A Shortened Common Criteria Evaluation Schedule using Project Management Techniques (프로젝트 관리 기법을 이용한 CC 평가 기간 단축)

  • Park, Soon-Tai;Lee, Hyung-Hyo;Noh, Bong-Nam
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.20 no.2
    • /
    • pp.131-144
    • /
    • 2010
  • IT developed countries since the late 1980s are used to develop IT security evaluation criteria to ensure safety and reliability of information protection products. Currently a variety of products used for the evaluation based on CC and it takes a long period of product evaluation is required to reduce the developers and users. In this paper refer to the published standard evaluation schedule for the EAL4 calculation model offers a trial period. In addition, based on this commitment by adjusting the number of evaluaters to evaluate the applicant in the evaluation period to minimize the position offers.

The Design & Effect Analysis of Project Objective Management Information System for National R&D cooperated by Industries, Universities and Government-supported research institutes (국가 산.학.연 협력 연구개발을 위한 과제목표관리 정보시스템의 설계 및 효과 분석)

  • Sohn, Kwon-Joong;Yoo, Wang-Jin;Lee, Cheol-Gyu
    • Journal of Technology Innovation
    • /
    • v.16 no.1
    • /
    • pp.107-139
    • /
    • 2008
  • We studied how to achieve successful implementation of massive research and development projects requiring collaboration among industries, universities and government-supported research institute. We have set up an engineering process innovation model to be deemed most adequately for all practical purposes, relying on the theoretical studies on the merits and analysis of the effect of the information system based on Milestone Management, Work Breakdown Structures and Web, which is known to be effective for research project (schedule) management and the objective management, and implemented a real-world web-based project objective management system. After a review of various R & D Project Schedule Management methods, we found that this information system was very compatible with project objective management. This project objective management information system carries out research and development projects effectively and efficiently, getting together in cyber-space and sharing information, and has been equipped with an Early Warning Subsystem to allow for pre-analysis and timely response to potential problems arising from the course of the project. The system also contains an Executive Information System that in real time, automatically provides the management information required by managers with the rate of project progress (achievement, fulfillment and delay). Lastly, actual progress can be cross-checked through both on-line objective management on the web-based information system and design review meeting held on site, to improve the efficiency and validity of the information system. Moreover, overall effect was analyzed through questionnaires on how well the system and generated information meet requirements and on the ultimate impact of the system upon objective management and communication. The questionnaire on the system effect revealed that the information system was useful to objective management and communication, and that the quality of the system was more than acceptable as well.

  • PDF

Impacts Of 3 Baselines(Scope, Schedule, Cost) Caused by PMMM Level Under Software Projects. (소프트웨어 프로젝트에서 프로젝트 관리 성숙도가 3Baseline(범위, 일정, 원가)에 미치는 영향 연구)

  • Kim, IlSoo;Lee, SeoukJoo;Choi, JinYoung
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2012.04a
    • /
    • pp.1159-1162
    • /
    • 2012
  • 프로젝트 관리 성숙도(Project Management Maturity Model)란 프로젝트 관리 관련 업무 성숙도를 측정하는 것으로, 프로젝트 성공을 위해 관련 있는 업무가 어느 정도 수준으로 진행되고 있는가를 평가하는 목적으로 주로 사용된다. 본 논문에서는 프로젝트 관리 성숙도를 활용하여 프로젝트 관리 성숙도가 범위, 일정, 그리고 원가에 미치는 영향을 연구 하였다. 연구 결과로 프로젝트 관리 성숙도가 낮으면 범위 변경률이 커지고, 일정이 지연되며, 비용 또한 초과되는 것으로 나타났다. 본 연구의 성과를 토대로 기업이 프로젝트 관리 성숙도 향상을 위해 투자와 노력을 해야 한다는 것을 알 수 있다.

A Study on the Analysis and Current State of the Records Disposition Schedule in College of Education: Focused on J College of Education (교육대학교의 기록물분류기준표 운영현황 및 분석에 관한 연구 - J교육대학교를 중심으로 -)

  • Bae, Sung Jung;Oh, Hyo-Jung;Jang, Jun Kab;Kim, Yong
    • Journal of the Korean BIBLIA Society for library and Information Science
    • /
    • v.27 no.1
    • /
    • pp.187-216
    • /
    • 2016
  • This study aims to identify the problems of the records disposition schedule of the college of education through transaction and records folder analysis. For these purpose, the study conducted a literature survey. Moreover, this study compared and analyzed the records classification system of the all college of education. In addition, we conducted an interview to the person in charge and gained the materials from the national archives in Korea thorough a request of information disclosure. It was found that problems in terms of practical side. Consequently, based on the analysis, the college of education have established and segmented the transactions properly. With the proposed system, records disposition schedule of the college of education can be facilitated.

A Task Scheduling Method after Clustering for Data Intensive Jobs in Heterogeneous Distributed Systems

  • Hajikano, Kazuo;Kanemitsu, Hidehiro;Kim, Moo Wan;Kim, Hee-Dong
    • Journal of Computing Science and Engineering
    • /
    • v.10 no.1
    • /
    • pp.9-20
    • /
    • 2016
  • Several task clustering heuristics are proposed for allocating tasks in heterogeneous systems to achieve a good response time in data intensive jobs. However, one of the challenging problems is the process in task scheduling after task allocation by task clustering. We propose a task scheduling method after task clustering, leveraging worst schedule length (WSL) as an upper bound of the schedule length. In our proposed method, a task in a WSL sequence is scheduled preferentially to make the WSL smaller. Experimental results by simulation show that the response time is improved in several task clustering heuristics. In particular, our proposed scheduling method with the task clustering outperforms conventional list-based task scheduling methods.

