• 제목/요약/키워드: Safety Management Checklist

검색결과 122건 처리시간 0.023초

철도운행선 인접공사 사고분석과 체계적인 체크리스트 개발 등 안전대책 수립에 관한 연구 (A Study on the Development of Safety Management Checklist Using Accident Case adjacent to Railway Operation)

  • 류상환;염병수;갈원모
    • 산경연구논집
    • /
    • 제9권10호
    • /
    • pp.63-72
    • /
    • 2018
  • Purpose - This thesis is to develop a management plan and checklist by analyzing the prevention of accidents in advance by presenting the management plan for the major causes of railway accidents. Research design, data and methodology - In recent 5 years, we have analyzed the cases of railway accident, presented the management plan for the accident, and made a practical safety checklist focusing on the main measures according to the management plan. Results - The analysis of the cases of near-railway accidents suggests more concrete and practical safety management measures because the similar accidents are continuously occurring due to formal safety management. Conclusions - It is more valuable to apply to the adjacent construction of the railway line by creating a detailed checklist based on cases rather than the existing checklist. This study is written only as a human factor. For future real - time safety management, it is necessary to study more precisely cause analysis and safety equipment as a big data - based safety control system for more systematic safety management.

체크리스트를 이용한 기관형태별, 연구분야별 연구실 안전관리 실태 비교 (Comparison of Laboratory Safety Management States in Organization Type and Research Field by using a Checklist)

  • 박재희;한우섭;갈원모
    • 한국안전학회지
    • /
    • 제25권1호
    • /
    • pp.72-78
    • /
    • 2010
  • Laboratory accidents have happened incidently. However, laboratory safety management has been out of concerns for a long time. At last, the Korean government established an act called Establishment of safe environment of laboratories in 2005. To support the act and to establish policies on laboratory safety management,a national-wide survey was conducted for the 74 research organizations sampled and their 201 laboratories. For the survey, a safety management checklist with 114 items grouped into 20 categories was developed By using this checklist, safety expert groups investigated the laboratories and evaluated them on the five-point Likert scale. A statistical analysis was conducted to compare the safety management status between different research organization types and between different research fields. The resultsmanaw that the universities are in significant lower level on safety institution and safety education than the public research organizations and theare poration research organizations. In terms of research field, chemistry/chemical engineering laboratories generallymanaw higher level compared with theaothers. Conversely, biology/life science laboratories marked low levels in a number of checklist items.

건설공사 안전사고 예방을 위한 안전관리 체크리스트 개선과 공정관리와의 연계운영 방법 (A Study of Methods on Safety Checklist Improvement and Integrated Operation with Schedule for Construction Accident Prevention)

  • 양용철;최훈;김재준
    • 한국건설관리학회논문집
    • /
    • 제5권2호
    • /
    • pp.123-135
    • /
    • 2004
  • 건설공사에서 안전사고 예방을 위하여 안전조직, 교육, 점검과 평가에 많은 노력을 기울이고 있으나 안전사고가 감소하지 않고 있는 실정이다. 건설현장의 안전사고를 예방하기 위하여 안전관리자, 안전교육, 점검과 평가, 공정관리, 안전관리 체크리스트의 활용에 관한 실태조사를 실시하고 문제점을 분석하였다. 그에 따라 작업에 관한 안전관리 체크리스트를 상세하게 사전에 작성하여 전산화하고 부가적인 정보를 연계하여 활용도를 높이는 체크리스트 개선안을 제시하였다. 나아가 체크리스트와 공정표상의 작업과의 연계방법과 운영방법을 제시하여 체크리스트가 시간개념을 갖고 체계적으로 활용되어 안전사고를 예방할 수 있도록 하였다.

