• Title/Summary/Keyword: Shield tunnelling

Search Result 173, Processing Time 0.027 seconds

A study of tunnelling equipment development in a model test (터널굴착 시뮬레이션을 위한 터널굴착장비의 개발에 대한 연구)

  • Kim, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.5 no.2
    • /
    • pp.199-207
    • /
    • 2003
  • Tunnel modelling in the field of geotechnical engineering essentially requires models of tunnelling machines and the simulation of tunnelling processes to clarify the detailed behaviour of tunnel construction. Modern advanced mechatronics, including construction processes, machinining and control technologies, are making it possible to fabricate such models. These technologies, however, are essentially developed in a gravity field condition and are needed to examine in a 1g or cenrifuge field condition. This paper presents the simulation method for tunnelling processes and the design method for tunnelling machines with special reference to the problem of earth pressure acting on the lining of a shield tunnel. The paper then introduces and verifies the design method for tunnelling machines in the 1g field by means of checking the reproduceability of experiment data and their comparison with data in the field.

  • PDF

Risk management applicable to shield TBM tunnel: I. Risk factor analysis (쉴드 TBM 터널에 적용 가능한 리스크 관리: I. 리스크 요인 분석)

  • Hyun, Ki-Chang;Min, Sang-Yoon;Moon, Joon-Bai;Jeong, Gyeong-Hwan;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.14 no.6
    • /
    • pp.667-681
    • /
    • 2012
  • In general, risk management consists of a series of processes or steps including risk identification, risk analysis, risk evaluation, risk mitigation measures, and risk re-evaluation. In this paper, potential risk factors that occur in shield TBM tunnels were investigated based on many previous case studies and questionaries to tunnel experts. The risk factors were classified as geological, design or construction management features. Fault Tree was set up by dividing all feasible risks into four groups that associated with: cutter; machine confinement; mucking (driving) and segments. From the Fault Tree Analysis (FTA), 12 risk items were identified and the probability of failure of each chosen risk item was obtained.

Characterization of face stability of shield tunnel excavated in sand-clay mixed ground through transparent soil models

  • YuanHai Li;XiaoJie Tang;Shuo Yang;YanFeng Ding
    • Geomechanics and Engineering
    • /
    • v.33 no.5
    • /
    • pp.439-451
    • /
    • 2023
  • The construction of shield tunnelling in urban sites is facing serious risks from complex and changeable underground conditions. Construction problems in the sand-clay mixed ground have been more reported in recent decades for its poor control of soil loss in tunnel face, ground settlement and supporting pressure. Since the limitations of observation methods, the conventional physical modelling experiments normally simplify the tunnelling to a plane strain situation whose results are not reliable in mixed ground cases which exhibit more complicated responses. We propose a new method for the study of the mixed ground tunnel through which mixed lays are simulated with transparent soil surrogates exhibiting different mechanical properties. An experimental framework for the transparent soil modelling of the mixed ground tunnel was established incorporated with the self-developed digital image correlation system (PhotoInfor). To understand better the response of face stability, ground deformation, settlement and supporting phenomenon to tunnelling excavation in the sand-clay mixed ground, a series of case studies were carried out comparing the results from cases subjected to different buried depths and mixed phenomenon. The results indicate that the deformation mode, settlement and supporting phenomenon vary with the mixed phenomenon and buried depth. Moreover, a stratigraphic effect exists that the ground movement around mixed face reveals a notable difference.

Effects of structural characteristics of screw conveyor on spewing during EPB shield tunnelling

