• Title/Summary/Keyword: Schedule risk

Search Result 222, Processing Time 0.024 seconds

The Construction Management Plan of Dong Myoung Service Area (동명휴게소 건설사업관리 수행계획)

  • In Chi-Sung;Kim Jeong-Won;Jung Soon-Gil;Park Gwon-su;Lee Sung-Gak;Do Sang-Yeek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.40-47
    • /
    • 2003
  • The main purpose of Construction Management(CM) is the improvement of efficiency and effectiveness of the project with construction methodologies systematically and technically. This pilot project Dong Myeong Service Area and Gas Station project among 5 projects designated and supervised by Ministry of Construction and transportation(MOCT), is to reduce cost, to maintain and control schedule, to keep proper quality, Claim and Risk through Partnering, Design Review, Constructability, Value Engineering and Project Management Information System(PMIS) and so on. Major factors of CM Plan are introduction of the phased and classified Construction Management Services from initiation of project to completion and adaptation of CM technologies and guide the implementation methodologies of the CM Pilot Project in CM construction market.

  • PDF

Maturity model considering the interrelation between software project management areas (소프트웨어 프로젝트 관리영역의 상호영향을 고려한성숙도 모델)

  • Jeon, Soon-Cheon
    • Journal of Advanced Navigation Technology
    • /
    • v.15 no.5
    • /
    • pp.823-832
    • /
    • 2011
  • Recently, as the project becomes larger and the number of project increases by the information system integration in the public and financial sectors, it is necessary to have a proper plan to manage the information system project. There have been many researches about the project management, success elements and failure elements, but the research on the interrelation between project management areas leaves much to be desired. This research deduces the scope, schedule, quality, work force and risk as the project management areas from the preceding research and the questionnaire and interview with PM developers, information system builders and data processing experts. And, it analyzes the interrelation and the relative importance between management areas, classifies the progress of the management areas under plan, implementation and completion stage and presents the frame to evaluate the accomplishment of each progress.

A Development and Verification Process of Auto Generated Code for Fly-By-Wire Helicopter Control Law (Fly-By-Wire 헬리콥터 비행제어법칙 자동생성코드 개발 및 검증 프로세스)

  • Ahn, Seong-Jun;Kim, Chong-Sup;Cho, In-Je;Heo, Jin-Goo
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.41 no.6
    • /
    • pp.488-494
    • /
    • 2013
  • The control law design and analysis environment of the FBW helicopter system have been developed using model base design method. The model based design is generally used in a aircraft, unmanned aerial system and automobile as well as rotorcraft development. The model based design provides many advantages such as development risk and schedule reduction using simulation and autocode generation. This paper describes a development of process for verification and validation of auto generated code for FBW helicopter flight control law. And this process is applied for Fly-By-Wire Helicopter Development Project. The results of functional test for auto generated code meet several specific requirements.

Research for improving quality of SI(System integration) development project (시스템 통합(SI) 구축 사업 품질 향상을 위한 연구)

  • Kim, Seok-Kwan;Ryu, Gab-Sang
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.11 no.3
    • /
    • pp.215-220
    • /
    • 2018
  • This paper limited the participation of large corporations in the mass information market by revising the Software Industry Promotion Act in order to increase business opportunity, equality of opportunity, and capacity building for small and medium sized IT companies. However, it is a fact that the medium and small SW companies have insufficient business capacity and expose various problems such as quality degradation of public information business, inadequate risk management, and deterioration of schedule management. In order to solve this problem, this paper derived the factors of quality deterioration in the system integration project and proposed to carry out the project by using some activities of VISUALIZATION, rigorous test management and Agile Methodology as a solution. Applying these measures to healthcare IT projects developed by midsize / small-sized IT companies has improved communications, improved quantitative progress management and improved project visibility. In addition, it contributed to minimizing defect resolution time, improving the requirement coverage ratio, and shortening unnecessary meeting time.