Exploratory Study on the Process and Checklist Items for Construction Safety Inspection Utilizing Drones

  • Jung, Jieun;Baek, Mina;Yu, Chaeyeon;Lee, Donghoon;Kim, Sungjin
    • 한국건축시공학회지
    • /
    • 제23권3호
    • /
    • pp.327-336
    • /
    • 2023
  • The focus of this research was to devise a conceptual methodology for drone usage and to assess the viability of safety checklist items specific to drone application in safety oversight. The appraisal was grounded in a focus group interview involving professionals from construction management and safety fields. The proposed process was segmented into four stages: 1) pre-flight phase for flight plan development, 2) drone flight phase for safety condition inspection utilizing checklist items, 3) post-flight phase for visual asset analysis, and 4) documentation and management phase. Furthermore, the research scrutinized the applicability of 32 distinct safety checklist items for drone operations. The primary aim of this investigation was to probe the possible deployment of drones as part of construction safety inspections at work sites. However, it bears mentioning that subsequent research should strive to gather a more extensive sample size through questionnaire surveys, thereby facilitating quantitative analysis. Administering such surveys would yield more comprehensive data compared to a focus group interview, which was constrained by a limited participant count. In summation, this study lays a foundational groundwork for understanding the potential advantages and challenges associated with integrating drones into construction safety management.

작업현장 사고예방을 위한 위험인지 점검체크리스트 개발 (The Development of Inspection Checklist for Risk Recognition to Prevent Accidents at Worksites)

  • 임형덕;라지타 가우설야;김상훈;오영찬;이호용;남기훈
    • 한국산업융합학회 논문집
    • /
    • 제25권5호
    • /
    • pp.811-816
    • /
    • 2022
  • Even though continuous management and supervision of reinforcement of policies to safeguard accidents at workplace and work sites were implemented. Accident prevention activities such as inspection and diagnosis are urgently required to induce a preliminary investigation to identify the risk factors for each type of work, before the work task to eliminate risks at the worksites. Since safety inspections at work sites were generally conducted through visual inspections, the results of safety inspections may vary depending on the findings and proficiency of the safety officers. The results of those inspections may have loopholes to prevent potential accidents at work. Therefore, the purpose of this study was to develop a risk identification checklist that can effectively perform safety inspections to prevent accidents at work sites. This study initially analyzed the previously developed accident checklist to identify current complications and issues in safety checklists. Based on the findings of major industrial accidents over the past three years, the relationship between accident, workplace, and work type were analyzed refereeing the safety inspection standards. A risk recognition-checklist was developed to provide basic data on identifying risk factors, and inspection guidance at work sites. To prepare for potential accidents by identifying and taking countermeasures to mitigate the high risk and serious accidents at sites by the guidelines of the checklist. The developed inspection checklist has been practically used by experts at work sites to perform safety inspections, and it has been verified its suitability, and feasibility, to prevent or mitigate workplace accidents, including securing the safety and health of field workers. The role of the developed safety checklist has been considered effective at worksites.

석면 해체제거 보양작업에서 JSA 및 Checklist 적용 (Application of JSA and Checklist in Asbestos Sealing)

  • 조규선
    • 한국안전학회지
    • /
    • 제35권2호
    • /
    • pp.61-66
    • /
    • 2020
  • As asbestos-containing buildings are getting older, asbestos deconstruction works are increasing. As a result, accident risks such as falls, cuts, electric shocks, and suffocation are increasing. Existing studies are mostly about health management and institutional policy research and there is little research on work risk. So workplace risk assessments that are easily applicable in the field are required to be applied. Sealing is the first process of asbestos deconstruction and is the first step to ensure worker's safety. Job Safety Analysis(JSA) and Checklist were used to identify the risk factors and to calculate the level of the risk. By comparing the two risk assessment tools, it was figured out that the JSA is appropriate for the initial process and change of work procedure while Checklist is appropriate for repetitive work. Because the sealing process is sort and simple, it is unlikely to cause serious injury. But since the risk of falling and cuts are exist, safety education and supervision are necessary to maintain a safe working environment.

