• Title/Summary/Keyword: Safety Secure

Search Result 1,404, Processing Time 0.311 seconds

Evaluation on Allowable Vehicle Speed Based on Safety of Track and Railway Bridge (궤도 및 교량 안전성을 고려한 열차 증속가능 속도대역 평가)

  • Bahng, Eun Young
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.2
    • /
    • pp.145-151
    • /
    • 2018
  • In this study, the track-bridge interaction analysis was performed using an analytical model considering the track structure, thereby taking into account the linear conditions (R=650 m, cant variation $160{\pm}60mm$) and the dynamic characteristics of the bridge. As a result of the study, the allowable speed on the example bridge considered was calculated at 200 km/h based on vertical deflection, vertical acceleration, and irregularity in longitudinal level, but was also evaluated at 170km/h based on the coefficient of derailment, wheel load reduction, and lateral displacement of the rail head. It is considered desirable to set the speed 170km/h to the speed limit in order to secure the safety of both the bridge and the track. It is judged that there will be no problems with ensuring rail protection and train stability in the speed band.

A Fundamental Research to Safety at Tower Crane Major Work (타워크레인 주요 작업의 안전성에 관한 기초 연구)

  • Lee, Sung-Ho;Joo, Jin-Kyu;Lee, Goon-Jae;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.151-152
    • /
    • 2011
  • As recent construction projects aim to build higher and bigger buildings, lifting operation is getting increasingly important in construction sites. Accordingly, as tower cranes get higher and higher, disasters involving tower cranes are also on the rise. According to occupational incident statistics of the Korea Occupational Health & Safety Agency (KOHSA), most of such incidents occur in installation, dismantling and climbing phases of tower crane. Therefore, it is essential to develop preventative measures to secure safety of tower crane operations, with critical focus on installation, dismantling and climbing of tower crane. Hence, this research attempts to measure criticality of key risk factors in installation, dismantling and climbing phases of tower crane on construction site and propose necessary safety measures. As a result, conclusions herein will contribute to minimize disasters and incidents involving tower cranes in high-rise building construction sites.

  • PDF

The Subcontract Workers Protection Plan Research against a Dangerous Work (위험 작업에 대한 하도급 근로자 보호방안 연구)

  • Kim, Dae-Ho;Kim, Byung-Suk
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2007.11a
    • /
    • pp.85-95
    • /
    • 2007
  • It compared subcontractor with contractor that are wages, the labor hour and labor condition of the work environment back are inferior relative. The subcontractor which basically the contract workers evade the dangerous process or the difficult work, the dirty work back what is called 3D the case which does to keep a business is many. so With life it will be threatened consequent health directly. The possibility where the subcontractor will be exposed to danger work came to be high. Together the reason of subcontract at managing the big business the case which becomes accomplished in objective, about lower the immediacy safety&health problem, subcontractor assigned workers is the actual condition only it could not be deteriorated more in public finance of the supply and enterprise and technical ability insufficiency. Consequently it prevents the subcontract which danger work is insensitive from this research and immediacy of the subcontract workers who is weak hygiene circumstance complement the plan it will be able to secure the immediacy safety&health subcontract workers, substantially to prepare in the hazard subcontract proprietor.

  • PDF

Analysis of Remote Electrical Facilities Safety Checkup for General Use (일반용 전기설비 수용가의 원격전기안전점검 모델 설계 및 요소기술 분석)

  • Yoo, Jae-Geun;Choi, Myeong-Il;Jeon, Jeong-Chay
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.2214-2215
    • /
    • 2008
  • KESCO performed periodical inspection every 1${\sim}$3 years to check the status of maintenance and performance of electric installations for general use (less than 600V in voltage and 75kW in capacity in residential homes) but recently a resident have been avoiding periodical check due to increase of sex crime and empty house, which more and more difficult to secure electrical safety of installation. In order to solve non-inspection problems and improve efficiency of inspection, this paper introduce the model of remote monitoring system that check electrical facilites for general use and we are developing remote monitoring device for reliability test.

  • PDF

A Study on the Impact to Safety Management and the Prevention Measure by the Speedy Construction Work (돌관공사가 안전관리에 미치는 영향 및 예방대책에 관한 연구)

  • Ha, Haeng-Bong;Bang, Myung-Seok;Lim, Kyu-Won
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2013.04a
    • /
    • pp.243-254
    • /
    • 2013
  • Recently in the construction business construction companies has been ordered to survive in the terriblly competitive environment. Aa a result, most of the project with low-priced contract needs a speedy progress during all construction period. For the last five years major incident frequently occurs and results in the death of 189 workers at major top 6 construction builders. In most recent 10 years, the cause of major incidents happened in construction company is the speedy construction work that is affecting on the safety management. To prevent these accidents in the speedy construction work, four factors were chosed and analysed such as the personnel/organization, the working budget, the subcontractor selection and the employee motivation. The head office taked the support plan and tested it at the pilot work site. It showed a reduced accident and the harmful factors can be eliminated. It should be able to apply to the field to secure safety and prevent accidents.

