from actual conditions, a series of production plan - ship table composition, dual schedule plan and execution schedule plan, etc - may accumulate errors, lose reliability of planning information and cause heavy cost deficit in this course. In particular, in case of new shipbuilding yard, stocks between processes are built up and half blocks are not supplied in timely manner, and that is sometimes due to the clumsiness of the operator but it is more often because of the capacity to execute each process is not logically calculated. Therefore, this paper presents the process to calculate the assembly leadtime and assembly process capacity for shipbuilding yard assembly factory. This paper calculated the block type for calculation of assembly lead time based on block DAP(detailed assembly procedure), and introduced cases that calculate production capacities by assembly surface plate by considering the surface plate occupied area of the blocks that change depending on assembly field area and assembly processes through assembly simulation.

The Designing of Production Planning Module for Advanced Planning System with Respect to Supply Chain of the Shipbuilding Industry (조선산업의 공급망을 고려한 APS 생산계획 모듈 설계)

  • Nam, Seunghoon;Ju, Su Heon;Ryu, Cheolho;Shin, Jong-Gye
    • Korean Journal of Computational Design and Engineering
    • /
    • v.21 no.3
    • /
    • pp.353-362
    • /
    • 2016
  • As ships become larger and construction of offshore plants increases recently, the amount of outsourcing has increased accordingly in the shipyard. Consequently, the system integration in terms of SCM (Supply Chain Management) of information and material flows has become much more important. Especially, since the SCM in the shipbuilding industry is operated in accordance with the production planning in connection with design, purchasing and production process which are the main components of the supply chain, the best production plan has to be established over the whole scheduling activities from the long-term planning to the short-term planning. The paper analyzes the characteristics of the SCM and the production planning system and suggests the need and the direction of APS (Advanced Planning System) development specialized in the supply chain management only for shipbuilding industry. Furthermore, propose a new SCP-Matrix (Supply Chain Planning Matrix), which is the basis of the APS development, appropriate for the shipbuilding industry and draw the core function of the APS module for the practical production plan.

Design and Development of Scenario-Based Simulation System to Improve Shipbuilding Execution Scheduling Assessment -A Case Study on Panel Line- (시나리오 기반 조선 실행계획 평가 향상을 위한 시뮬레이션 시스템 개발 -패널라인 개발 사례를 중심으로-)

  • Back, Myunggi;Kim, Youngmin;Hwang, Inhyuck;Lee, Kwang-Kook;Ryu, Cheolho;Shin, Jong Gye
    • Korean Journal of Computational Design and Engineering
    • /
    • v.18 no.3
    • /
    • pp.211-223
    • /
    • 2013
  • Today's ever-increasingly competitive shipbuilding market makes it essential for a shipbuilding company to have more efficient production processes and higher productivity as well as better design ability to obtain its competitiveness. A well-established production execution schedule plays an indispensable role to achieve this goal. Most shipbuilding companies carry out an evaluation on their mid-term plan once it is established. However, no evaluation activity exists for a production execution schedule, because practically all the companies depend on the field workers for the production execution scheduling. In this study, a prototype of a ship production execution schedule evaluation system is developed based on the component based design (CBD) methodology. This system enables one to make a production execution schedule that reflects up-to-date shipyard situation and to validate whether the schedule is feasible or not by running a production simulation according to the schedule. Users can also make use of the system as a decision supporting tool that compares several different execution schedules and evaluates which one is the best execution schedule.

A Shipyard Layout Design System by Simulation (시뮬레이션 기반 조선소 레이아웃 설계 시스템 개발)

  • Song, Young-Joo;Lee, Dong-Kun;Woo, Jong-Hun;Shin, Jong-Gye
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.45 no.4
    • /
    • pp.441-454
    • /
    • 2008
  • Shipyard design and equipments layout problem, which are directly linked with the productivity of ship production, is an important issue serving as reference data of production plan for later massive production of ships. So far in many cases, design of a shipyard has been relying on the experienced engineers in shipbuilding, resulting in sporadic and poorly organized processes. And thus, economic losses as well as trials and errors in that accord have been pointed out as inevitable problems. This paper extracts a checklist of major elements to fine tune the shipbuilding yard designing process and the input/output data based on the simulation based shipbuilding yard layout designing framework and methodology proposed in existing researches, and executed initial architecture to develop software that integrates all the relevant processes and designing tools. In this course, both user request and design data by the steps are arranged and organized in the proposed layout design template form. In addition, simulation is done based on the parent shipbuilding process planning and scheduling data of the ship product, shipbuilding process and work stage facilities that constitute shipbuilding yard, and design items are verified and optimized with the layout and equipment list showing optimal process planning and scheduling effects. All the contents of this paper are based on simulation based shipbuilding yard layout designing methodology, and initial architecture processes are based on object oriented development methodology and system engineering methods.

