• 제목/요약/키워드: Safety Management Basic Plan

검색결과 134건 처리시간 0.027초

안전관리를 위한 BIM적용 증강현실 시스템 적용 방안에 관한 기초연구 (A Basic Study on the BIM-based AR(Augmented Reality) System for Safety Management)

  • 이종훈;최주원;서희창;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.147-148
    • /
    • 2012
  • According to the analysis report of construction fall accident, situation not installed safety facilities caused the largest of disaster in temporary structure. Therefore, actionable measures will be needed identifying the installation of safety facilities immediately. In this study proposed plan by the safety facilities to effectively visualize, supervision can be easily for reduce fall accident. This system can be used BIM and augmented reality technology by combining in the field in real-time. Through this study, safety facilities management is improved and expected to prevent a accident.

  • PDF

건설업 기초안전보건교육 현황 및 개선에 관한 연구 : 교육 내용 및 방법을 중심으로 (A Study on the Status and Improvement of the Basic Occupational Safety and Health Training for the Construction Industry : focused on the Educational Methods and Contents)

  • 신기남;주선우;양상현
    • 한국산학기술학회논문지
    • /
    • 제16권5호
    • /
    • pp.3484-3490
    • /
    • 2015
  • 건설산업은 타 산업에 비해 재해율이 높으며, 그중에서도 특히 사망자 발생 등 중대재해 비율이 높아 안전교육 및 관리의 중요성이 매우 높은 산업이다. 고용노동부는 근로자의 안전의식을 고취하고 사고율을 낮추기 위해 건설현장의 모든 근로자를 대상으로 건설업 기초안전보건교육을 실시하도록 하고 있다. 그럼에도 불구하고 이러한 의무를 지키는 현장이 한정적일뿐더러 형식적인 교육으로 인하여 그 효과가 미미하다는 지적이 있다. 이에 본 연구는 건설업 기초안전보건교육 실시현황, 교안 사례 및 교육방법을 분석하여 문제점을 파악한다. 또한 효과적 교육법에 관한 선행연구를 분석하여 근로자의 안전의식 고취에 효과적인 교육 방법을 제시하고, 최근 건설현장 사망사고 유형을 공종별로 분류함으로써 교육 대상 특성을 고려한 교육내용을 현행 건설업 기초안전보건교육의 개선방안으로 제시한다.

위험도 평가기법을 적용한 철도시스템의 안전관리 (A Basic Study on the Railway Safety Management Based on Risk Assessment Approach)

  • 김상암;왕종배;곽상록;이동하
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2003년도 추계학술대회 논문집(II)
    • /
    • pp.223-228
    • /
    • 2003
  • Risk Management does not mean accepting a risk but having a good grasp of, eliminating and controling the exact causes of known hazards. Good safety management plan or system for the safety of any systems need to include the procedures about standing safety goals, related technical information, time schedule, audit programs, etc at least. In this paper the summeries on general risk assessment techniques and the examples of risk assessment system and railway risk management strategies used in UK, Australia and Canada are introduced, and applicable establishment procedures for domestic railway industries are proposed.

  • PDF

재난·안전 관리 및 표준화 동향에 관한 연구 (A Study on the Disaster Safety Management and Standardization Trends)

  • 강희조
    • 한국항행학회논문지
    • /
    • 제13권5호
    • /
    • pp.799-804
    • /
    • 2009
  • 본 논문에서는 인구의 증가, 도시의 거대화, 교통의 발달 이상기후 등으로 인한 재해 재난이 급증하고 피해규모도 점차 확대되고 있는 상황에서 재난관리를 통한 국민의 행복과 안정된 삶을 확보하는데 필요한 재난 안전 관리 시스템을 방재선진국의 시스템을 분석하여 재난 안전 관리에 대한 개선방안과 시사점을 도출하고자 한다. 또한 국내외 재난관련 표준화 동향을 통하여 재난관리 활동의 효율성을 높이고자 한다.

  • PDF

u-방재 City 기본방향 연구 (Introduction of Principles for Disaster Prevention Planning in u-City)

  • 김현주;박영진;이원성;연경환
    • 한국방재학회:학술대회논문집
    • /
    • 한국방재학회 2008년도 정기총회 및 학술발표대회
    • /
    • pp.127-130
    • /
    • 2008
  • This study demonstrates a basic concept and designing direction for the realisation of disaster prevention planning in u-City(u-BangjaeCity) that is from establishing a planning system in terms of the areas of professional disaster and safety management for the national disaster management. and designing disaster or safety management system via using ubiquitous technology for the scientific disaster management. In order to realise u-City it is necessary to maps out interrelation amongst various services such as traffic, environment and disaster prevention. Domestic and international case studies regarding the tendency of disaster prevention planing in u-City and its analysis could be the fundamental resource in order to develop the standard model of u-BangjaeCity.

