• Title/Summary/Keyword: Seoul-Pusan High Speed Train

Search Result 28, Processing Time 0.03 seconds

Research for possible Service Interval of High Speed KTX train in conventional KyoungBu-Line (기존 경부선 구간의 고속열차 운행가능시격에 대한 연구)

  • Lee, Chang-Mu;Kim, Joo-Rak;Lee, Han-Min;Oh, Se-Chan;Kim, Gil-Dong
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.1461-1467
    • /
    • 2006
  • In case of accidents at the line of Seoul-Pusan high speed railway, high speed train should be operated with making a detour by using existing Seoul-Pusan railroad. For Dae-jeon$\sim$Dae-Gu section which has fragile structures, following points are investigated. In operating existing train, train running time is analyzed by the case of only high speed train being in service and the case of high speed train being in service on condition that existing train is operated. Also the possibility about operation on present train headway and train headway that is applicable to operation and vocational problems would be examined.

  • PDF

Numerical Simulation of the Unsteady Flow Field Induced by a High-speed Train Passing through a Tunnel (터널을 통과하는 고속철도차량에 의해 형성되는 비정상 유동장의 수치해석)

  • 권혁빈;이동호;김문상
    • Journal of the Korean Society for Railway
    • /
    • v.3 no.4
    • /
    • pp.229-236
    • /
    • 2000
  • In this study, the unsteady flow field induced by a high-speed train passing through a tunnel is numerically simulated by using an axi-symmetric Euler Equation. The modified patched grid scheme applied to a structured grid system was used to handle the relative motion of a train. The hybrid-dimensional approach which mixed 1D and axi-symmetric dimension was used to reduce the computation time and memory storage. By employing the hybrid-dimensional approach, a long tunnel as much as 5 km was able to be simulated efficiently. The results show that the maximum pressure rise in the tunnel by the entrance of the train is a function of both train speed and train-tunnel cross-sectional area ratio. The unsteady pressure fluctuation in the tunnel and around the train was also investigated in the real condition; Korean high-speed train on the Seoul-Pusan line.

  • PDF

Noise Prediction and Design of Soundproof Facilities for the High Speed Train (고속열차(TGV) 주행시 연변에서의 소음예측 및 방음시설설계)

  • ;J. P. Clairbois
    • Journal of KSNVE
    • /
    • v.9 no.6
    • /
    • pp.1106-1115
    • /
    • 1999
  • This paper sums up the study of the soundproof facilities (noise barriers) to be placed on the test track section within the Seoul-Pusan H.S.T. project. The objective of this study is to determine optimum design of soundproof including height, length, location, sound absorbing materials for test track(chonan-taejon). This paper shows the model to design the shape and materials of noise barrier for high speed trains(TGV, ICE, ect). The design of soundproof facilities is to be conducted by MITHRA for the prediction of noise impact of the TGV and for optimising noise barriers in order to reduce the noise generated by high speed trains. A number of computer simulations are carried out in order to determine the specification of noise barrier on test track.

  • PDF

The Feasibility study of Commission plan in HEMU (High-speed Electric Multiple Unit) System (분산형 고속철도 시스템의 시운전방안 효율성 검토)

  • Cho, B.C.;Kim, K.G.;Jeong, S.H.;Kim, J.S.;Lim, K.M.
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1039-1044
    • /
    • 2008
  • By the result of efforts for the technology development of G7 trainset, the technology of domestic high-speed train KTX-II has lately been put to practical use while a forward countries of railway, which have their own developing ability of high-speed train, are competing against each other for the development of faster high-speed train system. Japan has been commissioning of FASTECH 360 which was developed in June 2005. Also France and Germany have been commissioning of next generation high-speed train such as AGV and ICE-3, developed basing on technology of their existing high-speed train system(TGV and ICE), its maximum commercial running speed is 360kph, and adopted multiple unit system. For the development of technology of domestic high-speed train and enhancement of national technology competitive power, HEMU (High-speed Electrical Multiple Unit) development project has been carried out as a national R&D project from last August. For the executing of HEMU's maximum speed test, we have investigated the high speed line characteristics (i.e. radius of curvature, gradient, cant etc.) of Seoul-Pusan line and Honam line which is under construction. We'd like to examine a study of condition for the best HEMU T&C line considering HEMU's characteristics (i.e. acceleration, deceleration etc.) and its interface with infrastructure in this paper.