  • PDF

Development of a regulatory framework for risk-informed decision making

  • Jang, Dong Ju;Shim, Hyung Jin
    • Nuclear Engineering and Technology
    • /
    • v.52 no.1
    • /
    • pp.69-77
    • /
    • 2020
  • After the Fukushima Daiichi accidents, public concerns on nuclear safety and the corresponding burden of nuclear power plant licensees are increasing. In order to secure public trust and enhance the rationality of current safety regulation, we develop a risk-informed decision making (RIDM) framework for the Korean regulatory body. By analyzing all the regulatory activities for nuclear power plants in Korea, eight action items are selected for RIDM implementation, with appropriate procedures developed for each. For two items in particular - the accident sequence precursor analysis (ASPA) and the significance determination process (SDP) - two customized risk evaluation software has been developed for field inspectors and probabilistic safety assessment experts, respectively. The effectiveness of the proposed RIDM framework is demonstrated by applying the ASPA procedure to 35 unplanned scrams and the SDP to 24 findings from periodic inspections.

The Variation of Slope Stability by Ground Water Level in Railway Lines (지하수위에 따른 철도사면의 안정성 변화)

  • Kim, Hyun-Ki;Shin, Min-Ho;Shin, Ji-Soo
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.789-795
    • /
    • 2008
  • Slope stability is affected by various factors. For safety management of slopes, monitoring systems have been widely constructed along railway lines. The representative data from the systems are variations of ground profile such like ground water level and pore water pressure etc. and direct displacement measured by ground clinometer and tension wire sensor. Slopes are mainly effected by rainfall and rainfall causes the decrease of factor of safety(FOS). Because FOS varies linearly by the variation of ground water level and pore pressure, it has a weak point that could not define the time and proper warning sign to secure the safety of the train. In this study, alternative of FOS such as reliability index and probability of failure is applied to slope stability analysis introducing the reliability concept. FOS, reliability index, probability of failure and velocity of probability of failure of the slopes by variation of ground water level are investigated for setting up the specification of safety management of slopes. By executing case study of a slope(ILLO-IMSUNGLI), it is showed to be applied to specification of safety management.

  • PDF

A Study of Brake Force Detection Characteristics for Field Operation of ISO Brake Tester (ISO 제동시험기 실증운영을 통한 제동력 검출 특성에 관한 연구)

  • KWON, Kenan;GU, Youngjin;BAE, Jinmin
    • Journal of Auto-vehicle Safety Association
    • /
    • v.10 no.4
    • /
    • pp.13-24
    • /
    • 2018
  • According to DEKRA (a Germany Certification and Inspection Agency)'s accident rate analysis by vehicle defect factor, as a result of analysis of the causes of accidents by flaws, it was found that braking devices accounted for 41%. Defects in the braking system are closely related to the accident, so it is very important to find faulty brking systems to ensure safety. The EU and USA uses ISO brake tester and the Korea is brake teater is first introduse in Japan for vehicle inspection and maintanance. KOTSA introduce the ISO brake tester in order to promote the advanced standardization of the inspection equipment and inspection tecnology, and examined the detection characteristics and applied it to the improvement direction of the brake tester to secure the driving safety.

An Experimental Study on the Safety Standard of Electronic Throttle Control System (전자식 가속제어장치 안전기준에 대한 실험적 고찰)

  • Yun, Kyungcheol;Yong, Geejoong
    • Journal of Auto-vehicle Safety Association
    • /
    • v.11 no.1
    • /
    • pp.48-54
    • /
    • 2019
  • Optimal engine control is needed to cope with the global environmental regulations that are globally enforced. For optimum engine control, the electronic throttle control system (ETCS) is a prerequisite. Automotive makers are having an effect on reducing emissions and improving fuel economy by applying ETCS which is designed to secure stability. The ETCS controls the output of the throttle valve by passing the output value of the accelerator position sensor (APS) to the engine control unit (ECU). In this study, the authors investigated the safety standards of domestic and overseas accelerator control system and tried to understand how the air flow control affects the engine output by replacing the throttle. The authors suggest an improvement proposal of safety standard based on the result of driving evaluation by various modes.

A Study on the Disaster Prevention Design- Based Safety Signs in School Zone

  • Noh, Hwang-Woo;Oh, Chi-Gyu
    • International Journal of Contents
    • /
    • v.13 no.2
    • /
    • pp.50-56
    • /
    • 2017
  • The number of accidents in school zone is decreasing than before with the introduction of strengthening traffic safety policy since January 2011, but the danger still exists. The School zone sign is widely known to have much effect in protecting children from risks of traffic accidents, but design improvement is being demanded to improve a sense of safety and legibility of safety signs in School zone due to the lack of understanding on the safety signs in crosswalk and School zone. This study analyzed differences in shape and color of existing safety signs through a case analysis of traffic developed countries as America, England, Japan, and Germany and suggested improvement plans for drivers to clearly perceive the school zone. For improvement methods, this study suggested the importance of delivering definite and unified warning message for school zone to drivers by using indication sign and caution sign together, and to use yellow, a safety color, and to unify the safety sign into triangle shape that symbolizes warning and caution to conform the international standards. Actual design production and experiment through improvement plans are needed in the future, and it is expected to secure safety of children and to provide international standardization of safety signs in school zone.