Process Model for development of EVMS in Nuclear Power Plant Project (원전건설 성과관리시스템(EVMS) 개발을 위한 프로세스 모델 연구)

  • Kim, Yun-Myung;Won, Seo-Kyung;Shin, Il-Sub
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.58-59
    • /
    • 2014
  • EVM(Earned Value Management) is a management methodology for integrating scope, schedule and resources, and for objectively measuring project performance and progress. EVMS(Earned Value Management System) has been used for the performance measurement of R&D and construction projects in developed countries such as United States, United Kingdom and Australia. The nuclear power plant (NPP) projects in Korea have not applied EVMS. However, EVMS has come into request for overall schedule and cost risk management and performance measurement in overseas project of the nuclear power plant as a contractor. In this paper, based on the global EVMS guidelines, EVMS per unit processes have been developed for NPP projects. Moreover, using Business Process Management (BPM), it proposes an integrated process model with tasks, roles, and procedures for EVMS for NPP construction projects.

  • PDF

Improved Link System of Schedule and 3D Object for VR-base Construction Project (가상건설기반의 건설공사 일정 및 3D객체 연동시스템의 개선된 구축방안)

  • Kwon, Jung-Hui;Moon, Hyoun-Seok;Park, Seo-Young;Gi, Sang-Bok;Kang, Leen-Seok
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.289-294
    • /
    • 2007
  • Virtual reality (VR) technology for construction project includes 3D CAD application and 4D CAD system for visualizing construction schedule data. 3D CAD application is more important in the design phase and 4D CAD system is effective tool in the construction phase. This study suggests a methodology to develop VR functions that can be used for project life cycle. The results of this study includes composition algorithms to make VR systems such as bird's eye view system, VR drawings system, VR telepresence system and VR risk management system. Those methodologies can be used for integrated VR system with nD CAD object.

  • PDF

A Study on the Cost Hierarchical System of Nuclaer Power Plant Construction Project for Introcusting Earned Vaule Management System (성과관리시스템(EVMS) 도입을 위한 원전 건설사업비 관리체계 세분화 방안에 관한 연구)

  • Lee, Sang-Hyun;Kim, Woo-Joong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.230-231
    • /
    • 2019
  • The nuclear power plant construction project is large-scale, has various stakeholders and computer system, and is produced and managed a large amount of information. The domestic nuclear power plant construction project has accumulated data based on many years of experience in the system. It has the competitiveness to suggeest alternatives that meet the requirement of the client in the overseas nuclear power plant project. Earned value management, which integrates schedule and cost, is possible to risk management. It was developed the earned value management system considering the the actual data properties and types of the preceding nuclear power plant construction projects. It will be able to increase the nuclaer power plant export competieiveness. Therefore, it was palned to carry out future stuies so that it be able to complement the measure to integrate cost and schedule in consideration of actual data(quantity of activity, etc.).

  • PDF

Cooperation Case between Railway Specialized Authorities and Local Government in LRT Project (경전철사업에서의 철도전문기관과 지자체 간의 협력사례)

  • Song, Jae-Il
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2217-2224
    • /
    • 2011
  • The railway industry has well developed with Korea's economic growth as follows - Industrial railway's electrification in 1973, Seoul subway opening in 1974, Busan subway opening in 1985, High speed railway opening in 2004. But LRT as city transportation means has been faced with many difficulties. Looking at the LRT projects implemented until now, there are some issues like the transportation demand, the quality & safety of RS and facilities, the poor management of inhabitant complaints and the failure to maintain policy coherence. They have caused not only the project schedule to extend but also the project costs to increase, even to obstruct the project progress itself in some cases. These risk factors become the obstacle of LRT project's success, but it is said that more basic problem is the lack of risk management capability of competent authorities in railway business. Under these circumstance, Railway specialized Authorities and Local government have cooperated to identify various risk factors and to prepare the measures in advance, so we try to introduce this cooperation case, which will help other local government as an useful reference.

  • PDF

Design of Checklist for Improvement of Reliability of Uncertainty and Variability Environment (불확실성 및 가변성 환경의 신뢰성 향상을 위한 체크리스트 설계)

  • Lee, Eun-Ser
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.3 no.10
    • /
    • pp.389-396
    • /
    • 2014
  • There are many defects when we're working on a project. Especially, if we don't have experience in similar field, defects have a strong influence on the system entirely. Therefore, management of risk such like defects is important the factor for success of project. Finally, efficient management of risk can guarantee handling problems such like fault tolerancy, unexpected quality and delay of schedule. In this paper, we propose checkpoint for improvement of reliability and are willing to improve the reliability of an entire system using it.