Development of Shipbuilding Execution Scheduling Support System using Mobile Device : A Case Study for a Panel Block Assembly Shop (모바일 기기를 활용한 조선 생산 실행계획 지원 시스템 개발 : 판넬라인 개발 사례를 중심으로)

  • Hwang, Inhyuck;Song, Jungkyu;Back, Myunggi;Ryu, Cheolho;Lee, Kwangkook;Shin, Jong Gye
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.50 no.4
    • /
    • pp.262-271
    • /
    • 2013
  • Owing to the development of mobile communication technology during the last a few years, the number of users of mobile devices such as the smartphone and the tablet PC has increased rapidly. As a result, the range of applications of the mobile devices has also been greatly expanded from an application for the convenience of daily life to an application for assisting the operations of industrial fields. Especially, portability of mobile devices can provide great help in collecting and using information on the production site. In shipbuilding production processes, it is difficult to collect changes of circumstance in the field and reflect the changes to schedule due to the low production automation rate and frequent changes in schedule. In this study, we propose a system to solve the problems of shipbuilding production processes such as the ones described above by using mobile devices. First of all, we organize the production information and production processes of the panel line through the analysis of shipyard panel line operations. Next, we have developed a system that can support the production execution plan of the panel line and monitor the production processes in the field. The system was developed utilizing application virtualization to allow access to the system from various platforms of mobile devices and PC's. The system was implemented using ooCBD methodology considering the future expansion of the system and ease of maintenance.

Discrete Event Simulation for the Initial Capacity Estimation of Shipyard Based on the Master Production Schedule (대일정 생산 계획에 따른 조선소 생산 용량의 초기 평가를 위한 이산사건 시뮬레이션)

  • Kim, Kwang-Sik;Hwang, Ho-Jin;Lee, Jang-Hyun
    • Korean Journal of Computational Design and Engineering
    • /
    • v.17 no.2
    • /
    • pp.111-122
    • /
    • 2012
  • Capacity planning plays an important role not only for master production plan but also for facility or layout design in shipbuilding. Product work breakdown structure, attributes of production resources, and production method or process data are associated in order to make the discrete event simulation model of shipyard layout plan. The production amount of each process and the process time is assumed to be stochastic. Based on the stochastic discrete event simulation model, the production capacity of each facility in shipyard is estimated. The stochastic model of product arrival time, process time and transferring time is introduced for each process. Also, the production capacity is estimated for the assumed master production schedule.

Implementation of Shipbuilding components and materials management system (선박부품 자재관리시스템 구축 방안)

  • Park, Doo-jin
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2012.10a
    • /
    • pp.909-910
    • /
    • 2012
  • Shipbuilding is an order made assembly production basically. To build a single vessel, it costs hundreds of thousands small and big parts and million tons of structural steel. From contract to delivery, It takes 2 years of time in general. Shipbuilding parts are supplied order made based in and out of the country. For the cost and efficiency issue, on-time supply of ship parts is critical. Thus, this study suggests the optimum material management system plan of ship components for the best result.

  • PDF

SCP-Matrix based shipyard APS design: Application to long-term production plan

  • Nam, SeungHoon;Shen, HuiQiang;Ryu, Cheolho;Shin, Jong Gye
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.10 no.6
    • /
    • pp.741-761
    • /
    • 2018
  • A shipyard is an Engineer To Order (ETO) company that designs and manufactures new products when orders are placed. Various tasks are concurrently performed, thereby making process management considerably important. It is particularly important to plan and control production activities because production constitutes the largest part of the overall process. Therefore, this study focuses on the development of a production planning system based on an Advanced Planning System (APS). An APS is an integrated planning system that targets supply chain processes in accordance with the principles of hierarchical planning. In this study, a Supply Chain Planning Matrix (SCP-Matrix), which is used as a guideline for APS development, is designed through analysis of shipyard cases. Then, we define the process in detail, starting from long-term production plan as the initial application, and design and implement a long-term production planning system using a component-based development.

An Automatic Block Allocation Methodology at Shipbuilding Midterm Scheduling (조선 중일정 블록 배량 계획 자동화 연구)

  • Hwang, InHyuck;Nam, SeungHoon;Shin, JongGye
    • Korean Journal of Computational Design and Engineering
    • /
    • v.17 no.6
    • /
    • pp.409-416
    • /
    • 2012
  • Most of the shipbuilding scheduling researches so far have been conducted with stress on the dock plan. That is due to the fact that the dock is the least extendable resource in shipyards and its overloading is difficult to resolve. However, once the dock scheduling is completed, it is also important to make a plan that make the best use of the rest of the resources in the shipyard, so that any additional cost is minimized. This study automates block allocation process by analyzing the existing manual process that designates production bays for the blocks during the midterm planning. Also, a planning scenario validation method is suggested, where block allocation scenarios based on diagrams are edited and simulated.

Design of Integrated Process-Based Model for Large Assembly Blocks Considering Resource Constraints in Shipbuilding (자원제약을 고려한 조선 대조립 공정의 통합 프로세스 기반 모델 설계)

  • Jeong, Eunsun;Jeong, Dongsu;Seo, Yoonho
    • Journal of the Korea Society for Simulation
    • /
    • v.28 no.2
    • /
    • pp.107-117
    • /
    • 2019
  • Because shipbuilding is single-product production with limited resources, production management technology is essential to manage the resources effectively and maximize the productivity of ship-process. Therefore, many shipbuilding companies are conducting research on ship production plan and process considering various constraints in the field by applying modeling and simulation. However, it is difficult to provide accurate production plan on sudden schedule and process changes, and to understand the interconnectivity between the processes that produce blocks in existing research. In addition, there are many differences between the production planning and field planning because detailed processes and quantity of blocks can not be considered. In this research, we propose the integrated process-based modeling method considering process-operation sequences, BOM(Bill of materials) and resource constraints of all the scheduled blocks in the indoor system. Through the integrated process-based model, it is easy for the user to grasp the assembly relationship, workspace and preliminary relationship of assembly process between the blocks in indoor system. Also, it is possible to obtain the overall production plan that maximizes resource efficiency without the separate simulation and resource modeling procedures because resource balancing that considers the amount of resource quantity shared in the indoor system is carried out.