• Title/Summary/Keyword: Sampling inspection

Search Result 202, Processing Time 0.023 seconds

Development of Reliability Acceptance Sampling Plan for the Exponential Lifetime Distribution under Periodic Inspection and Type I Censoring (수명이 지수분포를 따를 때 정기검사 및 정시종결하에서 신뢰성 샘플링검사계획의 개발)

  • 서순근;김갑석
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.21 no.1
    • /
    • pp.115-129
    • /
    • 1996
  • A reliability Acceptance Sampling Plan (RASP) is developed for testing the exponential mean lifetime under the periodic (i. e., equally-spaced) inspection and Type I censoring. Under the periodic inspection, the exact sampling distribution of maximum likelihood (ML) estimator of mean can not be derived. Hence sample size and acceptance criterion are determined by the algorithm proposed on the basis of Monte Carlo simulation such that the producer's and consumer's risks are satisfied for given censoring time and number of inspections. In addition, the developed RASP is compared in terms of sampling size, OC curve, and expected completion time. The effects for the RASP by the chosen inspection scheme are also discussed.

  • PDF

A Modified Single Sampling Plan for the Inspection of Attribute Quality Characteristics

  • Subramani, J.;Balamurali, S.
    • Industrial Engineering and Management Systems
    • /
    • v.15 no.1
    • /
    • pp.41-48
    • /
    • 2016
  • In this manuscript, a modified single sampling plan is proposed for the inspection of products in which the nonconforming items can be classified in to two categories namely critical and non-critical; and explained with the help of industrial example. The operating procedure of this plan is also proposed and the performance measures such as the probability of acceptance, average sample number, average total inspection and average out going quality are also derived. The optimal parameters are determined which will have minimum sample size. The efficiency of the proposed plan is also discussed over the conventional single sampling plan. The extensive tables for selecting a modified single sampling plan based on AQL and LQL are provided for both Binomial and Poisson distributions and explained with the help of industrial data.

A comparison of three-types of multi-level skip-lot (3종류의 다단계 스깊-로트 샘플링 검사계획의 비교)

  • 최병철;강찬기
    • The Korean Journal of Applied Statistics
    • /
    • v.10 no.2
    • /
    • pp.375-384
    • /
    • 1997
  • In this paper, chain-shaped multi-level skip-lot sampling plan is designed, which is a normal inspection plan between Choi(1993)'s tightened inspection plan and Choi(1995)'s reduced inspection plan. In every skipping inspection of the proposed plan, when designed numbers of consecutively inspected lots are accepted, switch to the next skipping inspection, and when a lot is rejected, switch to the skipping inspection of two-level lower. Also, the formulae of the operating chareacteristic function, average sampling number and average outgoing quality for the proposed skip-lot sampling plan are derived using the morkov chain approach and their properties are studied and graphically compared with those of the other multi-level skip-lot sampling plans.

  • PDF

Sampling Inspection Plans for Defect

  • Jeong, Jeong-Im;Cho, Gyo-Young
    • Journal of the Korean Data and Information Science Society
    • /
    • v.15 no.4
    • /
    • pp.867-877
    • /
    • 2004
  • The sequential sampling inspection method is an extension of the multiple-sampling methods, and its theory is based on the sequential probability ratio test (SPRT) of Wald. In this paper, the characteristics of SPRT for testing the number of defects are approximated by using the estimated excess over the boundaries. The use of the estimated excess shows good performances in estimating the operating characteristic function and the average sample number of SPRT compared to the method by neglecting the excess. It also makes it possible to determine the boundary values which satisfy the desired error probabilities.

  • PDF

Multi-level skip-lot sampling plan (다단계 스?로트 샘플링검사 계획)

  • 최병철
    • The Korean Journal of Applied Statistics
    • /
    • v.6 no.2
    • /
    • pp.277-287
    • /
    • 1993
  • This paper is a generalization of single- and two-level skip-lot sampling plans to n-level, which can considerably reduce inspection cost when the level of submitted quality is high. In every skipping inspection of the generalized sampling plan, not only skipping parameters but also inspection fractions can be freely choosed. The general formula of the operating characteristic function for the n-level skip-lot sampling plan is derived. Also the operating characteristic curves of a reference plan, two-level and three-level skip-lot sampling plans are compared.

