• Title/Summary/Keyword: Schedule risk

Search Result 222, Processing Time 0.027 seconds

A study on the Project Performance Measurement Baseline for Clients (발주자를 위한 프로젝트 성과측정기준선 설정 방안에 관한 연구)

  • Ko, Dae-Jun;Choi, Eun-A;Park, Dong-Jin;Lee, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.513-516
    • /
    • 2008
  • The risk in the constructions projects is extremely diverse because there are too many indefinite factors. Therefore, Performance Measurement Baseline(PMB) is needed regularly during the construction process. However, nowdays, the PMB in the constructions projects is for contractors' PMB and Performance Management(PM). Clients have a lot of difficulties to control and manage the projects. Therefore, this paper classifies schedule and cost data of the public apartments houses which is a actual cases into types and then conducts regression analysis and deduces a regression. In addition to this paper establishes the Work Breakdown Structure(WBS) and suggests the PMB for the clients through using that.

  • PDF

A Process of the Technical Performance Management for A Space Launch Vehicle R&D Project (우주발사체 개발사업을 위한 기술성능관리 프로세스)

  • Yoo, Il Sang;Cho, Dong Hyun;Kim, Keun Taek
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.10 no.2
    • /
    • pp.71-79
    • /
    • 2014
  • To enhance success probability of a system development project, its overall risk level should be minimized through systematically managing schedules, costs, and technical performances. However, Attempts to manage technical performance compared to numerous efforts to control costs and schedules in such projects are deficient. Particularly, a space launch vehicle, a large complex system, development project is much less likely to meet its technical performance objectives due to its technological difficulty, along with schedule delay and cost overrun. The technical performance management (TPM) is a method for tracking and managing technical progress in order to achieve technical performance targets within schedule and budget. In this paper, we investigate applications of the TPM in several space launch vehicle development projects. Then we propose and validate the TPM process to achieve a successful mission in such projects.

Characteristics of AS9100 Rev. C Quality Management System and Its Implementation (AS9100 Rev. C 규격의 특징과 적용 방안)

  • Yeo, Eung-Mo;Byun, Jai-Hyun
    • Journal of Korean Society for Quality Management
    • /
    • v.39 no.4
    • /
    • pp.516-526
    • /
    • 2011
  • The AS9100 standard builds upon the ISO 9001:2000 quality management system requirements(in their entirety) and defines additional quality management system requirements for the aerospace industry. The 9100 standard on quality management system requirements is intended to be used at all levels of the supplier chain. The International Aerospace Quality Group has released a revision to 9100 for the aviation, space and defense industries. This change aims at improvement on quality, schedule and cost performance by adopting new requirements based on stakeholders' needs. This paper is to review how the AS9100 QMS Requirement has been established and improved, and to communicate the significant changes from AS9100, Rev. B to Rev. C focusing on reasons for revisions. The proposed schedule and considerations on the transition of the changes to Rev. C are also dealt with in this paper.

기후요소를 활용한 철골공사기간 예측 시스템에 관한 연구 - 실시간 진도관리 시스템 적용을 중심으로 -

  • Park, Jung-Lo;Yoo, Seung Kyu;Kim, Kyung-Hwan;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.213-217
    • /
    • 2009
  • Weather factors affect cost increases and progress management under construction. Because progress schedule is delayed by weather factors, the construction costs are increased. It is an essential element to control the progress schedule applying weather factors to the progress management. This study applies monthly working-day percentages which is estimated by databases of past weather information to RTPM system. Through do progress management in construction projects exactly, will try to minimize risk of process control that do that is to weather factors. Also, will compare calamity in safety supervision side that do that is to weather factors beforehand. Based on the factors and the expected impact of factors together with the weather data during the last 50 years in Seoul region gathered from Korea. Through it, calculated number of month working day of RCA's structural steel work. Studied way that apply to RTPM system.

