• 제목/요약/키워드: Sequence Control Relay Circuit

검색결과 11건 처리시간 0.022초

간이용 엘리베이터 장치 개선에 관한 연구 (A Study on the Improvement of Easy Elevator Equipment)

  • 위성동;구활본
    • 한국전기전자재료학회:학술대회논문집
    • /
    • 한국전기전자재료학회 2001년도 기술교육위원회 창립총회 및 학술대회 의료기기전시회
    • /
    • pp.82-88
    • /
    • 2001
  • Manufactured easy elevator can drives from the first floor to fifth floor as sequence control circuit in cause opening than existing equipment of experiment and practice, the structure of in the first implementation process are hand-worked control component with push-button, L/S and relay, it is structured a lamp to express that the door open and moving of cage by mechanical action of For/Rev motor-braker of which load. The second structure of implement process to control from the first floor to the fifth floor with the PLC elevator program can control by the sensor of hand-operated function of L/Sl~L/S5 in time that the S/Wl~S/W5 of PLC control panel operates to the For/Rev. The function of two kind process that an elevator is driven by PLC program and the sequence control relay circuit is a mechanical relay sequence control field and it is equipment apparatus of it to get appropriately the technology of For/Rev in that mechanical operating cause of a load using the PLC program. Also the wring circuit using a plug, dissembly. the circuit and the principle of component, and PLC program with the function test can be used the implementation field to the total technology theory about FA.

  • PDF

간이 승강기 수·자동 배선제어방식에 관한 연구 (A Study on the Wiring Control Method of Hand & Auto Operation of an Easy Elevator)

  • 위성동;구할본
    • 한국전기전자재료학회논문지
    • /
    • 제16권4호
    • /
    • pp.351-357
    • /
    • 2003
  • An easy learning elevator originated is opened to compare the existed teaming equipment, and it had a high studied efficiency that the sequence control circuit can open and close with the wire. The structure of equipment to be controlled from the first floor to the fifth floors is demostrated by the constructive apparatus with the lamps to express the function of the open-close of the door according to the cage moving with a mechanical actuation of the forward reverse breaker and the motor of load, and the mechanical actuation of hand-operation control components of push-button S/W and L/S and relay etc. These components let connect each other in order to control of the elevator function with the auto program and the designed sequence control circuit. Consequently the cage could go and come till 1∼5 steps with an auto program of the elevator and the sequence control circuit. The sequence control circuit is controlled by the step of forward and reverse to follow as that the sensor function of L/S1 ∼ L/S5 let posit with the control switchs of S/W1 ∼ S/W5 of PLC testing panel and switchs of S/W1 ∼ S/W5 installed on the transparent acryl plate of the frame. In here, improved apparatus is the hand-auto operation combined learning equipment to study the principle and technique of the originate sequence control circuit and the auto program of PLC.

간이 엘리베이터 수.자동 개폐배선 제어방식에 관한연구 (A Study on the Control Method of Hand & Automatic Operation of On-Off Wiring of an Easy Elevator)

  • 위성동;구할본;김태성
    • 한국전기전자재료학회:학술대회논문집
    • /
    • 한국전기전자재료학회 2002년도 하계학술대회 논문집 Vol.3 No.2
    • /
    • pp.1107-1112
    • /
    • 2002
  • An easy elevator originated is an opened system to compare an existing equipment, and learning efficient is high as a wiring that the sequence control circuit is on and off. The structure of an equipment to be controled from the first floor to the fifth floor is constructed by a lamp to express the function of the open-close of the door according to the cage moving, to express the mechanical actuation of the forward-reverse break and motor of load and of hand-worked control component of Push-Button S/W, L/S and Relay. In order to act of the elevator function that these components connected, designed the auto program and the sequence control circuit. Consequently the process that these(1~5steps) operated the cage with an auto program of the elevator and the sequence control circuit is controled by the step of forward and reverse that the L/S1~L/S5 of sensor adjust function let posit, by the adjustable S/W1~S/W5 of PLC testing panel and the S/W1~S/W5 which installed on the transparent acryl plate of a frame. In here, improved apparatus is the learning equipment of combined use to study the principle and the technique of the originated sequence control circuit and the auto program of PLC.

