• 제목/요약/키워드: Safety Management Basic Plan

검색결과 137건 처리시간 0.028초

Air Diving Operation, Management and Planning for Safe and Effective Underwater Works (안전하고 효율적인 수중작업을 위한 공기잠수의 계획·운용·관리)

  • Lee, Woo Dong;Kim, Sung Gil;Kim, Myeong Hoon;Lee, Jae Hyung
    • Journal of the Korean Society of Safety
    • /
    • 제34권4호
    • /
    • pp.103-110
    • /
    • 2019
  • Underwater works are indispensable in the coastal and ocean engineering fields, and the reliance on manpower is higher than land works. Divers who work for a long time in a high-pressure underwater environment are always exposed to the risks of diving-related diseases. To prevent them, proper planning, operation, and management of diving by a supervisor with professional diving knowledge are required. This study provides the basic data for supervisors to plan, operate, and manage air diving for safe and efficient work in underwater construction sites. It is well-known that air diving simulations using the varying permeability model (VPM) require a longer decompression time as the water depth and the residence time in water increase. Therefore, it is crucial to have a proper surface interval through repetitive diving rather than single diving to improve the safety of the divers and the efficiency of underwater work. Furthermore, coastal and ocean engineers who manage and supervise underwater construction work must acquire expert knowledge on diving before they can plan, operate, and manage diving.

A Study for the Improvement on Use Transparency of the Occupational Safety and Health Management Cost in Construction (건설업 산업안전보건관리비 사용 투명성 강화 방안 연구)

  • Lee, Sun Yong;Jeong, Seong-Choon;Oh, Se Wook
    • Journal of the Korean Society of Safety
    • /
    • 제35권1호
    • /
    • pp.34-44
    • /
    • 2020
  • The purpose of this study is to suggest ways to improve the transparency of occupational safety and health management cost (OSHMC) in order to create a safe working environment that can guarantee the health of construction workers. It was performed in the following procedures and methods. (1) collecting and analyzing resources related to the OSHMC in construction, (2) gathering stakeholder opinions for interviewing actual conditions, (3) deriving the improvement plans based on survey results and (4) suggesting direction for improvement of related laws based on the results of the research. As a result of this study, the following ways were found to be effective for enhancing transparency of the OSHMC in construction. (1) disclosure of usage details in sites, (2) Expansion of the standard for the OSHMC in construction, (3) Increase in fines for false use, (4) Establishment of the plan to improve the OSHMC ratio of small-scale construction sites, (5) Strengthen the role of supervisory and support organizations such as the Ministry of Employment and Labor and the Korea Occupational Safety & Health Agency. The result of this study is expected to be used as a basic data for future improvement of the occupational safety and health acts in Korea.

A Study on the Characteristic of Electrical Construction Work for Prevention of Electric Shock Accident (감전재해 예방을 위한 전기공사업의 특성에 관한 연구)

  • Choi, Sang-Won
    • Journal of the Korean Society of Safety
    • /
    • 제29권5호
    • /
    • pp.29-34
    • /
    • 2014
  • The live line working is inherently dangerous as the workers have to work under the risk of electrical shock and most of works are carried out at height. The live line working need the some specific techniques and higher level safety measures such as a risk assessment to carry out works safely, but the electrical construction companies performed live-line working are usually small-sized companies. They have less capacity to have own safety management system. This study intended to conduct an in-depth analysis on the cause of electric shock accidents to provide basic data for policy proposing taking into considering the past eleven years for a long-term plan. And the aim of this study is to propose the policy about the equipment performance standards and/or worker's safety standards to revise the standards for preventing electric shock accidents, moreover, co-relation of the electrical work order form and on safety workings, especially electrical construction company/work.