  • PDF

Risk Factors for Breast Cancer, Including Occupational Exposures

  • Weiderpass, Elisabete;Meo, Margrethe;Vainio, Harri
    • Safety and Health at Work
    • /
    • v.2 no.1
    • /
    • pp.1-8
    • /
    • 2011
  • The knowledge on the etiology of breast cancer has advanced substantially in recent years, and several etiological factors are now firmly established. However, very few new discoveries have been made in relation to occupational risk factors. The International Agency for Research on Cancer has evaluated over 900 different exposures or agents to-date to determine whether they are carcinogenic to humans. These evaluations are published as a series of Monographs (www.iarc.fr). For breast cancer the following substances have been classified as "carcinogenic to humans" (Group 1): alcoholic beverages, exposure to diethylstilbestrol, estrogen-progestogen contraceptives, estrogen-progestogen hormone replacement therapy and exposure to X-radiation and gamma-radiation (in special populations such as atomic bomb survivors, medical patients, and in-utero exposure). Ethylene oxide is also classified as a Group 1 carcinogen, although the evidence for carcinogenicity in epidemiologic studies, and specifically for the human breast, is limited. The classification "probably carcinogenic to humans" (Group 2A) includes estrogen hormone replacement therapy, tobacco smoking, and shift work involving circadian disruption, including work as a flight attendant. If the association between shift work and breast cancer, the most common female cancer, is confirmed, shift work could become the leading cause of occupational cancer in women.

Strut as a Permanent System using Composite Beams (층고절감형 거더를 이용한 영구 스트러트 공법)

  • Hong, Won-Kee;Park, Seon-Chee;Kim, Jin-Min;Lee, Ho-Chan
    • KIEAE Journal
    • /
    • v.8 no.1
    • /
    • pp.87-92
    • /
    • 2008
  • Sheathing work used for excavation in a crowded downtown is generally a temporary strut method using H-piles and sheathing wall includes lagging, CIP, SCW or slurry wall. A temporary strut serving the support for sheathing wall acts to resist the earth pressure, but it shall be removed when installing the underground structure members. A traditional temporary strut might cause the stress imbalance of the sheathing wall when it is demolished, resulting in time extension and the risk of collapse. A traditional temporary strut method thus needs to be improved for schedule and cost reduction, risk mitigation and for preparation for potential civic complaint. A permanent strut method doesn't require installing and demolishing the temporary structure that will lead to reducing the time and cost and the structural risk during the demolition process. And given the girder, the part of the underground structure, serves the role of strut, it can secure the wider interval compared to the traditional method, which enables to secure the wider space for the convenience of excavation as well as enhance the constructability and efficient site management. The thesis was intended to study the composite girder designed to use the strut as permanent structure so as to reduce the excavation and floor height.

Study on the Estimation of Seasonal Ambient Current for the Application of Ambient Adjusted Line Rating(AAR) in Overhead Transmission Lines Using Risk Tolerance(RT) Method (가공송전선로의 AAR 적용 시 Risk Tolerance 분석을 이용한 계절별 최대 허용전류 산정 및 적용에 관한 연구)

  • Lee, Jaegul;Bae, Youngjae;Song, Jiyoung;Shin, Jeonghoon;Kim, Yonghak;Kim, Taekyun;Yoon, Yongbeum
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.1
    • /
    • pp.7-15
    • /
    • 2017
  • Ambient Adjusted line Rating(AAR) method for overhead transmission lines considering Risk Tolerance(RT) was proposed in this paper. AAR is suitable for system operators to plan their operation strategy and maintenance schedule because this can be designed as a seasonal line rating. Several candidate transmission lines are chosen to apply the proposed method in the paper. As a result, it is shown that system reliability was significantly enhanced through maximizing transfer capability, solving the system constraints.