재해예방을 위한 건축공사 설계단계 안전 위험성 평가 체크리스트 (Occupational Health and Safety Risk Assessment Checklist for Preventing Accidents During Building Design Phase)

  • 한병수;박찬식;홍성호
    • 한국건설관리학회논문집
    • /
    • 제8권2호
    • /
    • pp.68-74
    • /
    • 2007
  • 지금까지 건설재해를 예방하기 위한 건설공사의 안전관리는 시공단계에서만 활발히 수행되어 왔다. 하지만 사망재해의 15%가 작업자 안전에 부정적인 영향을 미치는 부적절한 설계에 의해 발생하였다는 점을 감안할 때, 설계(안)에 존재하는 안전 위험성을 조기에 발굴 및 평가하여 제거 및 최소할 필요가 있다. 본 연구는 '안전을 위한 설계(Design for Safety)' 개념을 활용하여 설계(안)에 존재하는 안전 위험요소를 발굴 및 평가할 수 있는 체크리스트의 개발을 목적으로 하고 있다 이를 위해 영국 산업안전보건청(Health and Safety Executives)에서 활용하고 있는 설계단계 안전 위험성 평가 체크리스트의 구조, 활용절차 및 문제점에 관한 문헌연구를 수행하였다. 이를 통해 공간, 부위 및 공종별 안전 위험요소와 원인의 분류, 안전수준의 정량적 평가, 안전위험요소의 제거 및 최소화를 위한 안전설계지침 및 관련 안전기준을 반영한 새로운 안전 위험성 평가 체크리스트를 제안하였다. 설계단계 안전 위험성 평가 체크리스트는 건축공사 전반에서 발생할 수 있는 재해를 조기 예방하는데 있어 유용한 도구로 사용될 수 있다.

4M 방식에 의한 화학실험실 위험성 평가 기법

  • 김종인;이동호
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2008년도 춘계학술대회
    • /
    • pp.11-18
    • /
    • 2008
  • This research modified the checklist used in the universities in USA, England and Korea considering the current situation of Korea, and conducted case studies upon each section of appointed chemical laboratories based on 4M criteria, which stands for Machine, Media, Man and Management. The purpose of the studies is to assess how dangerous the laboratories are and to contribute to prevention of accidentsin the laboratories as well as reducing loss of lives and property. The result of this research found out the harmful and hazardous factors based on the 4M-type checklist and predicted the dangerousness as it multiplies possible frequency by intensity. Protective equipment, safety facilities in laboratories, emergency exit and compressed gas cylinder are found to be more dangerous, so the result shows that it is desirable to improve ventilation, safety facilities and circumstances of the laboratory through the investment.

  • PDF

환자 안전을 위한 경추 및 요추부 도침시술 전후 체크리스트 제안: 예비연구 (Proposal of Checklists for Patient Safety in Miniscalpel Acupuncture Treatment of Cervical and Lumbar Spine: Pilot Trial)

  • 조희근;송민영;윤상훈;정신영;김종환;백은혜;임정태
    • 한방재활의학과학회지
    • /
    • 제28권1호
    • /
    • pp.61-72
    • /
    • 2018
  • Objectives The authors propose a new checklist model adapted for safety miniscalpel acupuncture procedure of cervical and lumbar spine. Methods On the basis of available literature and expert opinion, a prototype checklist was developed. The checklist was adapted on the basis of observation of daily practice. Results The checklist has three parts: 1. prevention and management of healthcare associated infections, 2. verification list before and after miniscalpel acupuncture treatment, 3. adverse event monitoring after procedure. We presented a summary checklist based on the above contents. Conclusions We propose the first patient safety checklist for minicalpel acupuncture treatment of cervical and lumbar spine. The checklist will be complemented using further research methodologies.

모듈러 건설현장의 단위작업별 안전관리 활동 및 중점 체크사항 제안 (Suggestion of Safety Management Activities and Key Check point for Safety Management in Modular Construction Sites)

  • 전영훈;김균태
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 봄 학술논문 발표대회
    • /
    • pp.202-203
    • /
    • 2022
  • In this study, focusing on work types of lifting modules and modules assembly in modular construction sites, unit works were defined according to the construction process of each work type, and safety management elements, safety management activities, and key check point were proposed. The results of this study may have somewhat overlapping contents in the construction procedure in order to derive specific safety management activities and check point for each unit work. Therefore, there is a limit to use the results in an actual modular construction site. In future research, we plan to improve this part and derive a checklist that considers field usability.

  • PDF