• Title/Summary/Keyword: Sale cost

Search Result 150, Processing Time 0.029 seconds

The PHC-Pile Cost Effect on Sale Price for Multi-Family Housing (PHC-pile 공사비가 공동주택 분양가에 미치는 영향)

  • Cha, Yongwoon;Park, Taeil;Park, Wonyoung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.11
    • /
    • pp.94-101
    • /
    • 2020
  • This study examined the effect of the sale price by excluding the PHC-pile cost from the construction costs for basic type (CCsBT) as an additional cost. The Ministry of Land, Infrastructure, and Transport excluded the PHC-pile cost in the CCsBT and new method so that only the designed pile quantity was recognized as an additional cost. The effect on the sale price was analyzed by comparing the pile cost of the existing and new methods. For this purpose, seven cases were selected, and the PHC-pile cost was estimated. The existing method was estimated as the ratio of the pile cost to CCsBT. The new method was estimated based on the bill of quantity. As a result, the CCsBT decreased by approximately 2-3% when the PHC-pile cost was calculated in the new method. Furthermore, as a result of comparing the sale price, excluding the PHC-pile cost with the sale price, the CCsBT decreased by approximately 1%. These results are expected to help improve the understanding of the CCsBT. Also, this paper contributes to promoting national housing stability through institutional improvement.

Modeling and Analysis of Warranty Cost for 2D-Policies Associated with Sale of Second-hand Products

  • Chattopadhyay G.;Yun Won-Young
    • International Journal of Reliability and Applications
    • /
    • v.7 no.1
    • /
    • pp.71-77
    • /
    • 2006
  • The market for second hand products has been growing for a variety of reasons (e.g., new products appearing at a faster rate and the expected life of products increasing due to rapid advances in technology). The demand for warranties for second-hand products has been growing along with the growth of the market for second-hand products. Warranty for new products (consumer durables, industrial and commercial, and specialized defense products) has received a lot of attention. In contrast, warranties for second-hand product have received very little attention. Often, dealers of second-hand product such as cars offer 2D-warranties (Year and Kilometers). The expected warranty cost associated with a second-hand product for 2D-Policies is a function of the age of the item and its usage (as it affects failures over the warranty period), the warranty terms and the servicing strategy used by the dealer. This paper deals with development of models for warranty cost analysis along with the decision on sale price and warranty cover for 2D-Warranty policies associated with sale of second-hand products.

  • PDF

Heat-Electric Power Ratio Optimization To Maximize Profit of a Cogeneration Power Plant (열병합 발전기 수익 극대화를 위한 열전비 최적화)

  • Kim, Gun-Hoe;Lee, Jae-Heon;Moon, Seung-Jae;Chang, Taek-Soon
    • 한국전산유체공학회:학술대회논문집
    • /
    • 2008.03b
    • /
    • pp.381-384
    • /
    • 2008
  • This paper presents an operational technique to maximize profit of a cogeneration power plant. To minimize errors in a loss and gain analysis of a cogeneration power plant, the energy sale profit in the cost-based-pool electric power trade market, the heat sale profit, and the supplementary fund profit for electric power industry are taken into consideration. The objective is to optimize the heat-electric power ratio to maximize profit of a cogeneration power plant. Furthermore, the constrained bidding technique to optimize heat-electric power ratiocan be obtained. Profits from of a cogeneration power plant are composed of three categories, such as the energy sale profit in the cost-based-pool electric power trade market, the heat sale profit, and the supplementary fund profit for electric power industry. Profits of a cogeneration power plant are varied enormously by the operation modes. The profits are mainly determined by the amount of constrained heat generation in each trading time. And the three profit categories arecoupled tightly via the heat-electric power ratio. The result of this case study can be used as a reference to a cogeneration power plant under the power trading system considered in this case.

  • PDF

Apartment "A sale in lots price upper limit system","Basic building cost" policy-How the governmental apartment policy is changing? (아파트 "분양가 상한제"."기본형 건축비" 산정 시행 정책-정부 아파트정책 어떻게 달라지나? VS 건설업계의 아파트사업은 어떻게?)

  • Jeong, Mu-Yong
    • Journal of the Korean Professional Engineers Association
    • /
    • v.40 no.5
    • /
    • pp.73-78
    • /
    • 2007
  • The apartment sale in lots price upper limit system was propelled from this month for stabilization of the residential policy that will lower the apartment sale in lots price. the private constructive industry presents how make activated the apartment enterprise, presents what kind of problems it has and points the complementary problems when the government enforcing it.

  • PDF

A Trend Analysis of Small Type House Construction Cost in Multi-Family Housing (공동주택 소형평형 공사비 트렌트 분석)

  • Park, Wonyoung;Cha, Yongwoon;Park, Taeil
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.261-262
    • /
    • 2021
  • Increasing construction costs are required due to increasing the supply of small type houses with changes in multi-family housing trends. However, a sharp rise in the construction cost of small type houses can raise the sale price, threatening the stability of national housing. Therefore, this study aims to estimate the change in the construction cost of small type houses from the basic construction cost of the sale price ceiling system and suggest an improvement plan.