Risk Analysis of Lifting Work for Risk Assessment of Modular Construction (모듈러 건축 현장의 위험성평가를 위한 양중작업 위험요소 분석)

  • Jun, Young-HUN;Kim, Kyoon-Tai;Jeon, Eun-Bi
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.291-292
    • /
    • 2021
  • In modular construction, it is insufficient for safety management of workers, and workers are still exposed to the risk of accidents due to work at high places for lifting and assembly work in modular construction sites. Therefore, it is necessary when preventive safety management through risk management of workers on modular construction sites. This study is a basic study for the risk assessment(checklist) of modular construction, and the purpose of this study is to analyze the risk factors of the module lifting work at the modular construction site. It is intended to identify the hazard risk factors and improvement measures of the existing lifting operation, by analyzing the case of the risk assessment of the existing RC method, and to identify the risk factors for each work process when lifting the module. In the future, the results of this study are expected to be utilized in the development of checklists for risk assessment as safety management plan for modular construction sites.

  • PDF

A Study on the Safety Management Items for Preventing Accidents of Aged Construction Workers (중.고령 건설근로자의 재해예방을 위한 안전관리 항목에 관한 연구)

  • Lee, Hyun-Chul;Song, Do-Heom;Go, Seong-Seok
    • Journal of the Korean Society of Safety
    • /
    • 제24권1호
    • /
    • pp.50-59
    • /
    • 2009
  • Korea reached an aging society in 2000, and it is progressed quickly now. Government forecasts that the number of aged people over 65 years old will increase from 7.2%(2000) to above 14.3% among total population in 2018. Workers over fifty years old are increasing in construction field every year. These aged workers are exposed to various construction accidents, and also their accident rate is very high because of physical and psychological changes by aging. Specially, a disaster of aged workers more than 50 years old is fronted at the serious situation in the construction industry which has variable working environment. Thus, the purpose of this study is to suggest the precaution by analysing disaster characteristics of aged construction workers. Also, this study aims to present a basic counter-plan according to important safety management list which is abstracted from the work, aged construction workers' accident rate is high.

An Analysis of Relationship between Unsafe Acts and Human Errors of Workers for Construction Accident Prevention (건설사고 예방을 위한 근로자의 불안전한 행동과 휴먼에러와의 관계 분석)

  • Min, Kwangho;Cha, Yongwoon;Han, Sangwon;Hyun, Changtaek
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • 제35권5호
    • /
    • pp.161-168
    • /
    • 2019
  • Construction industry is becoming more advanced, but safety accidents are not decreasing and unsafe act (UA) and human errors (HE) are the main causes of safety accidents. Therefore, this study aims to analyze the relationships between unsafe acts and human errors for construction accident prevents. Specifically, the Correlation Analysis is used to quantify 24 combinations of the relationship between the UA and HE. Then, the Kano Model, and Timko Satisfied Coefficient was utilized to find 6 combinations for construction accident prevention plans. As the result of Timko Satisfied Coefficient, an interview was conducted with three safety managers and 6 safety prevention plan is proposed. Through these results, it is expected that the combination of 24 accidents will be basic data of safety management. Especially, the proposed safety prevention plans considering the characteristics of 6 combinations with high correlation can contribute to prevention of safety accidents at the construction site.

Countermeasures for Management of Off-site Radioactive Wastes in the Event of a Major Accident at Nuclear Power Plants

  • Lee, Ji-Min;Hong, Dae Seok;Shin, Hyeong Ki;Kim, Hyun Ki
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • 제20권3호
    • /
    • pp.339-347
    • /
    • 2022
  • Major accidents at nuclear power plants generate huge amounts of radioactive waste in a short period of time over a wide area outside the plant boundary. Therefore, extraordinary efforts are required for safe management of the waste. A well-established remediation plan including radioactive waste management that is prepared in advance will minimize the impact on the public and environment. In Korea, however, only limited plans exist to systematically manage this type of off-site radioactive waste generating event. In this study, we developed basic strategies for off-site radioactive waste management based on recommendations from the IAEA (International Atomic Energy Agency) and NCRP (National Council on Radiation Protection and Measurements), experiences from the Fukushima Daiichi accident in Japan, and a review of the national radioactive waste management system in Korea. These strategies included the assignment of roles and responsibilities, development of management methodologies, securement of storage capacities, preparation for the use of existing infrastructure, assurance of information transparency, and establishment of cooperative measures with international organizations.