A Study on Prevention of Major Accidents Through Utilization of Fall-Preventing Safety Installations (재해율의 예측에 의한 강구조공사의 중대재해 예방에 관한 연구)

  • 손기상;정경운
    • Journal of the Korean Society of Safety
    • /
    • v.13 no.4
    • /
    • pp.221-229
    • /
    • 1998
  • This study, with a view point to prevent accidents arising from steel structure, construction process, has taken an approach of reviewing related materials and construction safety guidelines, conducting questionnaire surveys and on field surveys. This study has also analyzed and classified accident cases and disclosed elements concerned with those accidents. A comparative analysis of the disclosed elements against the statutory provisions regarding industrial safety and it showed that strict observance of safety rules of the accident prevention measures in industrial safety standards will result in a decrease in accidents. It is concluded, however, that additional accident prevention measures, as suggested below, should be implemented for performing of more practical and positive accident prevention. 1) Thorough review and preparation at pre-working stage at sites : Such elements of fall preventing facilely as supporting ropes and steel fabrications for safety guard rails should be initially reflected on detailed drawings and shop drawings so that they can be installed in advance at fabricating plants. 2) Sets of steel frame stairs for work platform should be installed or secured with priority and temporary installation of such prefabricated platform as scaffolds should be installed in advance with those platform attached to the frame members on the ground whenever possible before they are lifted. 3) A decrease in the rate of accident by more than 10% on Tuesdays and Thursdays, has been shown from the accident analysis so schedule of construction process should consider possible weekday of high risk of accidents such as Tuesday and Thursday. 4) An array of systemized safety activities should be adopted, such as legal installation of safety facilities based on advance safety management plan, maintenance of safety for machinery and construction equipment, and strict compliance of safety rules by workers.

  • PDF

Analysis on Mission Lifetime and Collision Avoidance of Cubesat Launched from ISS (ISS에서 발사되는 큐브위성의 임무수명 및 충돌회피 분석)

  • Yeom, Seung-Yong;Kim, Hongrae;Chang, Young-Keun
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.43 no.5
    • /
    • pp.413-421
    • /
    • 2015
  • Since the first Cubesat was launched in 2003, there have been more than 230 Cubesats launched so far. Due to their small size and lightweight, Cubesats were launched by utilizing the empty space of regular launch vehicle. However, this launch method has a weakness that has been easily affecting by the schedule of major payloads. As a new solution to this problem, it has been proposed that a robot arm installed on ISS would be used to launch Cubesats. The orbits of Cubesat deployed from the ISS in various angles and directions are analyzed in this paper. We also analyze the possibility of collision between the Cubesat and ISS within the operational orbit of the CubeSat and eventually calculate the optimal angle of a robot arm, which maximizes the lifetime of Cubesat and minimizes the risk of collision between the Cubesat and ISS.

The Design of Optimal Recall Insurance Product (최적 리콜보험상품 설계에 관한 연구)

  • 김두철
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.3 no.4
    • /
    • pp.325-332
    • /
    • 2002
  • In the process of designing pareto optimal insurance contract, it is necessary to assume that insurance contract conditions are endogenous to build a model. The expected utility, the non-expected utility and the state-dependent utility function can be applied as a insurance decision making principle. The insurance costs may have the linear, convex, and concave ralationship with the indemnity schedule. However, the sunk cost and fixed cost must be recognized. The deductible which decides whether an insurance contract to be a full or partial insurance contract can exist in the forms of straight deductible or diminishing deductible. Indeciding the level of deductible, the types of the insurance and the risks to be insured should be the deciding factors. Especially for recall insurance, there is relatively high chance that the recalling company being bankrupt. Therefore, the possibility of bankrupcy should be the considering factor in deciding the policy limit. The existence of the incomplete market and uninsurable background risk should be understood as restricting conditions of the pareto-optimal insurance contract.

