Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
/
2001.09a
/
pp.82-88
/
2001
Manufactured easy elevator can drives from the first floor to fifth floor as sequence control circuit in cause opening than existing equipment of experiment and practice, the structure of in the first implementation process are hand-worked control component with push-button, L/S and relay, it is structured a lamp to express that the door open and moving of cage by mechanical action of For/Rev motor-braker of which load. The second structure of implement process to control from the first floor to the fifth floor with the PLC elevator program can control by the sensor of hand-operated function of L/Sl~L/S5 in time that the S/Wl~S/W5 of PLC control panel operates to the For/Rev. The function of two kind process that an elevator is driven by PLC program and the sequence control relay circuit is a mechanical relay sequence control field and it is equipment apparatus of it to get appropriately the technology of For/Rev in that mechanical operating cause of a load using the PLC program. Also the wring circuit using a plug, dissembly. the circuit and the principle of component, and PLC program with the function test can be used the implementation field to the total technology theory about FA.
Journal of the Korean Institute of Electrical and Electronic Material Engineers
/
v.16
no.4
/
pp.351-357
/
2003
An easy learning elevator originated is opened to compare the existed teaming equipment, and it had a high studied efficiency that the sequence control circuit can open and close with the wire. The structure of equipment to be controlled from the first floor to the fifth floors is demostrated by the constructive apparatus with the lamps to express the function of the open-close of the door according to the cage moving with a mechanical actuation of the forward reverse breaker and the motor of load, and the mechanical actuation of hand-operation control components of push-button S/W and L/S and relay etc. These components let connect each other in order to control of the elevator function with the auto program and the designed sequence control circuit. Consequently the cage could go and come till 1∼5 steps with an auto program of the elevator and the sequence control circuit. The sequence control circuit is controlled by the step of forward and reverse to follow as that the sensor function of L/S1 ∼ L/S5 let posit with the control switchs of S/W1 ∼ S/W5 of PLC testing panel and switchs of S/W1 ∼ S/W5 installed on the transparent acryl plate of the frame. In here, improved apparatus is the hand-auto operation combined learning equipment to study the principle and technique of the originate sequence control circuit and the auto program of PLC.
Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
/
2002.07b
/
pp.1107-1112
/
2002
An easy elevator originated is an opened system to compare an existing equipment, and learning efficient is high as a wiring that the sequence control circuit is on and off. The structure of an equipment to be controled from the first floor to the fifth floor is constructed by a lamp to express the function of the open-close of the door according to the cage moving, to express the mechanical actuation of the forward-reverse break and motor of load and of hand-worked control component of Push-Button S/W, L/S and Relay. In order to act of the elevator function that these components connected, designed the auto program and the sequence control circuit. Consequently the process that these(1~5steps) operated the cage with an auto program of the elevator and the sequence control circuit is controled by the step of forward and reverse that the L/S1~L/S5 of sensor adjust function let posit, by the adjustable S/W1~S/W5 of PLC testing panel and the S/W1~S/W5 which installed on the transparent acryl plate of a frame. In here, improved apparatus is the learning equipment of combined use to study the principle and the technique of the originated sequence control circuit and the auto program of PLC.
This paper describes the current- based compact digital motor protective relay for low and high voltage induction motors, which are widely used in industrial and commercial power systems. The existing protective relays for motor protection had only overload, short circuit, reverse phase, open circuit and grounding protective elements, and measurement, start/stop control function. But in present day, for automation system, various functions are required, especially motor management and sequence control function and more. To meet these requirements, we developed an economic current-based compact digital motor protective relay which had various function to control, manage and monitor the induction motor.
Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
/
2002.11a
/
pp.596-602
/
2002
An easy elevator for learning originated is opened to compare the existed learning equipment, and it had a high studying efficient that the sequence control circuit can opens and closes with the wire. The structure of equipment to be controlled from the first floor to the fifth floors is demonstrated a constructive apparatus by a lamp atc to express the function of the open-close of the door according to the cage moving with a mechanical actuation of the forward-reverse breaker and the motor of load and a mechanical actuation of hand-operation control components of push-button S/W and L/S and relay etc. These components let connects each other in order to control of the elevator function with the auto program and the designed sequence control circuit. Consequent1y the process of these functions of 1~5steps could operates the cage with an auto program of the elevator and the sequence control circuit. The sequence control circuit is controlled by the step of forward and reverse to follow as that the sensor function of the L/S1~L/S5 let posit with the control switchs of S/W1~S/W5 of PLC testing panel and switchs of S/W1~S/W5 installed on the transparent acryl plate of the frame. In here, improved apparatus is a hand-auto operation combined learning equipment to study the principle and a technique of the originated sequence control circuit and the auto program of PLC.