A study on the implementation plan of deposit system for management of fishing gear (어구 관리를 위한 보증금제 실행방안 연구)

  • Dong-Yang KANG;Seonghun KIM;Kyunghoon LEE;Yoo-Won LEE
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • 제59권4호
    • /
    • pp.377-386
    • /
    • 2023
  • As discarded fishing gear settles or floats on the seabed, it destroys the spawning and habitat of fisheries resources that causes various safety accidents and adverse effects on the environment, such as generating microplastics and causing ship accidents. In order to solve this problem, this study is intended to present an implementation plan for establishing a fishing gear deposit system in order to use it as basic data for establishing policies for fishing gear management in Korea. In order to successfully implement the fishing gear deposit system, the deposit system must be established in the form of fishing gear completed at the production stage. It was found that the marking of the object should be easy, and that determining an appropriate deposit amount to motivate the return of waste fishing gear and establishing a convenient return procedure for returned waste fishing gear were important factors. In addition, transparent management of unreturned deposits and mandatory use of fishing gear subject to the deposit system for fishermen will be necessary. The role of a specialized organization to manage and operate all of these procedures is also very important. It is necessary to establish a new mandatory provision in the Fisheries Act to require fishermen who directly use fishing gear to use fishing gear with a deposit refund mark, and to ensure the implementation of the deposit system by linking it with the evaluation items of government policy projects. Since the main purpose of the deposit system is to collect discarded fishing gear, a support plan will be necessary in accordance with the purchase project for fishing waste salvaged by local governments in 2020.

The Way for improvement of facility to strengthen accessibility of the site for fire department (소방대의 현장접근성 강화를 위한 설비의 개선방안)

  • Oh, Taek-Hum;Sung, Ja-Man;Pak, Chan-Suk
    • Journal of the Korea Safety Management & Science
    • /
    • 제14권3호
    • /
    • pp.67-75
    • /
    • 2012
  • Because recently(July 14, 2011) fire occurred in the engine room of a moving taxi under Namsan Tunnel 1, 51 vehicles' driver and more than 250 passengers in the road tunnel were urgently evacuated with abandoned vehicles. Vehicle fires in Namsan Tunnel that day, Sufferers struggled to escape quickly difficult to escape the two-way by abandoned vehicles on the road and to fear many casualties by using vehicle fuel and combustible interior and the driver who is ignorant of vehicle accident continuous entered in the road tunnel had accessibility the site of fire department was more difficult. In this study, It is to investigate structure and basic materials, such as fire extinguish equipment and facilities for damage prevention and to analyze the problems and to plan improvement method of fire extinguish equipment, facilities for damage prevention and transportation facilities(Large traffic signs, Breaker, etc.) on the Namsan Tunnel that in the long-term plan is prepared to strengthen for accessibility of the site of fire department in case of Vehicle's fire.

Plan for Flood Control Linked with Dam and River Basin (댐과 하천유역을 연계한 홍수 대응 방안 - 2020년 섬진강 홍수사상을 대상으로 -)

  • Kyong Oh Baek;Dong Yeol Lee
    • Journal of the Korean Society of Safety
    • /
    • 제38권2호
    • /
    • pp.81-86
    • /
    • 2023
  • In this study, a one-dimensional numerical model was constructed to propose a flood control plan linked with the dam and river basin for the flood events of the Seomjin River in 2020. The flood level reduction of the downstream river was tested based on a scenario operation of the Seomjingang Dam and was also analyzed when a storage pocket was newly constructed as one of the river basin measures. It was confirmed that Seomjingang Dam's flood control capacity would be increased if the flood limit level was drastically lowered from the current EL. 196.5 m to EL. 188.0 m. In addition, if the upper area of the (old) Geumgok Bridge (which suffered great damage due to the loss of the levee) is used as a storage pocket, it would be effective in preventing floods in the lower area of it. In the era of the climate crisis, more integrated flood management is needed and basic river management must be observed.