  • PDF

Economic Sampling Inspection Plan for Markov Dependent Production Processes (Markov 종속(從屬) 생산(生産) 공정(工程)에서의 경제적(經濟的) 샘플링 검사(檢査) 계획(計劃))

  • Yu, Jeong-Sang;Hwang, Ui-Cheol
    • Journal of Korean Society for Quality Management
    • /
    • v.21 no.1
    • /
    • pp.65-77
    • /
    • 1993
  • Often in a production process, the quality of items is serially dependent. We assume that the quality of items is an attribute which can be classified as good or bad with a Markovian dependence structure. In order to determine sampling inspection plan characteristics such as total inspection cost and average outgoing quality, we design an economic model and illustrate an efficient procedure for design of best inspection plan using graphs based on numerical calculations.

  • PDF

Determination of Sampling Points Based on Curvature distribution (곡률 기반의 측정점 결정 알고리즘 개발)

  • 박현풍;손석배;이관행
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2000.11a
    • /
    • pp.295-298
    • /
    • 2000
  • In this research, a novel sampling strategy for a CMM to inspect freeform surfaces is proposed. Unlike primitive surfaces, it is not easy to determine the number of sampling points and their locations for inspecting freeform surfaces. Since a CMM operates with slower speed in measurement than optical measuring devices, it is important to optimize the number and the locations of sampling points in the inspection process. When a complete inspection of a surface is required, it becomes more critical. Among various factors to cause shape errors of a final product, curvature characteristic is essential due to its effect such as stair-step errors in rapid prototyping and interpolation errors in NC tool paths generation. Shape errors are defined in terms of the average and standard deviation of differences between an original model and a produced part. Proposed algorithms determine the locations of sampling points by analyzing curvature distribution of a given surface. Based on the curvature distribution, a surface area is divided into several sub-areas. In each sub-area, sampling points are located as further as possible. The optimal number of sub-areas. In each sub-area, sampling points are located as further as possible. The optimal number os sub-areas is determined by estimating the average of curvatures. Finally, the proposed method is applied to several surfaces that have shape errors for verification.

  • PDF

Operating Characteristic Properties of Two Types of Multi-Level Skip-Lot Sampling Plans

  • Byoung-Chul Choi
    • Communications for Statistical Applications and Methods
    • /
    • v.2 no.2
    • /
    • pp.358-365
    • /
    • 1995
  • This paper presents another system of multi-level skip-lot sampling plan, which can directly retum to normal inspection from any skpping inspection level when a sudden shift for the worse in the process mean occurs. All the other properties of the proposed sampling plan are similar to those of the Choi's(1993) plan. The formula of the poerating characteristic function for the proposed n-level skip-lot sampling plan is derived. Sone poerating characteristic properties for the proposed plan are graphically compared with those of the Choi's plan.

  • PDF

A Design of Sampling Inspection Plan for Single Manufacturing Production Process (제조생산공정의 경제적 샘플링 검사방식 설계)

  • 서경범;박명규
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.21 no.48
    • /
    • pp.269-277
    • /
    • 1998
  • In this study, a traditional concept of sampling inspection plan for the quality assurance system is extended to a consideration of economic aspects in total production system by representing and analyzing the effects between proceding/succeeding production process including inspection. This approach recognizes that the decision to be made at one manufacturing process (or assembly process) determine not only the cost and the average outgoing quality level of that process but also the input parameters of the cost and the incoming quality to the succeeding process. By analyzing the effects of the average incoming and outgoing quality, manufacturing/assembly quality level and sampling inspection plan on the production system, mathematical models and solution technique to minimize the total production cost for a single product manufacturing system with specified average outgoing quality limit (AOQL) are suggested.

  • PDF

A Design of Economic Sampling Inspection Plan for Production Process with AOQL Constraint (AOQL제약하 생산공정의 경제적 샘플링검사방식 설계)

  • 박명규
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.21 no.46
    • /
    • pp.119-125
    • /
    • 1998
  • In this study, a traditional concept of sampling inspection plan for the quality assurance system is extended to a consideration of economic aspects in total production system by representing and analyzing the effects between proceeding / succeeding production process including inspection. This approach recognizes that the decision to be made at one manufacturing process (or assembly process) determine not only the cost and the average outgoing quality level of that process but also the input parameters of the cost and the incoming quality to the succeeding process. By analyzing the effects of the average incoming and outgoing quality, manufacturing / assembly quality level and sampling inspection plan on the production system, mathematical models and solution technique to minimize the total production cost for a single product manufacturing system with specified average outgoing quality limit(AOQL) are suggested.

  • PDF