CONSTRUCTION SCHEDULE DELAY RISK ASSESSMENT BY USING COMBINED AHP-RII METHODOLOGY FOR AN INTERNATIONAL NPP PROJECT

  • HOSSEN, MUHAMMED MUFAZZAL;KANG, SUNKOO;KIM, JONGHYUN
    • Nuclear Engineering and Technology
    • /
    • v.47 no.3
    • /
    • pp.362-379
    • /
    • 2015
  • In this study, Nuclear Power Plant (NPP) construction schedule delay risk assessment methodology is developed and the construction delay risk is assessed for turnkey international NPP projects. Three levels of delay factors were selected through literature review and discussions with nuclear industry experts. A questionnaire survey was conducted on the basis of an analytic hierarchy process (AHP) and Relative Importance Index (RII) methods and the schedule delay risk is assessed qualitatively and quantitatively by severity and frequency of occurrence of delay factors. This study assigns four main delay factors to the first level: main contractor, utility, regulatory authority, and financial and country factor. The second and the third levels are designed with 12 sub-factors and 32 sub-sub-factors, respectively. This study finds the top five most important sub-sub-factors, which are as follows: policy changes, political instability and public intervention; uncompromising regulatory criteria and licensing documents conflicting with existing regulations; robust design document review procedures; redesign due to errors in design and design changes; and worldwide shortage of qualified and experienced nuclear specific equipment manufacturers. The proposed combined AHP-RII methodology is capable of assessing delay risk effectively and efficiently. Decision makers can apply risk informed decision making to avoid unexpected construction delays of NPPs.

Risk Factors Influencing the Delays on the Remodeling Construction Works - Focused on Office Building Projects - (리모델링 공사의 공기지연을 야기하는 리스크 요인 - 오피스 건축물을 중심으로 -)

  • Cho, Kyu-Man;Kim, Tae-Hoo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.4
    • /
    • pp.385-394
    • /
    • 2018
  • There have been frequent reports of schedule delays due to various risks of remodeling projects, which are different from new construction. Therefore, this study was carried out to analyze the risk factors inherent in the remodeling project and the likelihood of schedule delay occurrence in the remodeling construction work. To analyze the relationship between the risk factors and the likelihood of schedule delays of remodeling projects, (1) a prototype of the office building remodeling work was developed through the analysis of existing case and literature, (2) a questionnaire survey was conducted on 29 construction managers who have been or are currently conducting remodeling projects, and (3) after evaluating the reliability of the collected questionnaire results, the relationship between the two elements, which denotes (i) likelihood of schedule delays per each work, (ii) importance of risk factors, and (iii) risk factors affecting schedule delay in remodeling work, was suggested. Using the results of this study, it is expected to develop a plan for preventing the schedule delay of the office building remodeling work through control the risk factors that may cause schedule delays.

Effect of Office Building Remodeling Project Characteristics on the Occurrence of Schedule Delay Risk Factors (오피스 리모델링 프로젝트 특성에 따른 공기지연 리스크 발생 영향도)

  • Cho, Kyuman;Kim, Taehoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.22-31
    • /
    • 2018
  • Due to the inherent risk factors of the remodeling projects, the remodeling project is failing frequently, and schedule delay are occurring in most remodeling projects. The risk factors that cause the delays in these remodeling projects are not common to all remodeling projects, and the likelihood of risk factors will be affected by the various characteristics of the project. In this context, based on the results of a reliable survey conducted on 29 construction managers who have performed remodeling projects, this research analyzes (1) "importance of each characteristic", which means how frequently the characteristics of the remodeling project affect the occurrence of risk factors, (2) "the likelihood of delay risk factors for remodeling projects", which assesses which risk factors are most likely to occur, and 3) "the level of effect of project characteristics that affects the occurrence of each risk factor." Through this study, the relationship between various characteristics of the office building remodeling projects and the delay risk factors was analyzed in various aspects, in further, it is expected that the owner planning the remodeling will be able to grasp the delay risk that is likely to occur according to the characteristics of the project in advance.

An Analysis of The Critical Risk Factors in Failure Cases of Lifting Equipment Plans in High-rise Construction Project (초고층 프로젝트 양중 계획의 실패 유형별 핵심 리스크 요인 분석)

  • Kim, Nam-Gyun;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.73-83
    • /
    • 2013
  • Recently, not only around Korea but also other countries shows a pattern of arising high-rise building construction project which was delayed or aborted during global economic crises and recession. Although the market starts to stretch, It is getting competitive to win a contract in high-rise construction project between contractors due to lack of competitive advantage especially to Korea contractors. To get that, Korean contractors needs lifting equipment plan. But currently, they depend on the empirical methods and that cause schedule delay, not controlled cost management problem. Therefore, this research is to improve the accuracy of Lifting plan by analyzing the current issues of Lifting plan system and deducing the types of failures with planning factors, as well as analyzing the impact on schedule and cost control and safety management by each failure mode. Also, by analyzing detail risk factors per Lifting Equipment with FMEA, to infer the critical risk factor on high-rise construction project.

A Case Study of Delay Analysis for E.P.B Shield TBM Method in Construction Site (E.P.B(Earth Pressure Balance) Shield TBM 공사의 공기지연 사례연구)

  • Kwak, Jun-Hwan;Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.6D
    • /
    • pp.737-743
    • /
    • 2009
  • Shield TBM, since it was employed for Suyoungman Bay riverbed tunnel of Busan Subway in 2000,has been increasingly adopted in Korea, and in line with growing popularity, the study on Shield TBM has been expanded. However the studies mostly focus on ground condition in a bid to estimate the advancement rate and develop the model for calculating the excavation efficiency, whereas the efforts to analyze the cause of delay and to develop the improvement measures have been neglected. Thus the studies were mostly intended to analyze the schedule slippage focusing on ground conditions, while the study on schedule behind due to equipment itself and related facilities have yet to be attempted in earnest. This study hence was aimed at evaluating the troubles and schedule slippage caused by mechanical elements such as shield TBM equipment and tools and ground conditions, making use of FMEA approach so as to analyze the risk of schedule delay by such elements, thereby proposing the preventive measures to deal with high-risk factors. So, this study suggest the solution to highly ranked trouble factor for the purpose of enhance the efficiency on Shield TBM.

Development of Measurement and Evaluation Process for Risk-based Configuration Factors in Mixed Used Development in Urban Regeneration Projects (복합용도 도시재생사업에서의 리스크 기반 변화요인 측정 및 평가 프로세스 개발)

  • Son, Myung-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.94-106
    • /
    • 2012
  • In recent years, the risks and uncertainties associated with mixed used development in urban regeneration projects which have actively been implemented at home and abroad have been on the rise due to the uncertainties of the initial business plan, difficulty of financing, increase in total cost and schedule delay. To cope with rapid social and economic changes and optimize benefits, a risk-based configuration management process that considers life cycle is required, along with accurate planning in the early stage of the business. In addition, it is necessary to prepare measures that can respond to the evaluation and measurement of the configuration factors in relation to the business process. However, the focus of previous studies on configuration management in the field of construction was mainly on humanities and the sociological aspects such as organization, leadership, ideology and similar concepts. There has been limited research on the process and measurement and evaluation methods for configuration factors required in decision-making on the risks and changes that can occur in the actual project implementation phase. Accordingly, in this study, we defined risk-based configuration factors and developed a process and MECA/3DAM/CII methodology to measure and evaluate these factors so as to carry out systematic configuration management of mixed used development in urban regeneration projects.