• Title/Summary/Keyword: Separated construction

Search Result 246, Processing Time 0.023 seconds

A Study on the Application of the Two Step Supply System of Public Rental Housing - Focused on the cases of SI housing with skeleton rental in Japan - (공공임대주택의 2단계 공급방식 적용 방안에 관한 연구 - 일본 스켈레톤 임대형 SI주택 사례를 중심으로 -)

  • Yi, Yong-Kyu;Park, Ji-Young
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.35 no.7
    • /
    • pp.45-52
    • /
    • 2019
  • In recent years, there has been a demand for a residential supply model that can actively and flexibly cope with various housing demands in the changing paradigm of public rental housing. This study focuses on the two-step supply system that has been studied in Japan. It was used to examine and analyze cases to recommend a supply plan that can be used for domestic public rental housing. In more detail, the literature review of the two-step supply system discloses that four types by supply methods (A-1, A-2, B-2, and C-2) and four types of relationship (construction and management combine entities type, management entity type, construction entity type, a separated entity type) can be categorized. In addition, from the actual case study, it revealed that the way of linking and supplying activities among the entity can have a great influence on "ease of supply (supply)", "diversity of housing demand (diversity)," and "quality of construction (construction)". "Ease of supply (supply)" refers to whether the construction entity is separated, and the owner is a manager. "Diversity" refers to whether the management subject is separated, and if the owner is also the constructor or the manager. "Construction" is whether the management entity is connected and managed by the management entity and can be evaluated in "Good", "Middle", and "Bad" level. As a summary, even if the existing public rental housing in Korea can be separated into a skeleton and infill system, the result suggested that it has a limitation on response to residential demand. In addition, the paper was able to propose an improved plan to make the infill as a secondary operator.

A Study on the Characteristics of Construction Work Noise by SDA Method (SDA공법에 의한 건설작업소음의 특성에 대한 연구)

  • Kim Su-Yong;Yang Jae-Hun;Kim Myung-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.203-209
    • /
    • 2004
  • Construction work noise has caused much annoyance for a number of dwellers nearby construction field and has become a very serious issue in our living environment. Therefore, practical solutions for reducing construction work noise are highly required in construction field. Practical solutions for the construction work noise, however, are very difficult because of the poorness of basic data and research. Especially, in order to establish a sound insulation plan about pilings work noise that has highly sound pressure level and impactive, it is necessary to investigate the characteristics of construction noise such as pilings work noise, mechanical operating noise, etc. Accordingly, the aim of this study is to get the basic data about construction noise by SDA(Separated Doughnut Auger) method. And in this study, we attempt to survey the characteristics of attenuation and propagation of construction equipment noise and to estimate the power level in pilings work, using SDA method.

  • PDF

Evaluation of Suitable Application of ultra high-strength Concrete to V.H Separated Placement (VH분리타설 공법의 초고강도 콘크리트 적용성 평가)

  • Kim, Hak-Young;Ki, Jun-Do;Park, Hyun;Lim, Byung Chun;Lee, Young Do;Jung, Sang Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.23-26
    • /
    • 2009
  • Despite vigorous studies on ultra high-strength concrete in Korea, it still faces many challenges in application to on-site construction methods. This study intends to evaluate the applicability of the VH separated-pouring method which is currently used and was designed to pour ultra high-strength concrete with a design strength of 60, 100N/㎟ separately to girder and beam. When it comes to VH separated-pouring, there is a difference in the required design strength between a girder and a beam, which tends to be larger for ultra high-strength concrete. The tensile strength and cold joint at the joint end have not been commonly evaluated and thus the inevitably of its use is dependent on a structural analysis of the structural stress of reinforcement. In the study, potential problems with respect to the building material which might occur during the pouring of ultra high-strength concrete was evaluated and issues on joint surface performance, the hydration energy contained in the members, and the effects of contraction in concrete were considered as the key elements for study.

  • PDF

A Study on the Safety Inspection System Improvement of Agricultural Reservoir Considering Fill-Dam Characteristics (필 댐의 특성을 고려한 농업용 저수지 정밀안전진단체계 개선 연구)

