As asbestos-containing buildings are getting older, asbestos deconstruction works are increasing. As a result, accident risks such as falls, cuts, electric shocks, and suffocation are increasing. Existing studies are mostly about health management and institutional policy research and there is little research on work risk. So workplace risk assessments that are easily applicable in the field are required to be applied. Sealing is the first process of asbestos deconstruction and is the first step to ensure worker's safety. Job Safety Analysis(JSA) and Checklist were used to identify the risk factors and to calculate the level of the risk. By comparing the two risk assessment tools, it was figured out that the JSA is appropriate for the initial process and change of work procedure while Checklist is appropriate for repetitive work. Because the sealing process is sort and simple, it is unlikely to cause serious injury. But since the risk of falling and cuts are exist, safety education and supervision are necessary to maintain a safe working environment.

Keywords

References

  1. Y. M. Roh, M. H. Suk, C. P. Na, K. Y. Kim, T. J. Cho, S. H. Sim and H. C. Ha, "A Research of Infrastructure Standard for Asbestos Abatement in Korea", Korea Occupational Safety & Health Agency - Occupational Safety & Health Research Institute, p. 2, 2008.
  2. Y. M. Roh, "The Standard Methods for the Asbestos Removal Work", Korea Occupational Safety & Health Agency - Occupational Safety & Health Research Institute, p. 1, 2012.
  3. J. Y. Kim, S. K. Lee, J. H. Lee, M. H. Lim, S. W. Kang and Y. G. Phee, "A Study on the Factors Affecting Asbestos Exposure Level from Asbestos Abatement in Building Demolition Sites", Journal of Korea Industrial Hygiene Association, Vol. 19, No. 1, pp. 8-15, 2009.
  4. H. S. Oh, J. M. Kim and S. R. Chang, "A Study on the Process Analysis and the Risk Assessment for Removal Work of the Asbestos Cement Slate", J. Korean Soc. Saf., Vol. 29, No. 6, pp. 137-143, 2014. https://doi.org/10.14346/JKOSOS.2014.29.6.137
  5. Korea Occupational Safety & Health Agency, "Guide to Dismantling and Removing Asbestos", p. 32, 2013.
  6. Korea Occupational Safety & Health Agency, "Technical Guidance on Job Safety Analysis, pp. 16-20, 2013
  7. Korea Occupational Safety & Health Agency, "Technical Guidelines for Risk Assessment at Workplace Using Checklist", pp. 9-12, 2014
  8. Korea Occupational Safety & Health Agency, "Development of Manual for Securing the Safety of Asbestos Demolition Work", pp. 16-20, 2018.
  9. D. M. Lee, "Risk Assessment for Securing Safety of Asbestos Dismantling and Removal Work", pp. 26-30, 2018.
  10. Korea Occupational Safety & Health Agency, "4M Risk Assessment Procedures and Methods", pp. 25-27, 2007
  11. Korea Occupational Safety & Health Agency, "Risk Assessment Guideline", pp. 39-41, 2017