A Tabu Search Algorithm for Single Machine Scheduling Problem with Job Release Times and Sequence - dependent Setup Times (작업 투입시점과 순서 의존적인 작업준비시간이 존재하는 단일 기계 일정계획 수립을 위한 Tabu Search)

  • Shin, Hyun-Joon;Kim, Sung-Shick;Ko, Kyoung-Suk
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.27 no.2
    • /
    • pp.158-168
    • /
    • 2001
  • We present a tabu search (TS) algorithm to minimize maximum lateness on a single machine in the presence of sequence dependent setup times and dynamic job arrivals. The TS algorithm starts with a feasible schedule generated by a modified ATCS (Apparent Tardiness Cost with Setups) rule, then through a series of search steps it improves the initial schedule. Results of extensive computational experiments show that the TS algorithm significantly outperforms a well-known RHP heuristic by Ovacik and Uzsoy, both on the solutions quality and the computation time. The performance advantage is particularly pronounced when there is high competition among jobs for machine capacity.

  • PDF

Augmented Reality Framework for Efficient Access to Schedule Information on Construction Sites (증강현실 기술을 통한 건설 현장에서의 공정 정보 활용도 제고 방안)

  • Lee, Yong-Ju;Kim, Jin-Young;Pham, Hung;Park, Man-Woo
    • Journal of KIBIM
    • /
    • v.10 no.4
    • /
    • pp.60-69
    • /
    • 2020
  • Allowing on-site workers to access information of the construction process can enable task control, data integration, material and resource control. However, in the current practice of the construction industry, the existing methods and scope is quite limited, leading to inefficient management during the construction process. In this research, by adopting cutting edge technologies such as Augmented Reality(AR), digital twins, deep learning and computer vision with wearable AR devices, the authors proposed an AR visualization framework made of virtual components to help on-site workers to obtain information of the construction process with ease of use. Also, this paper investigates wearable AR devices and object detection algorithms, which are critical factors in the proposed framework, to test their suitability.

경영정책지원 시스템의 실행방안

  • 김연민
    • Korean Management Science Review
    • /
    • v.1
    • /
    • pp.35-45
    • /
    • 1984
  • This paper deals with the case study of the establishment of decision supporting system in shipbuilding industory. Facts or information of shipbuilding, sales, finance, production strategic planning in shipbuilding industry are considered. General transportation model for shipyard production schedule is formulated, and shipbuilding demand forecasting scheme is also introduced. This paper shows the several methods of DSS in shipbuilding industry. But production schedule strategic planning system by OR technique is emphasized. For the realization of DSS in shipbuilding industry, another efforts (data gathering and programming etc.) should be given on the basis of these methods.

  • PDF

Analysis Testing of Sociocultural Factors Influence on Human Reliability within Sociotechnical Systems: The Algerian Oil Companies

  • Laidoune, Abdelbaki;Rahal Gharbi, Med El Hadi
    • Safety and Health at Work
    • /
    • v.7 no.3
    • /
    • pp.194-200
    • /
    • 2016
  • Background: The influence of sociocultural factors on human reliability within an open sociotechnical systems is highlighted. The design of such systems is enhanced by experience feedback. Methods: The study was focused on a survey related to the observation of working cases, and by processing of incident/accident statistics and semistructured interviews in the qualitative part. In order to consolidate the study approach, we considered a schedule for the purpose of standard statistical measurements. We tried to be unbiased by supporting an exhaustive list of all worker categories including age, sex, educational level, prescribed task, accountability level, etc. The survey was reinforced by a schedule distributed to 300 workers belonging to two oil companies. This schedule comprises 30 items related to six main factors that influence human reliability. Results: Qualitative observations and schedule data processing had shown that the sociocultural factors can negatively and positively influence operator behaviors. Conclusion: The explored sociocultural factors influence the human reliability both in qualitative and quantitative manners. The proposed model shows how reliability can be enhanced by some measures such as experience feedback based on, for example, safety improvements, training, and information. With that is added the continuous systems improvements to improve sociocultural reality and to reduce negative behaviors.

Scheduling Start-up Transient Periods of Dual Armed Cluster Tools (양팔 클러스터장비의 초기 전이 기간 스케줄링)

  • Hong, Kyeung-Hyo;Kim, Ja-Hee
    • Journal of the Korea Society for Simulation
    • /
    • v.24 no.3
    • /
    • pp.17-26
    • /
    • 2015
  • A cluster tool used in many kinds of semiconductor processes for improving the performance and the quality of wafers has a simple configuration, but its schedule is not easy because of its parallel processing module, a lack of intermediate buffers, and time constraints. While there have been many studies on its schedule, most of them have focused on full cycles in which identical work cycles are repeated under constant task times. In this research, we suggest strategies of start-up transient scheduling which satisfies time constraints and converges into a desirable steady schedule for full work cycle. The proposed schedules are expected robust under the stationary stochastic task times. Finally, we show that the strategies make schedules enters the desirable steady schedule and robust using the simulation.