  • PDF

중용량 전동기보호를 위한 전류형 디지털 보호계전기 개발 (Development of Current-based Compact Digital Protective Relay for Induction Motor Protection)

  • 정종진;김중표;신종한;박장수
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.140-142
    • /
    • 2005
  • This paper describes the current- based compact digital motor protective relay for low and high voltage induction motors, which are widely used in industrial and commercial power systems. The existing protective relays for motor protection had only overload, short circuit, reverse phase, open circuit and grounding protective elements, and measurement, start/stop control function. But in present day, for automation system, various functions are required, especially motor management and sequence control function and more. To meet these requirements, we developed an economic current-based compact digital motor protective relay which had various function to control, manage and monitor the induction motor.

  • PDF

간이 승강기 수.자동 배선제어방식에 관한 연구 (A Study on the wiring Control Method of Hand & Auto Operation of an easy Elevator)

  • 위성동;구할본
    • 한국전기전자재료학회:학술대회논문집
    • /
    • 한국전기전자재료학회 2002년도 추계학술대회 논문집 Vol.15
    • /
    • pp.596-602
    • /
    • 2002
  • An easy elevator for learning originated is opened to compare the existed learning equipment, and it had a high studying efficient that the sequence control circuit can opens and closes with the wire. The structure of equipment to be controlled from the first floor to the fifth floors is demonstrated a constructive apparatus by a lamp atc to express the function of the open-close of the door according to the cage moving with a mechanical actuation of the forward-reverse breaker and the motor of load and a mechanical actuation of hand-operation control components of push-button S/W and L/S and relay etc. These components let connects each other in order to control of the elevator function with the auto program and the designed sequence control circuit. Consequent1y the process of these functions of 1~5steps could operates the cage with an auto program of the elevator and the sequence control circuit. The sequence control circuit is controlled by the step of forward and reverse to follow as that the sensor function of the L/S1~L/S5 let posit with the control switchs of S/W1~S/W5 of PLC testing panel and switchs of S/W1~S/W5 installed on the transparent acryl plate of the frame. In here, improved apparatus is a hand-auto operation combined learning equipment to study the principle and a technique of the originated sequence control circuit and the auto program of PLC.

  • PDF

PLC를 사용한 지능형 교통 신호 제어 설비 구현 (The Implementation on the Traffic Signal Control Equipment of Intelligence Type Using the PLC)

  • 김태성;위성동
    • 한국전기전자재료학회논문지
    • /
    • 제11권1호
    • /
    • pp.74-81
    • /
    • 1998
  • It is not good joint that today's traffic control system that the course of traffic volume increase tendency is followed, in the traffic volume is approched into the time of my car. Accordingly when we analyzed the existing traffic signal control system, the traffic signal system is developed from the machine type that the motor was centered, to get up to date, to the intelligence electron signal control system. But yet, when we have a test and a A/S on the control circuit, the circuit that is designed to the center IC and ROM are complicated. Also, the time of pass lamp that the car line stream is going, can not extended automatically a time till the traffic volume is decreased to the same direction. This theme must be a real time intelligence control system that the time of pass lamp can extend aumatically. The circuit of sequence ladder diagram on the traffic signal control of a crossroads that is desinged, can be satisfied the complicated vehicle order. Therefore when the circuit is changed, the new developed system is economical with that dosen't needs any of components to require the circuit equipment, and the time is saved with needlessness of the circuit wiring again, and have a much trustworthy. The control method of pass signal lamp in the car line stream connecting among PLC and Relay and Temp Sensor, can be changed to hand operation and to semi-automation and to all-automation. New intelligence traffic signal system is composed with all-together system of T Sensor + Video Camera + IBM PC that is able to guiding the establishment of traffic order.