A Study on 4D CAD and GIS Integrated System for Process Risk Management Model (4D CAD와 GIS의 통합시스템을 통한 프로젝트 단계별 리스크관리 모델에 관한 연구)

  • Jeon, Seung-Ho;Yun, Seok-Heon;Paek, Joon-Hong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.7 no.3
    • /
    • pp.91-98
    • /
    • 2007
  • Recently a construction industry introduces information that brings about many advantages in the early planning phase, design phase and construction phase. Especially it replaces 2D, 3D systems(usually using explanation of drawing information) ai 4D CAD(offering a sort of 4D-having relation of construction schedule and 3D drawing information). Nevertheless a 4D has these benefits, it has limits which are not only usually using 3D modeling but also limit of making full use of practical affairs because of a lack of connecting varietals of progress of work. To solve these uppermost limits, this research is presenting unified systems to use in risk management which are efficient management of space and non-space information, space analysis, making full use of data base, introducing GIS system of easy interaction.

Development of Delay Responsibility Determination Model based on the Probabilistic Risk Analysis

  • Cho, Ji Hoon;Lim, Dong Yui;Kim, Sang Bum
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.599-599
    • /
    • 2015
  • This research attempts to resolve the construction delay issues of indirect delays by developing the "Delay Responsibility Determination Model" (DRM) based on probabilistic risk analysis. DRM is envisioned to provide a way of quantitatively analyzing impacts of delayed activities while considering both direct and indirect influences. With the successful development of DRM, it would be possible to present relative probabilistic measures to all the related stakeholders in terms of their contributions to schedule delays. Upon the development completion of DRM, "Korean Construction Delay Claim/Dispute Resolution Protocols" will also be prepared to facilitate the effective use of DRM.

  • PDF

Improvement of Construction Process Control to Reduce Construction Risk (건설공사 공정관리이행의 리스크 감소를 위한 개선방안)

  • Park Hong-Tae;Son Chang Baek;Kang Leen Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.1 s.1
    • /
    • pp.35-44
    • /
    • 2000
  • The major objective of construction process control(CPC) is to provide construction managers with operational information that will help reduce project duration and save project cost. However, the CPC in Korea is being applied to construction projects with some basic problems such as the inconvenience of CPC S/Ws and the process control unconcerned with construction information classification system and computer system to integrate cost and schedule. This study analyzes the present condition of CPC including the basic problems, and then suggests the reform measures in technical and operational viewpoints to reduce construction risk. The focus of study is on the technical improvement for the application of construction information management system applicable to both cost estimating and schedule management.

  • PDF

The Efficacy of Visual Activity Schedule Intervention in Reducing Problem Behaviors in Children With Attention-Deficit/Hyperactivity Disorder Between the Age of 5 and 12 Years: A Systematic Review

  • Thomas, Naveena;Karuppali, Sudhin
    • Journal of the Korean Academy of Child and Adolescent Psychiatry
    • /
    • v.33 no.1
    • /
    • pp.2-15
    • /
    • 2022
  • Objectives: Children with attention-deficit/hyperactivity disorder (ADHD) tend to be noisy and violate rules with their disruptive behaviors, resulting in greater difficulties with off-task behaviors and being at risk for social refusal. The visual activity schedule (VAS) intervention program is a frequently used method to teach multiple skills involving on-task, use of schedules, transition behaviors, social initiation, independent play skills, classroom skills, and academic skills. The current systematic review aimed to examine the efficacy of using VAS intervention in reducing problem behaviors in children with ADHD between 5 and 12 years of age. Methods: Systematic searches were conducted using two electronic databases (PubMed and Scopus) to identify relevant studies published in English between 2010 and 2020. Four studies met the inclusion criteria: two studies examined the effect of schedule-based tasks and the use of an iPad on classroom skills, while the other two examined randomized clinical trials (RCTs) of psychosocial treatment for ADHD inattentive type and a cross-sectional study examined the impact of the group size on task behavior and work productivity in children with ADHD. Results: The findings indicate that the interventions used in all four studies could lead to increased satisfaction among participants and parents, as well as a reduction in problem behavior. In terms of the research indicators, the RCT had low quality, while the others were of high quality. Conclusion: A larger number of studies and the ADHD clinical population would help to increase the generalizability of future reviews of treatments in this context.

Analysis of the Schedule Risk using PROMETHEE in Building Construction Management (건설관리에서의 PROMETHEE기반 공정 리스크 분석)

  • Lee, Jang-Young;Yoon, You-Sang;Jang, Myung-Houn;Suh, Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.25-34
    • /
    • 2010
  • The building construction projects include a variety of risk factors due to uncertainties. To succeed in the projects, it is important how risks are managed. Risk management is composed of identification, analysis and response. Especially, the risk analysis is important to objectively calculate significance of risk factors. This paper evaluates a method to find priorities of risks using the AHP(Analytic Hierarchy Process). The method has some defects; (1) the consistency becomes weak as the number of pair-wise compared risks is large, and (2) the input and output procedures are complex when risks are added to or removed from a risk database. Thus the paper adopts the PROMETHEE(Preference Ranking Organization METHod Enrichment Evaluations) analysis process which is able to overcome the limitation of the AHP restricted to 9 risk factors. The PROMETHEE makes the procedure of risk analysis simple, when the risk factors pull out and put in the risk database. The purpose of this study is to provide process of risk analysis to use the PROMETHEE.