Journal of the Korean Institute of Electrical and Electronic Material Engineers
/
v.11
no.1
/
pp.74-81
/
1998
It is not good joint that today's traffic control system that the course of traffic volume increase tendency is followed, in the traffic volume is approched into the time of my car. Accordingly when we analyzed the existing traffic signal control system, the traffic signal system is developed from the machine type that the motor was centered, to get up to date, to the intelligence electron signal control system. But yet, when we have a test and a A/S on the control circuit, the circuit that is designed to the center IC and ROM are complicated. Also, the time of pass lamp that the car line stream is going, can not extended automatically a time till the traffic volume is decreased to the same direction. This theme must be a real time intelligence control system that the time of pass lamp can extend aumatically. The circuit of sequence ladder diagram on the traffic signal control of a crossroads that is desinged, can be satisfied the complicated vehicle order. Therefore when the circuit is changed, the new developed system is economical with that dosen't needs any of components to require the circuit equipment, and the time is saved with needlessness of the circuit wiring again, and have a much trustworthy. The control method of pass signal lamp in the car line stream connecting among PLC and Relay and Temp Sensor, can be changed to hand operation and to semi-automation and to all-automation. New intelligence traffic signal system is composed with all-together system of T Sensor + Video Camera + IBM PC that is able to guiding the establishment of traffic order.
The paper is related to smart maximum power system based on program logic. Especially, this system compares the total demand power with the target power by using the signal from the digital kilo watt meter. Based on the power information by the maximum power control equipment the consumed future power is anticipated. In addition, through consumed future power the controllable target power is set, and it applies on the maximum power control equipment. User or manager would control the load efficiently through the simple programming which could control load based on the control sequence and relay. So this system could control load more efficient and stable. Also the conventional load control circuit is not needed. Therefore, it is possible to improve the simple system configuration, which is resulted in cost effective and time saving. So this system is anticipated on time and coast.
Journal of the Korean Professional Engineers Association
/
v.19
no.2
/
pp.10-20
/
1986
This paper describes a countermeasure of electric utilities and customer equipment in order to minimize an effect of sensitive electrical and electronic equipment on the voltage disturbances. After being studied, some schemes to solve were discovered. Firstly, in the electric utilities, the reduction of frequency and influence of voltage drop's time are not easy to realize because of the standpoint of effect and economy. Secondly, in the customer equipment, there are some equipment to minimize the voltage disturbances, Such as an UPSs, a noise suppressors and a power conditioners. One of them should be established on the computer control and automated systems, the electromagnetic switch of delay-release type should be adopted on the electromagnetic switch, the controlling circuit should be adopted on the variable speed motors which is being considered a countermeasure for a momentary under-voltage drops, the luminaire adhering a instantaneous restrike device should be adopted on the HID lamp. And also, the scheme of extending a setting time of relay on the undervoltage relay and the forming method of sequence which is automatic reclosing at this time of instantaneous suspension of an electric supply have been studied.
Kim, E.J.;Kang, S.Y.;Bark, C.S.;Lim, Y.C.;Kim, G.W.
Proceedings of the KIEE Conference
/
2001.10a
/
pp.245-248
/
2001
Recently, with the advancement of internet network the system has been needed to be controllable and observable through internet at industrial workplace. In this study, we developed the digital timer which has a communication function to control and observe many kinds of devices by combining relay and timer used for each type of control panel to realize control solution based on internet to be easily applicable at workplace with low cost and adding 485 serial communication module to have parallel expansibility and safety. And, this system was experimented and designed for easy system management and status check from remote station through internet. appling the developed digital timer to parallel sequence control of motor. As the result of experiment, the circuit configuration would be more simplified than the existing, and it is expected that multi-connection control and monitoring can be simply implemented with low cost equipment at industrial workplace.
Kim, E.J.;Kang, S.Y.;Bark, C.S.;Lim, Y.C.;Kim, G.W.
Proceedings of the KIEE Conference
/
2001.10a
/
pp.157-160
/
2001
Recently, with the advancement of internet network the system has been needed to be controllable and observable through internet at industrial workplace. In this study, we developed the digital timer which has a communication function to control and observe many kinds of devices by combining relay and timer used for each type of control panel to realize control solution based on internet to be easily applicable at workplace with low cost and adding 485 serial communication module to have parallel expansibility and safety. And, this system was experimented and designed for easy system management and status check from remote station through internet, appling the developed digital timer to parallel sequence control of motor. As the result of experiment, the circuit configuration would be more simplified than the existing, and it is expected that multi-connection control and monitoring can be simply implemented with low cost equipment at industrial workplace.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.