  • Xiaochun Zhong;Siyuan Huang;Rongguo Huai;Yikang Hu;Xuquan Chen
    • Geomechanics and Engineering
    • /
    • v.35 no.6
    • /
    • pp.571-580
    • /
    • 2023
  • During EPB shield tunnelling, construction speed and safety are severely affected by spewing. In this study, a theoretical seepage model is established to capture of the effects of screw conveyor geometry and turbulent flow on spewing. Experimental test results are used to verify the proposed theoretical seepage model. It is found that the seepage is greatly affected by the length of screw conveyor and soil permeability. The proposed model can increase the screw conveyor length and reduce soil discharge sections simultaneously, the permeability of treated muck thus decreases by one order of magnitude. By using the proposed theoretical seepage model, the criterion of critical soil permeability used to identify spewing is proposed. When the water head applied at tunnel face reaches 40 m and 50 m, the critical permeability coefficients of treated muck should be less than 10-5 m/s and 10-6 m/s to avoid spewing. For a given permeability coefficient of soil, the water flow rate is overestimated if structural characteristics of screw conveyor is not considered. Consequently, the occurrence of spewing is greatly overestimated, which increases construction cost substantially.

Effect of Segment thickness during Shield TBM tunnelling in case study (쉴드TBM 추진시 세그먼트 두께영향에 대한 현장사례연구)

  • Kim, Sang-Hwan;Kim, Won-Kyung;Lee, Hye-Yoon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.3
    • /
    • pp.311-320
    • /
    • 2013
  • This paper presents the effect of Segment thickness during Shield TBM tunnelling in case study. In order to perform this study, the ground condition developed in the investigation site are reviewed and analysed. It is also carried out the construction problems occurred in the site during Shield TBM tunnelling. Several Segments were broken partially during advance tunnel by jacking pressure. The data surveyed from site are analysed in order to investigate the cause of Segment break. The numerical and analytical evaluations are carried out to examine the effect of Segment behaviour. From the results, it is found that the main causes of Segment break may be the jacking system and Segment thickness. In addition, new jacking technique is suggested to install safely the Segment during advance tunnel by jacking.

A Study on Backfill Injection of Shield Tunnelling (쉴드터널에서의 뒷채움주입에 관한 연구)

  • 민덕기;백진욱
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1995.10a
    • /
    • pp.201-210
    • /
    • 1995
  • In Resent years, urban tunnels have been more deeply constructed due to the congestion of buried steuctures. In such conditions, the shield method has become one of the popular urban tunnelling method by reason of several characteristics ; safety of construction, mimium environmental damage, and workbility. In tunnelling, the space which is tail-void are created between the ground and the other face of the primary lining. in other to reduce the ground seformation, it is important backfilling in tail-void. In this paper, the result of an experimental investigation undertaken to evaluate the physical and mechanical propeties of grouts composed of various mixtures of backfill materials. And the backfill injection model test was carried out considering the effects of tail-void.

  • PDF

A study on the behaviour of single piles to adjacent Shield TBM tunnelling by considering face pressures (막장압의 크기를 고려한 Shield TBM 터널 근접시공이 단독말뚝의 거동에 미치는 영향에 대한 연구)

  • Jeon, Young-Jin;Kim, Jeong-Sub;Jeon, Seung-Chan;Jeon, Sang-Joon;Park, Byung-Soo;Lee, Cheol-Ju
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.6
    • /
    • pp.1003-1022
    • /
    • 2018
  • In the current work, a series of three-dimensional finite element analyses were carried out to understand the behaviour of a pre-existing single pile to the changes of the tunnel face pressures when a shield TBM tunnel passes underneath the pile. The numerical modelling analysed the results by considering various face pressures (25~100% of the in-situ horizontal stress prior to tunnelling at the tunnel springline). In the numerical modelling, several key issues, such as the pile settlements, the axial pile forces, the shear stresses have been thoroughly analysed for different face pressures. The head settlements of the pile with the maximum face pressure decreased by about 44% compared to corresponding settlement with the minimum face pressure. Furthermore, the maximum axial force of the pile developed with the minimum face pressure. The tunnelling-induced axial pile force at the minimum face pressure was found to be about 21% larger than that with the maximum face pressure. It has been found that the ground settlements and the pile settlements are heavily affected by the face pressures. In addition, the influence of the piles and the ground was analysed by considering characteristics of the soil deformations. Also, the apparent safety factor of the piles are substantially reduced for all the analyses conducted in the current simulation, resulting in severe effects on the adjacent piles. Therefore, the behaviour of the piles, according to change the face pressures, has been extensively examined and analysed by considering the key features in great details.