Ko, Jun Bok;Seo, Min Kyo;Lee, Kyeong Ho;Baek, Ki Bong;Cho, Seung Hwan
Transactions of the Korean Society of Mechanical Engineers A
/
v.38
no.12
/
pp.1359-1365
/
2014
In this study, 1-way fluid structure interaction analysis(FSI) for the shutter, component of side jet thruster was performed to evaluate the safety. Driving torque to open nozzle, thermal and high pressure load of hot gas was applied to shutter. Thus, the shutter must be designed to endure this load during combustion. We carried out computational fluid dynamics analysis to obtain the pressure, temperature, and heat transfer coefficient of hot gas of side jet thruster. We then used the data as the load condition for a thermal structural analysis using a mapping method. The locations with the maximum stress and temperature distributions were found. We compared the maximum stress with the tensile stress of shutter material according to temperature to evaluate the safety. We also analyzed the radial deformation of the shutter to set the proper interface gap with the side jet thruster parts.
International Journal of Internet, Broadcasting and Communication
/
v.14
no.3
/
pp.182-192
/
2022
This study analyzed the effects of the all-in-one automatic fire shutter (hereinafter referred to as "all-in-one shutter") installed along the fire compartment in a five-story high school building on the evacuation time by using the Pathfinder simulation program. When the all-in-one shutter was added as a new variable, the evacuation time was delayed, indicating insufficient evacuation safety. The evacuation time exceeded the appropriate standard when the evacuation exit was designated to the students in the present state of being placed on the 2nd, 3rd, and 4th floors and the all-in-one shutter was activated. When students were placed on the 1st, 2nd and 3rd floors under the same conditions, the evacuation time was also greatly exceeded. However, when the width of the entrance was set to 130cm, the evacuation time was almost the same as when the all-in-one shutter was not installed. In high-rise school buildings, the bottleneck caused by all-in-one shutters is becoming a major factor in evacuation barriers. To ensure the evacuation safety of school buildings, it has been judged that evacuation education and training to predict the evacuation time required through the all-in-one shutter entrance and induce an evacuation procedure suitable for the standard evacuation time should be carried out in parallel. The implications of this study and suggestions for effective fire compartments and follow-up studies were discussed.
Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
/
2006.05a
/
pp.264-267
/
2006
This paper describes the accident analysis by modeling the current transformer mounting in meaium voltage metal-clad switchgear(MCSG). In analyzing the accident the reconstruction at the current transformer mounting(VCB connecting guide) has to be taken into account. The accident was modelled as a 3-phase ground fault mounting between the end plate of a high voltage lines and the safety shutter at the current transformer mounting of the VCB inside the metal clad switchgear. Since the outside maintenance of the metal clad switchgear is restricted by the enclosed compartments, its circumference has to be kept clean. Through the reconstruction results, it was confirmed that the fault of the enclosed switchboard could be reduced when the shutter made of Fe material was changed into an insulation.
Proceedings of the Korean Institute of Building Construction Conference
/
2021.05a
/
pp.295-296
/
2021
With the recent diversification and complication of buildings, the functions of building are also developing. As much as the development of buildings, the machine or equipment used for them is also developing. Thus, all sorts of domestic/foreign industrial facilities and fire stations in the whole nation are using the electric shutter that could meet the insulation just like the exterior wall of general buildings, for bringing-in/storage and crime prevention/fire prevention. Currently, various types of electric shutters are used. Such wrong operation and poor management are causing many panel-falling accidents. This study researched the reduction of electric shutter panel-falling risk by reviewing the domestic/foreign laws and standards, and researching the new safety equipment. First, the causes for falling and accident types were drawn by analyzing the cases of electric shutter accidents. After that, a checklist as the measures for reducing the falling of electric shutter in building was suggested by analyzing the items for the inspection of electric shutter.