  • PDF

an Analysis for the Effects of Changes of Aerodynamic Forces by a High Speed Train entering a Tunnel on a High Speed Catenary System(I) (터널로 진입하는 고속 전철에 의한 공력 변화가 고속 가선계에 미치는 영향 분석(I))

  • 조용현;정흥채;권혁빈
    • Proceedings of the KSR Conference
    • /
    • 1999.11a
    • /
    • pp.333-343
    • /
    • 1999
  • When a high speed train enters a tunnel, wind speed passing through the train in a tunnel section becomes higher due to the reverse flow to the direction of the train. The higher wind speed gives more aerodynamic forces to the pantograph on the train. Therefore, it is necessary to perform aerodynamic and dynamic analyses in order to check whether the current collection of the high speed train, entering the tunnel, still remain permissible or not. In this paper, the aerodynamic analysis has been performed under the assumption that a high speed train at 300 km/h enters a tunnel whose cross sectional area Is 107/㎡ and length is 1000m. In consideration of the aerodynamic analysis results, the dynamic analysis has been performed based on the catenary and pantograph dynamic models in SEOUL-PUSAN high speed rail, using the GASENDO developed by RTRI. In addition, the fatigue life of the contact wire has been reviewed using the Goodman diagram. Based on the analysis results, it is concluded that the increase of the aerodynamic forces on the pantograph in the tunnel section shall not affect characteristics of current collection adversely except that motions of the pantograph may be constrained by bump-stops.

  • PDF

Train Performance Simulation Program for Korea High Speed Railway System (한국형 고속전철 열차성능해석 프로그램)

  • 이태형;박춘수;신중린
    • Journal of the Korean Society for Railway
    • /
    • v.6 no.2
    • /
    • pp.100-107
    • /
    • 2003
  • This paper presents development of train performance simulation(TPS) program to analyze traction performance, braking performance and energy consumption for Korea high speed railway system. The conventional TPS program have some inconveniences such as DOS-based platform, user interface and limited function. The simulation technique model using scenario menu, various analysis function and object-oriented design/programming is presented. This simulation result have been compared with Alstom's for the Seoul-Pusan High Speed Rail Project.

Opening to traffic 3 annual after KTX train interior noise quality analysis (개통 3주년 이후 KTX 열차 차내 소음 특성 분석)

  • Lee, Chan-Woo;Kim, Jae-Chul
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.899-902
    • /
    • 2007
  • The KTX train which brings April 2004 high-speed railroad commerce operation time is operated currently Kyungbu line Seoul-Gwangmyeong-Daejeon-Dongdaegu-Pusan and Honam line Youngsan-Gwangmyeong-Seodaejeon-Kwangju/Mokpo. The high-speed railroad opening to traffic after KTX train interior noise follows in railway line quality change and it is changing together. From the research which it sees until opening to traffic after present time of the KTX vehicle it executed an interior noise quality change from Kyungbu line.

  • PDF

Simulation of An Economical Run for High Speed Train (고속철도 차량의 경제 주행 시뮬레이션)

  • 황희수
    • Proceedings of the KSR Conference
    • /
    • 1998.11a
    • /
    • pp.161-168
    • /
    • 1998
  • This paper presents an simulation methdology for determining an economical running pattern for a high speed train which minimizes energy consumption under an given trip time margin. The economical running pattern is defined with an economical maximum speed in traction phase, a speed at the end of coasting and a speed at the end of regenerative braking alone in braking phase. An economical run for subways is also described. As a case study, the simulation is carried out fer an economical run of high speed NamSeoul-Pusan line, and the results described. To do this, train performance simulation program is built and extended to be able to find an economical running pattern and then to simulate the defined economical run.

  • PDF