  • PDF

The Effectiveness of Independent Verification and Validation of Safety-critical Aviation Systems (항공 안전 필수 시스템에 대한 독립적 검증 및 확인의 효과도 분석)

  • Kim, Young-Hoon;Yoo, Beong-Seon;Kang, Ja-Young
    • Journal of Advanced Navigation Technology
    • /
    • v.21 no.2
    • /
    • pp.155-162
    • /
    • 2017
  • In recent years, aviation-related safety-critical systems have been developed in Korea, but these products have not satisfied the specified requirements and thus have not been commercialized or commercialized. Due to increasing complexity of the modern aviation system, traditional verification and validation techniques are not sufficient to identify and reduce latent risks in the system. To overcome this shortcoming, a new method which is called 'Independent verification and validation (IV&V)' is suggested. However, academic researches on the effectiveness of this independent verification and validation have not been conducted domestically, and it is performed very rarely even overseas. Therefore, in this paper, we investigated the application of independent verification and validation of the safety-critical aviation systems performed by advanced aviation organizations, and analyzed various positive effects on projects. As a result of the analysis, IV&V shows that early error detection rate is increased, potential risk is mitigated early, and the complex reworking probability, which appears later in the development life cycle, is reduced, greatly preventing the development schedule and costs from increasing.

Effect of supportive periodontal therapy on the prevention of tooth loss in Korean adults

  • Kim, Sang-Yul;Lee, Jae-Kwan;Chang, Beom-Seok;Um, Heung-Sik
    • Journal of Periodontal and Implant Science
    • /
    • v.44 no.2
    • /
    • pp.65-70
    • /
    • 2014
  • Purpose: The purpose of this retrospective study was to evaluate the effect of patient compliance with supportive periodontal therapy (SPT) on tooth loss in Korean adults. Methods: The periodontal records of 134 patients were reviewed for this study. They completed active periodontal treatment from 1999 to 2001 and were placed on a schedule of periodic follow-up visits for SPT. Patient compliance was classified into complete compliance (CC), erratic compliance (EC), and noncompliance (NC) groups. Re-examinations were carried out $11.0{{\pm}}0.8$ years after the active periodontal treatment. The prognosis for each tooth was determined as good, questionable, or hopeless according to the bone loss observed in pretreatment radiographs. Results: The rate of tooth loss of the CC group was significantly lower than that of the NC group. The tooth loss/patient and the tooth loss/patient/year were not significantly different between the three groups. The rates of tooth loss in the good, questionable, and hopeless prognosis groups were 6.7%, 9.5%, and 13.2%, respectively. For the teeth with a good prognosis, the rate of tooth loss of the CC group was significantly lower than that of the NC group (0.4% vs. 5.1%). For the teeth with a questionable prognosis, the CC group showed a significantly lower rate of tooth loss than did the EC group (4.1% vs. 30.7%) or the NC group (4.1% vs. 25.6%). For the teeth with a hopeless prognosis, the rates of tooth loss were not significantly different among the three groups. Conclusions: Within the limits of this study, the patients who showed a poor compliance with SPT were more likely to lose teeth than were the regularly compliant patients. However, the risk of tooth loss with a hopeless prognosis was high irrespective of the compliance.

SaaS-based construction process transfer and Safety Management System (SaaS기반의 건설공정전송 및 안전관리 시스템)

  • Kim, Eui-ryong;Jung, Soo-Sung;Kim, Young-Gon
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2015.05a
    • /
    • pp.735-737
    • /
    • 2015
  • In this paper, SaaS (Software as a Service) based transport and construction process safety management systems by utilizing the construction work process management and safety management and schedule, and results for various types of construction process, achieved through high-speed wireless Internet access by applying to ensure a systematic means for safety and can quickly and accurately manage all made within the process control system. The operator should be indicated by using a smart phone to work as a supervisor report the current status and results of the operation. Also be reported to the supervisor immediately in an emergency situation and there is no vibration occurs over a period of time the smartphone is to check the danger to the operator. If the commissioner is directed to specific business processes that establish and verify the results obtained and the result is satisfied by presenting the part down the measures insufficient command of the field workers risk situations. In the case of software (server) to store all the data relating to the operation member in charge of management and security.

  • PDF