  • PDF

교통시설물 투자평가에 관한 연구 -충주시를 중심으로- (A Study on Investment Evaluation of Transportation Facilities)

  • 김용범;김용래
    • 대한안전경영과학회지
    • /
    • 제5권1호
    • /
    • pp.13-31
    • /
    • 2003
  • This provided a basic frame to analyze the investment effect on the road, railroad, airport and port as a national dimension but it still has a limitation to analyze the specific economic and financial validities to consider the characteristics of the traffic facilities within the area. Conclusively, the aims of this study provide the reasonable evaluation guidelines effectively to the local automatic groups, especially Chungju in the frame of the present evaluation guidelines. We provide the adaptive alternatives on the present systems which are difficult to adapt to the present investment evaluation guidelines; the estimation method of the social economic index and the estimation method of the traffic demand. Additionally, we discuss the research method of the passage actual state for a reasonable estimation of the traffic demand. The result of this study will be activated for the validity check and construction plan of the reasonable traffic investment plan of Chungju city.

조직중심의 지자체 기능연속성계획(COOP) 수립방안 및 실행력 확보에 관한 연구 (A Study on the Establishment of Executable Continuity of Operations(COOP) to Local Governments focusing on Organization)

  • 최혜령;이영재;정종수
    • 한국재난정보학회 논문집
    • /
    • 제18권2호
    • /
    • pp.405-417
    • /
    • 2022
  • 연구목적: 지자체는 국민의 안전과 생활에 직접적으로 영향을 주는 행정조직으로서 재난 발생 시 핵심 기능의 연속성 확보가 중요하다. 본 논문은 재난으로부터 지자체 핵심기능을 보호·유지하기 위한 기능연속성계획의 수립 및 실행력 확보를 위한 효율적인 방법을 검토하는 것을 목적으로 한다. 연구방법: ISO22301기반 한 기능연속성계획의 비효율성을 개선하기 위하여, 조직중심의 기능연속성 방법을 적용하여 계획수립 방안과 핵심기능, 소요자원 그리고 교육훈련에 관련된 기본 서식을 제시하고, 지자체에 적용하여 타당성을 검토한다. 연구결과: 제안된 조직중심의 기능연속성계획 작성 방법은 관료적인 지자체의 특성을 반영하여 실국 단위로 작성함으로써 작성 및 실무적용이 용이하다. 결론:민간에 비하여 업무가 조직중심으로 되어 있는 공공분야에서는 기능연속성계획 수립에 조직적인 관점을 충분히 반영하는 것이 더 효율적인 방법이 될 수 있다.

제3차 건설기술진흥기본계획 (The Third Construction Technology Development Master Plan)

  • 지상욱
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.202-206
    • /
    • 2002
  • $\lceil$건설기술진흥기본계획$\rfloor$은 건설기술관리법에 근거한 5년 단위의 법정계획으로서, 건설기술의 연구개발을 촉진하고, 연구성과의 효율적 이용을 목적으로 하고 있다. 2000년에 수립된 $\lceil$제2차 기본계획$\rfloor$의 추진기간이 2002년으로 종료됨에 따라 현재, 차기 계획인 $\lceil$제3차 기본계획$\rfloor$을 수립 중에 있다. $\lceil$제3차 기본계획$\rfloor$은 "세계 건설시장을 주도하는 건설환경 조성"을 장기비전으로 제시하였으며, "건설사업 효율화를 통한 경쟁력 제고", "기술위주 산업으로의 전환"을 기본목표로 제시하고 있다. 또한, 건설전문인력, 생산시스템, 환경, 안전, 건설정보화, 건설엔지니어링, 건설 R&D 등 7개 분야에 25개 중점추진 과제를 제시 하였다.

  • PDF

인천지역 물류산업의 정보화 방안에 관한 실증적 연구 (A Empirical Study on Informatization of Logistics Industry in Incheon)

  • 이두용;장정환;조용철;김동민;김정환;이창호
    • 대한안전경영과학회지
    • /
    • 제13권3호
    • /
    • pp.79-85
    • /
    • 2011
  • The logistics industry in Incheon is lack of basic usage for logistic information. As development of logistics industry the companies recognized the importance of logistics informatization. But due to a small scale of logistic companies it is difficult to equip the basic infrastructure for logistics informatization. To investigate the status of informatization of logistics companies in Incheon, we divide questionnaire by the aspects of information operations, aspects of information needs, information effects and policy aspects of planning and support information. By the result of survey we suggest the supporting plan for Incheon logistics industry.

랜덤 포레스트 기법을 이용한 건설현장 안전재해 예측 모형 기초 연구 (Basic Study on Safety Accident Prediction Model Using Random Forest in Construction Field)

  • 강경수;류한국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 추계 학술논문 발표대회
    • /
    • pp.59-60
    • /
    • 2018
  • The purpose of this study is to predict and classify the accident types based on the KOSHA (Korea Occupational Safety & Health Agency) and weather data. We also have an effort to suggest an important management method according to accident types by deriving feature importance. We designed two models based on accident data and weather data (model(a)) and only weather data (model(b)). As a result of random forest method, the model(b) showed a lack of accuracy in prediction. However, the model(a) presented more accurate prediction results than the model(b). Thus we presented safety management plan based on the results. In the future, this study will continue to carry out real time prediction to occurrence types to prevent safety accidents by supplementing the real time accident data and weather data.

  • PDF