This study analyzed the working conditions and problems of screen fire shutters in the Goyang Bus Terminal fire based on the fire investigation results. At that time, screen fire shutters in the 1st basement, which was under construction, did not work because the power was shut off. Four screen fire shutters in the 1st and 3rd floor did not work despite the power not being shut off. The following problems related to a screen fire shutter were found: shutting off the power to screen fire shutters for the fire compartment on each floor, even when the fire compartments were changed in each area; installing an integral type screen fire shutter without any regulations, installing a two-stage screen fire shutter in a place not related to obstacles during evacuation; stopping the function of the screen fire shutters for a fire compartment on each floor after a combustible sandwich panel was comparted; installing a screen fire shutter over 10 meters in width, in which its performance was not verified; and no safety control standards for reinstalling or maintaining a screen fire shutter.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.55
no.2
/
pp.110-114
/
2006
This paper describes the accident analysis by modelling the current transformer mounting in a metal-clad switchgear at 22.9kV. In analyzing the accident, the reconstruction at the current transformer mounting(VCB connecting guide) has to be taken into account. The accident was modelled as a 3-phase ground fault occurring between the end plate of 22.9kV lines and the safety shutter at the current transformer mounting of the VCB inside the metal clad switchgear. Since the outside maintenance of the metal clad switchgear is restricted by the enclosed compartments, Its circumference has to be kept clean. Through the reconstruction results, it was confirmed that the fault of the enclosed switchboard could be reduced when the shutter made of Fe material was chanted into an insulation.
Integral fire shutters are installed indiscriminately, regardless of evacuation. There is always the risk of an accident because integral shutters are applied mainly to corridors, passages, and stairs of schools This study evaluated the problem of integral shutter's entrance, evacuation, construction management, and maintenance control through a fire shutter accident case, including present condition of fire shutter installed at school of Okgil, Bucheon and Dongtan, Hwaseong. The results suggest that emergency lighting or signs for passage be set up to check location of entrance easily and install obstruction sensors at fire shutter to reduce life damage. In addition, the number of efficiency tests of fire shutters should be increased by running a trial test monthly or weekly to maintain the performance of fire shutter. Schools need to install a fire shutter- applied sprinkler at the entire floor.
Four fire scenarios, as the cases of fire sizes of 2 MW and 5 MW, and no installation and activation of atrium fire shutter for dormitory building of Daegu 'D college', were developed and fire simulations were run using FDS (ver. 5.5.0) and Pathfinder 2009 programs. By assessing fire and evacuation, the effects of atrium fire shutter and vents on the smoke control of atrium were evaluated and this study also analyzed fire hazard and egress safety for occupants in the dormitory. Fire shutter's preventing smoke transport around atrium was much effective, but smoke layer descended down the design limit of smoke height and kept about 2 m height from the atrium floor in all cases because flow rate through vents was not enough. For the case of 5 MW fire and no fire shutter, fire hazard was higher due to visibility than temperature and allowable egress time to stairwell was short less than 5 seconds for the occupants on the floors of 4F to 7F. For total occupants, egress time out of main doorway was calculated about 136 seconds. It is sure that additional systems improving the performance of smoke control need to be installed for more safe evacuation.
Proceedings of the Korea Institute of Fire Science and Engineering Conference
/
1997.11a
/
pp.345-352
/
1997
We could analyse the fire behavior using the developed software for fire safety assessment in a large space such as atrium. But Korean building law hasn't admitted the result of fire risk assessment in atrium. In the legislation fire resistant wall or shutter must be required between atrium and office rooms, That has obstructed development of building design and fire protection technique in Korea. From this point of view, we made scenarios of fire spread between atrium and office rooms, and then computed fire spread and fire phenomena using FASTLite and Breakl. In this study, we can decide that fire compartmentalization between atrium and office rooms doesn't require in Atrium building if the material and fire protection system were reliable. Consequently, Korean Fire Protection Regulations have to consider in direction of increasing freedom of building.
Wood pellet is one of biomass energy fuels, which is produced by compressing woody biomass such as sawdust, planer shavings, and whole-tree removal or tree tops and branches leftover after logging into cylindrical form. Latterly much attention has been paid to wood pellet boiler which is suitable for use at various scales in domestic and industrial furnaces for heat production to replace conventional fossil fuel energy sources since the use of wood pellet that is carbon neutral can alleviate global warming. This study presents the result of developing a high efficiency wood pellet boiler with 55MJ/h capacity. Efficiency has been improved by using a rotating disk burner with a shorter screw feeder. Special attention has been paid to the improvement of the safety of the wood pellet boiler from backfire by adopting a double protecting system composed of a shutter and an air curtain. The result shows that the efficiencies of the wood pellet boiler are 97.2% and 89.2% based on lower and higher heating values, respectively, at 15.1kW of heating output.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.