A Study on Private Health Insurance in Korea (민간의료보험의 현황 및 활성화에 관한 연구)

  • 정기택
    • Health Policy and Management
    • /
    • v.7 no.2
    • /
    • pp.109-146
    • /
    • 1997
  • This study explores the feasibility of activating private health insurance in Korea. The rationale for expanding private supplementary health insurance can be found in many cases of health care reforms in the European countries. Private health insurance can not only relieve the financial distress of the government health insurance programs but also offer the medical institutions incentives to improve the quality of medical care. In Korea there is no supplementary health insurance that reimburses for various kinds of diseases based on a well designed fee schedule. Recently, the cancer insurance is the best seller in the health related insurance market. As observed in the U. S. case, the cancer insurance which pays the predetermined amount (indemnity coverage) regardless of the medical charges incurred to the patient is limited in its coverage for the insured. To provide better protection against catastrophic diseases, the government should give insurance companies incentives to develop health insurance products that cover multiple diseases rather than a single disease. Consumers can hardly understand and compare complex insurance products. To resolve the information asymmetries, the government should publish a consumer report that compare various health insurance products in a user friendly way. In the long run, insurance companies will plan to sell health insurance products that charge risk related premium only when insurers accumulate the underwriting know-hows, the government shares data on various health statistics including claims and demographics, and risk pool for high risk patients is well established and subsidized by the government.

  • PDF

Research on the Prevalence and Risk Factors for Anemia according to Working Schedule (교대 근무 여부에 따른 빈혈 유병 현황 및 위험 인자에 대한 연구)

  • EUNA OH;Seong-Kyu Kang;Seunghon Ham;Won-Jun Choi;Wanhyung Lee
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.33 no.2
    • /
    • pp.126-133
    • /
    • 2023
  • Objectives: This study was conducted to find out the prevalence and risk factors of anemia according to shift work. Methods: Data from the Korean National Health and Nutrition Survey (2016-2020) were used. 9,787 workers were divided into shift workers and non-shift workers. The work type between 6AM-6PM was defined as day work, and other work types were defined as shift work. A chi-square test was used to indicate the distribution of risk factors expected to affect shift work in both frequency and percentage. Multiple logistic regression analysis was performed to find out the relationship between anemia prevalence and shift work. Results: As a result of analysis, multiple logistic regression analysis of anemia prevalence and shift work, the OR (95% CI) of male workers on shift work was 2.186 (1.139 to 4.194) and there was a statistically significant difference. Conclusions: In conclusion, anemia in male shift workers should be considered a possibility of health problems. In the future, research based on various data collection should be conducted for research to reveal various causes or diseases of anemia in the future.

Weld Quality Monitoring System Development Applying A design Optimization Approach Collaborating QFD and Risk Management Methods (품질 기능 전개법과 위험 부담 관리법을 조합한 설계 최적화 기법의 용접 품질 감시 시스템 개발 응용)

  • Son, Joong-Soo;Park, Young-Won
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.6 no.2
    • /
    • pp.207-216
    • /
    • 2000
  • This paper introduces an effective system design method to develop a customer oriented product using a design optimization process and to select a set of critical design paramenters,. The process results in the development of a successful product satisfying customer needs and reducing development risk. The proposed scheme adopted a five step QFD(Quality Function Deployment) in order to extract design parameters from customer needs and evaluated their priority using risk factors for extracted design parameters. In this process we determine critical design parameters and allocate them to subsystem designers. Subsequently design engineers develop and test the product based on these parameters. These design parameters capture the characteristics of customer needs in terms of performance cost and schedule in the process of QFD, The subsequent risk management task ensures the minimum risk approach in the presence of design parameter uncertainty. An application of this approach was demonstrated in the development of weld quality monitoring system. Dominant design parameters affect linearity characteristics of weld defect feature vectors. Therefore it simplifies the algorithm for adopting pattern classification of feature vectors and improves the accuracy of recognition rate of weld defect and the real time response of the defect detection in the performance. Additionally the development cost decreases by using DSP board for low speed because of reducing CPU's load adopting algorithm in classifying weld defects. It also reduces the cost by using the single sensor to measure weld defects. Furthermore the synergy effect derived from the critical design parameters improves the detection rate of weld defects by 15% when compared with the implementation using the non-critical design parameters. It also result in 30% saving in development cost./ The overall results are close to 95% customer level showing the effectiveness of the proposed development approach.

  • PDF