  • PDF

스마트 최대 전력 관리 시스템 알고리듬 연구 (A Study on Smart Peak Power Control System)

  • 이우철
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2013년도 추계학술대회 논문집
    • /
    • pp.227-228
    • /
    • 2013
  • The paper is related to smart maximum power system based on program logic. Especially, this system compares the total demand power with the target power by using the signal from the digital kilo watt meter. Based on the power information by the maximum power control equipment the consumed future power is anticipated. In addition, through consumed future power the controllable target power is set, and it applies on the maximum power control equipment. User or manager would control the load efficiently through the simple programming which could control load based on the control sequence and relay. So this system could control load more efficient and stable. Also the conventional load control circuit is not needed. Therefore, it is possible to improve the simple system configuration, which is resulted in cost effective and time saving. So this system is anticipated on time and coast.

  • PDF

민감한 전기전자기기의 전압외란에 대한 영향 최소화 연구 (A Research to Minimizing the Effect of Voltage Disturbances on Sensitive Electrical and Electronic Equipment)

  • 윤갑구
    • 기술사
    • /
    • 제19권2호
    • /
    • pp.10-20
    • /
    • 1986
  • 전압외란(voltage disturbances)에 대하여 민감함 전기전자기기가 받는 영향을 최소화하기 위한 방안으로 전력공급자측에서의 대책과 수용가기기에서의 대응책에 대하여 조사연구하였다. 전력공급자에서의 대책으로는 전압강하 시간의 단축에 대하여 검토하였는데, 효과와 경제성으로 보아 실현가능성이 적었다. 수용가기기에서의 대응책으로는 컴퓨터제어(computer control)와 자동화시스템(automated systems) 등에는 무정전 전원장치 또는 노이즈 서프레서(noise suppressor)나 파워콘디쇼너(power conditioners)를 설치하고, 전자개폐기는 지연석방형 전자개폐기를 채용하며, 가변속제어전동기에는 순간전압부하에 대한 대책이 고려된 제어회로를 채용하고, 고압방전등에는 순간재점등장치가 붙은 등기구를 채용하며, 부족전압계전기는 계전기의 정전시감을 연장하는 방안과 순간정전시에는 자동으로 재투입하는 sequence를 구성하는 방법등이 효과적인 대책으로 검토되었다.

  • PDF

디지털 타이머를 이용한 인터넷 기반의 원격제어 및 모니터링 (Internet Based Remote Control and Monitoring System using Digital Timer)

  • 김은주;강신영;박철수;임영철;김광헌
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 추계학술대회 논문집 전기기기 및 에너지변환시스템부문
    • /
    • pp.245-248
    • /
    • 2001
  • Recently, with the advancement of internet network the system has been needed to be controllable and observable through internet at industrial workplace. In this study, we developed the digital timer which has a communication function to control and observe many kinds of devices by combining relay and timer used for each type of control panel to realize control solution based on internet to be easily applicable at workplace with low cost and adding 485 serial communication module to have parallel expansibility and safety. And, this system was experimented and designed for easy system management and status check from remote station through internet. appling the developed digital timer to parallel sequence control of motor. As the result of experiment, the circuit configuration would be more simplified than the existing, and it is expected that multi-connection control and monitoring can be simply implemented with low cost equipment at industrial workplace.

  • PDF

디지털 타이머를 이용한 인터넷 기반의 원격제어 및 모니터링 (Internet Based Remote Control and Monitoring System using Digital Timer)

  • 김은주;강신영;박철수;임영철;김광헌
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 추계학술대회 논문집 전기기기 및 에너지변환시스템부문
    • /
    • pp.157-160
    • /
    • 2001
  • Recently, with the advancement of internet network the system has been needed to be controllable and observable through internet at industrial workplace. In this study, we developed the digital timer which has a communication function to control and observe many kinds of devices by combining relay and timer used for each type of control panel to realize control solution based on internet to be easily applicable at workplace with low cost and adding 485 serial communication module to have parallel expansibility and safety. And, this system was experimented and designed for easy system management and status check from remote station through internet, appling the developed digital timer to parallel sequence control of motor. As the result of experiment, the circuit configuration would be more simplified than the existing, and it is expected that multi-connection control and monitoring can be simply implemented with low cost equipment at industrial workplace.

  • PDF