  • Lee, Chang Beom;Jung, Nam Su;Park, Seong Ki;Jeon, Sang Ok
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.58 no.4
    • /
    • pp.1-8
    • /
    • 2016
  • In 2008, 17, 596 dams and reservoirs are scattered across South Korea, and 17, 505 of them (99.5 %) are used for agriculture and 99.3 % are fill dam types. This study aimed to review literature related to the precise safety diagnosis system for agricultural reservoirs established by Korea Rural Community Corporation (KRCC) and analyze problems of its evaluation method. And then, it proposed ways to improve the system including a modified diagnosis system, which was applied to pilot districts in order to verify the utility. For assessment model development of agricultural reservoir, we reviewed status of precision safety inspections systems of agricultural reservoir. There are many problems such as assess agricultural reservoir not by sheet which used in fill dam but by block which used in concrete dam construction and diversion tunnel which main element in reservoir levee is treated as water intake facility. For considering diversion tunnel in reservoir levee, previous precision safety inspection systems which summed in separated phenomenon, separated element, separated site, separated facility was change to new systems which summed in site, phenomenon, element, and facility. Compared results of previous inspection system calculated total assessment index (Ec) with new system calculated total assessment index (Ec) are not show statistical difference.

Anatomical Comparison of North American Eastern, Southern, and Western Redcedar Wood

  • Eom, Young Geun;Kwon, Ohkyung;Hanna, Robert B.;Meyer, Robert W.
    • Journal of the Korean Wood Science and Technology
    • /
    • v.36 no.2
    • /
    • pp.9-20
    • /
    • 2008
  • Anatomical comparison of 3 North American species with commercial name of redcedar was executed to provide taxonomic information for prevention of confusion and establishment of sound business transaction in the wood market. Eastern redcedar (Juniperus virginiana) and southern redcedar (Juniperus silicicola) could not be separated on the basis of microstructure and ultrastructure of wood. Western redcedar (Thuja plicata), however, appeared to be obviously separated from eastern and southern redcedar in a number of microscopic and ultramicroscopic features. Useful features for separating these two groups were intercellular spaces in transverse surface, latewood width, radial intertracheid pitting, warty layer and pits with torus extensions in tracheids, ray composition, nodular end walls in ray parenchyma cells, and cross-field pitting.

A Study on the Satisfaction Degree of Clients on the Supervision in the House Construction Work - Focusing in Taegu, Kyungbuk Province - (주택건설공사 감리의 고객만족도에 관한 연구 -대구·경북지역을 중심으로-)

  • Lee, Ho;Lee, Taick-Oun
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.10 no.4
    • /
    • pp.291-298
    • /
    • 2007
  • In 1994, the house construction work was separated from design part to prevent incomplete work and to improve quality. During that time, the supervision in the house construction work has made a great development in the quantity phase, but there is no study case about the satisfaction degree of clients on the supervision job. This study presents the improvement schemes of the supervision job rationality, the revision of supervision system and supervisor's improved construction management ability. also, This paper aims at advancing our construction field and enhancing competitive power by seeking for solutions to problems and improving current system to a reasonable supervision in the house construction work comparing and analyzing by questionnaire in Taegu, Kyungbuk area. The further study will be needed about the whole Korean construction market.

  • PDF

An Assessment of Bonding Shear Performance of Ultra-high-performance Concrete Regarding Interface Treatment (표면처리방법에 따른 초고성능 콘크리트의 전단부착성능 평가 연구)

  • Jang, Hyun-O;Park, Jin-Ho;Lee, Han-Seung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.10a
    • /
    • pp.81-82
    • /
    • 2016
  • The present study aims to derive optimal interface treatment conditions for emulating a monolithic construction. The joints in this construction are formed through the bonding shear evaluation method during the placement of ultra-high-performance concrete (UHPC) and normal strength concrete (NSC). The evaluation items include push-off tests for homogeneous UHPC + UHPC and heterogeneous NSC + UHPC. The experimental samples comprised a monolithic placement as the baseline, two levels for the separated placement according to the compression strength of concrete, and five levels for the interface treatment. The increase in the number of grooves and their cross-sectional areas only slightly influenced the bonding shear performance. The optimal interface treatment method for the homogeneous UHPC + UHPC construction grooves was at least 30mm. The heterogeneous NSC + UHPC construction should utilize waterjet roughening to expose the aggregate for the increased roughness.

  • PDF

Improved Morphing Visualization Methodology for Effective 4D Expression of Railway Facility (철도시설의 효율적 4D구현을 위한 개선된 Morphing 시각화 방법론 구축)

  • Moon, Hyoun-Seok;Kwon, Jung-Hui;Kim, Chang-Hak;Ji, Sang-Bok;Kang, Leen-Seok
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.350-353
    • /
    • 2006
  • Generally, 4D CAD can be used for visualizing construction schedule information in railway construction project. It is important that 3D CAD object should be represented by real construction situation according to construction site condition. However, it is difficult to visualize real construction situation in 4D CAD viewer because 3D objects should be separated by limited duration of each activity. This study suggests a morphing technology for visualizing 4D object by each activity schedule according to real construction progress.

  • PDF