  • PDF

Analysis of Operational Economic Efficiency in a Cogeneration Power Plant (열병합 발전소의 운전경제성 분석에 관한 연구)

  • Kim, Gun-Hoe;Hur, Jin-Huek;Moon, Seung-Jae;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.5 no.1
    • /
    • pp.40-44
    • /
    • 2009
  • This study presents an operational technique to maximize the profit of a cogeneration power plant under cost-based pool power market. In benefit side energy sale profit, heat sale profit, and supplementary fund profit for electric power industry are included and the changeable cost was considered in cost side. The profit of a cogeneration power plant is varied enormously by the operation conditions, and constraint conditions. The result of this case study can be used as a reference to a cogeneration power plant under the same power trading system.

  • PDF

An Economic Analysis of the Hydrogen Station Enterprise Considering Dynamic Utilization (동적 이용률을 고려한 수소충전소 사업의 경제성 분석)

  • GIM, BONGJIN
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.28 no.1
    • /
    • pp.47-55
    • /
    • 2017
  • This paper deals with the after-tax economic feasibility analysis of the hydrogen fueling station considering dynamic utilization. We selected an off-site hydrogen station in which the hydrogen is supplied by a central by-product hydrogen plant as a case study. Also, we made some sensitivity analysis by changing input factors such as the discount rate, the hydrogen station construction cost, the hydrogen demand and the hydrogen sale price. As a result, the hydrogen station will not be economical in 2020 due to the relatively high price of the hydrogen station construction cost and the low price of hydrogen sale price. In order to realize the economic feasibility of the hydrogen station in the early stage of the hydrogen economy, the subsidies on the annual operating cost as well as the construction cost are needed.

A study of the decision to standardize sale price of supplying apartment houses using Analytic Hierarchy Process (AHP기법을 이용한 공동주택 분양가 결정에 관한연구)

  • Hwang, Kyu-Sung;Lee, Chan-Ho
    • Journal of Digital Convergence
    • /
    • v.14 no.1
    • /
    • pp.121-129
    • /
    • 2016
  • The purpose of this study is to set a standard for sale prices of supplying apartment houses about decision factors in sale price of supplying apartment houses using Analytic Hierarchy Process. This is done by modeling decision factors in sale price of supplying apartment houses as hierarchy. According to the modeled hierarchy, the relative importance of supplying factors are determined using a survey of a group of real estate experts. In addition, through Analytic Hierarchy Process, the relative importance of phased sale prices of supplying apartment is analyzed in order to set a standard to estimate competitive sale prices of newly supplying apartment houses.

Smart and Secure Point of Sale Framework with Threat Modeling and Formal Verification

  • Mona faraj Nasser alwahabi;Shaik Shakeel Ahamad
    • International Journal of Computer Science & Network Security
    • /
    • v.24 no.6
    • /
    • pp.41-48
    • /
    • 2024
  • Existing PoS (Point of Sale) based payment frameworks are vulnerable as the Payment Application's integrity in the smart phone and PoS are compromised, vulnerable to reverse engineering attacks. In addition to these existing PoS (Point of Sale) based payment frameworks do not perform point-to-point encryption and do not ensure communication security. We propose a Smart and Secure PoS (SSPoS) Framework which overcomes these attacks. Our proposed SSPoS framework ensures point-to-point encryption (P2PE), Application hardening and Application wrapping. SSPoS framework overcomes repackaging attacks. SSPoS framework has very less communication and computation cost. SSPoS framework also addresses Heartbleed vulnerability. SSPoS protocol is successfully verified using Burrows-Abadi-Needham (BAN) logic, so it ensures all the security properties. SSPoS is threat modeled and implemented successfully.

A Study of the Decision to Standardize Sale Price Model of Supplying Apartment Houses (공동주택 분양가 결정모형에 관한 연구)

  • Hwang, Kyu-Sung;Lee, Chan-Ho
    • Journal of Digital Convergence
    • /
    • v.15 no.1
    • /
    • pp.181-189
    • /
    • 2017
  • The purpose of this research is to set a standard for deciding competitive marketing prices of new supplying apartment houses and to analyze decision factors in sale price of supplying apartment houses with Analytic Hierarchy Process; the resulted model does not use the method that joins the land cost and the cost of construction together, but the method that compares the sales prices of surrounding apartments. This research tries to set a standard for decision of the prices of newly supplying apartment houses by classifying the determinants into the $1^{st}$ step(4 factors), the $2^{nd}$ step(9 factors), and the $3^{rd}$ step(25 factors). According to the process, the relative importance of decision factors in the sale prices is determined and this should be used as the index of sale prices for newly supplying apartment houses when the houses are provided. In addition, through the $2^{nd}$ step including 9 factors, the comparative model for sale prices is defined and the model is presented to be applied in the real business. Subsequent study additionally considering the factors apart from marketing which tries to find a generalized standard needs to be conducted.