The Feasibility study of Commission plan in HEMU (High-speed Electric Multiple Unit) System

분산형 고속철도 시스템의 시운전방안 효율성 검토

  • 조병찬 (한국철도시설공단 기술본부) ;
  • 김광길 (한국철도시설공단 기술본부) ;
  • 정상훈 (한국철도시설공단 기술본부) ;
  • 김종선 (한국철도시설공단 기술본부) ;
  • 임광만 (한국철도시설공단 기술본부)
  • Published : 2008.06.12

Abstract

By the result of efforts for the technology development of G7 trainset, the technology of domestic high-speed train KTX-II has lately been put to practical use while a forward countries of railway, which have their own developing ability of high-speed train, are competing against each other for the development of faster high-speed train system. Japan has been commissioning of FASTECH 360 which was developed in June 2005. Also France and Germany have been commissioning of next generation high-speed train such as AGV and ICE-3, developed basing on technology of their existing high-speed train system(TGV and ICE), its maximum commercial running speed is 360kph, and adopted multiple unit system. For the development of technology of domestic high-speed train and enhancement of national technology competitive power, HEMU (High-speed Electrical Multiple Unit) development project has been carried out as a national R&D project from last August. For the executing of HEMU's maximum speed test, we have investigated the high speed line characteristics (i.e. radius of curvature, gradient, cant etc.) of Seoul-Pusan line and Honam line which is under construction. We'd like to examine a study of condition for the best HEMU T&C line considering HEMU's characteristics (i.e. acceleration, deceleration etc.) and its interface with infrastructure in this paper.

Keywords