Purpose - This thesis is to develop a management plan and checklist by analyzing the prevention of accidents in advance by presenting the management plan for the major causes of railway accidents. Research design, data and methodology - In recent 5 years, we have analyzed the cases of railway accident, presented the management plan for the accident, and made a practical safety checklist focusing on the main measures according to the management plan. Results - The analysis of the cases of near-railway accidents suggests more concrete and practical safety management measures because the similar accidents are continuously occurring due to formal safety management. Conclusions - It is more valuable to apply to the adjacent construction of the railway line by creating a detailed checklist based on cases rather than the existing checklist. This study is written only as a human factor. For future real - time safety management, it is necessary to study more precisely cause analysis and safety equipment as a big data - based safety control system for more systematic safety management.
Laboratory accidents have happened incidently. However, laboratory safety management has been out of concerns for a long time. At last, the Korean government established an act called Establishment of safe environment of laboratories in 2005. To support the act and to establish policies on laboratory safety management,a national-wide survey was conducted for the 74 research organizations sampled and their 201 laboratories. For the survey, a safety management checklist with 114 items grouped into 20 categories was developed By using this checklist, safety expert groups investigated the laboratories and evaluated them on the five-point Likert scale. A statistical analysis was conducted to compare the safety management status between different research organization types and between different research fields. The resultsmanaw that the universities are in significant lower level on safety institution and safety education than the public research organizations and theare poration research organizations. In terms of research field, chemistry/chemical engineering laboratories generallymanaw higher level compared with theaothers. Conversely, biology/life science laboratories marked low levels in a number of checklist items.
Korean Journal of Construction Engineering and Management
/
v.5
no.2
s.18
/
pp.123-135
/
2004
Construction accident have been increasing in despite of safety management activities and education in construction site. This study surveyed safety organization, education, safety management, scheduling, safety checklist with construction firms in order to grasp the actual condition. A improved method is suggested that safety checklist is supplemented with various safety materials and then stored as database. Furthermore, safety checklists are connected and operated with schedule in ender to more efficiently prevent construction accidents.
Journal of the Korea Institute of Building Construction
/
v.23
no.3
/
pp.327-336
/
2023
The focus of this research was to devise a conceptual methodology for drone usage and to assess the viability of safety checklist items specific to drone application in safety oversight. The appraisal was grounded in a focus group interview involving professionals from construction management and safety fields. The proposed process was segmented into four stages: 1) pre-flight phase for flight plan development, 2) drone flight phase for safety condition inspection utilizing checklist items, 3) post-flight phase for visual asset analysis, and 4) documentation and management phase. Furthermore, the research scrutinized the applicability of 32 distinct safety checklist items for drone operations. The primary aim of this investigation was to probe the possible deployment of drones as part of construction safety inspections at work sites. However, it bears mentioning that subsequent research should strive to gather a more extensive sample size through questionnaire surveys, thereby facilitating quantitative analysis. Administering such surveys would yield more comprehensive data compared to a focus group interview, which was constrained by a limited participant count. In summation, this study lays a foundational groundwork for understanding the potential advantages and challenges associated with integrating drones into construction safety management.
Lim, Hyung-Duk;Kawshalya, Mailan Arachchige Don Rajitha;Kim, Sang-Hoon;Oh, Young-Chan;Lee, Ho-Yong;Nam, Ki-Hoon
Journal of the Korean Society of Industry Convergence
/
v.25
no.5
/
pp.811-816
/
2022
Even though continuous management and supervision of reinforcement of policies to safeguard accidents at workplace and work sites were implemented. Accident prevention activities such as inspection and diagnosis are urgently required to induce a preliminary investigation to identify the risk factors for each type of work, before the work task to eliminate risks at the worksites. Since safety inspections at work sites were generally conducted through visual inspections, the results of safety inspections may vary depending on the findings and proficiency of the safety officers. The results of those inspections may have loopholes to prevent potential accidents at work. Therefore, the purpose of this study was to develop a risk identification checklist that can effectively perform safety inspections to prevent accidents at work sites. This study initially analyzed the previously developed accident checklist to identify current complications and issues in safety checklists. Based on the findings of major industrial accidents over the past three years, the relationship between accident, workplace, and work type were analyzed refereeing the safety inspection standards. A risk recognition-checklist was developed to provide basic data on identifying risk factors, and inspection guidance at work sites. To prepare for potential accidents by identifying and taking countermeasures to mitigate the high risk and serious accidents at sites by the guidelines of the checklist. The developed inspection checklist has been practically used by experts at work sites to perform safety inspections, and it has been verified its suitability, and feasibility, to prevent or mitigate workplace accidents, including securing the safety and health of field workers. The role of the developed safety checklist has been considered effective at worksites.
As asbestos-containing buildings are getting older, asbestos deconstruction works are increasing. As a result, accident risks such as falls, cuts, electric shocks, and suffocation are increasing. Existing studies are mostly about health management and institutional policy research and there is little research on work risk. So workplace risk assessments that are easily applicable in the field are required to be applied. Sealing is the first process of asbestos deconstruction and is the first step to ensure worker's safety. Job Safety Analysis(JSA) and Checklist were used to identify the risk factors and to calculate the level of the risk. By comparing the two risk assessment tools, it was figured out that the JSA is appropriate for the initial process and change of work procedure while Checklist is appropriate for repetitive work. Because the sealing process is sort and simple, it is unlikely to cause serious injury. But since the risk of falling and cuts are exist, safety education and supervision are necessary to maintain a safe working environment.
Korean Journal of Construction Engineering and Management
/
v.8
no.2
/
pp.68-74
/
2007
It has been recognized that safety management is activated during the construction phase to prevent accidents and fatalities of workers. However, It is revealed that about 15% of fatal death accidents is caused by the lack of management of planning and design phases. There is a crucial need of assessing safety risk during building design phase. This paper is aimed to develop a safety risk assessment checklist that can be used during building design phase, utilizing the concept of Design for Safety. In doing so, a broad literature survey on safety management of building Process, various safety risk assessment toolboxes being utilized in the HSE and the BAA of UK. The proposed checklist contains the followings: 1) classification structure for safety design on space, element, and trade work 2) hazard risk factor, probability and degree of intensity of accident occurrence, and 3) safety assessment criteria. It is expected that the checklist would be an effective tool of preventing and minimizing fatal accidents of building construction projects.
Proceedings of the Safety Management and Science Conference
/
2008.04a
/
pp.11-18
/
2008
This research modified the checklist used in the universities in USA, England and Korea considering the current situation of Korea, and conducted case studies upon each section of appointed chemical laboratories based on 4M criteria, which stands for Machine, Media, Man and Management. The purpose of the studies is to assess how dangerous the laboratories are and to contribute to prevention of accidentsin the laboratories as well as reducing loss of lives and property. The result of this research found out the harmful and hazardous factors based on the 4M-type checklist and predicted the dangerousness as it multiplies possible frequency by intensity. Protective equipment, safety facilities in laboratories, emergency exit and compressed gas cylinder are found to be more dangerous, so the result shows that it is desirable to improve ventilation, safety facilities and circumstances of the laboratory through the investment.
Jo, Hee-Geun;Song, Min-Yeong;Yoon, Sang-Hoon;Jeong, Sin-Yeong;Kim, Jong-Hwan;Baek, Eun-Hye;Leem, Jungtae
Journal of Korean Medicine Rehabilitation
/
v.28
no.1
/
pp.61-72
/
2018
Objectives The authors propose a new checklist model adapted for safety miniscalpel acupuncture procedure of cervical and lumbar spine. Methods On the basis of available literature and expert opinion, a prototype checklist was developed. The checklist was adapted on the basis of observation of daily practice. Results The checklist has three parts: 1. prevention and management of healthcare associated infections, 2. verification list before and after miniscalpel acupuncture treatment, 3. adverse event monitoring after procedure. We presented a summary checklist based on the above contents. Conclusions We propose the first patient safety checklist for minicalpel acupuncture treatment of cervical and lumbar spine. The checklist will be complemented using further research methodologies.
Proceedings of the Korean Institute of Building Construction Conference
/
2022.04a
/
pp.202-203
/
2022
In this study, focusing on work types of lifting modules and modules assembly in modular construction sites, unit works were defined according to the construction process of each work type, and safety management elements, safety management activities, and key check point were proposed. The results of this study may have somewhat overlapping contents in the construction procedure in order to derive specific safety management activities and check point for each unit work. Therefore, there is a limit to use the results in an actual modular construction site. In future research, we plan to improve this part and derive a checklist that considers field usability.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.