• Title/Summary/Keyword: STREAM RESTORATION

Search Result 502, Processing Time 0.023 seconds

A Review of Stream Assessment Methodologies and Restoration: The Case of Virginia, USA

  • Bender, Shera M.;Ahn, Chang-Woo
    • Environmental Engineering Research
    • /
    • v.16 no.2
    • /
    • pp.69-79
    • /
    • 2011
  • Rapid population growth and land use changes have severely degraded streams across the United States. In response, there has been a surge in the number of stream restoration projects, including stream restoration for mitigation purposes. Currently, most projects do not include evaluation and monitoring, which are critical in the success of stream restoration projects. The goal of this study is to review the current status of assessment methodologies and restoration approaches for streams in Virginia, with the aim of assisting the restoration community in making sound decisions. As part of the study, stream restoration projects data from a project in Fairfax County, Virginia was assessed. This review revealed that the stream assessment methodologies currently applied to restoration are visuallybased and do not include biological data collection and/or a method to incorporate watershed information. It was found from the case study that out of the twenty nine restoration projects that had occurred between 1995 and 2003 in Fairfax County, nineteen projects reported bank stabilization as a goal or the only goal, indicating an emphasis on a single physical component rather than on the overall ecological integrity of streams. It also turned out that only seven projects conducted any level of monitoring as part of the restoration, confirming the lack of evaluation and monitoring. However, Fairfax County has recently improved its stream restoration practices by developing and incorporating watershed management plans. This now provides one of the better cases that might be looked upon by stakeholders when planning future stream restoration projects.

Strategy Prospects of Environmental Restoration of Stream Side in Japan(IV) (일본(日本)에서 계류변(溪流邊)의 환경복원(環境復元) 발전전략(發展戰略)(IV))

  • Park, Jae-Hyeon;Woo, Bo-Myeong;Lee, Heon-Ho
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.3 no.4
    • /
    • pp.84-90
    • /
    • 2000
  • The objective of this study was to introduce the current status and development strategy for an environmental restoration of stream side in Japan, and to consider a methodology which could be effectively applied for the environmental restoration of stream side in Korea. 1. In order to change the recent direction of the forest conservation and erosion control projects which are focused on the restoration of stream side ecology, we have to quit the past erosion control policy such as water control purpose, and establish new plans regarding on the forest conservation and erosion control which is considered the regional environmental restoration of watershed. 2. When we restore stream side and river side ecosystem, we should establish restoration plans which can keep the original nature of stream and river. 3. The forest conservation and erosion control construction projects for the restoration of stream and river ecosystem should be planned for the perfect restoration of their ecosystem by way of sustainable maintenance and management. 4. The restoration direction of stream and river ecosystem needs to be planned to restore the diversity of small geographies such as waterway, shoal and puddles rather than flattening of stream bed. 5. The main principle in the restoration of stream and river ecosystem is to accomplish forest conservation and erosion control construction projects which can conserve the existing stream and river ecosystem.

  • PDF

Urban Stream Landscape Improvement After Natural-Style Stream Restoration - Case Study of Yangjae Stream, Seoul - (도시 자연형하천 공사 후의 경관개선방안 - 서울시 양재천을 사례로 -)

  • Kim, Sun-Gun;Kim, Go Eun;Lee, Ji Eun;Shin, Dong-Hoon;Lee, Kyoo-Seock
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.7 no.5
    • /
    • pp.66-74
    • /
    • 2004
  • Since 1960s urban streams in Seoul have been dried and polluted because of urbanization. So, these devastated urban stream environment need to be restored for the better life of residents. Since 1995 stream restoration project which is called Natural-Style Stream Project have begun. However, some projects focused on the restoration of park-style open space rather than restoration of stream environment. As a result there are some stream landscapes to be improved. Therefore, this study aims to investigate the current status of urban stream landscape after Natural Style Stream Project and to propose the alternatives for the urban stream landscape improvement. The study site is Yangjae stream, Seoul.

Suggestions for Ecological Stream Restoration (생태하천 복원 방안)

  • Kim, Myungjin
    • Journal of Environmental Impact Assessment
    • /
    • v.16 no.1
    • /
    • pp.59-68
    • /
    • 2007
  • Urban streams have been severely degraded with wastewater and concrete structure over a prolonged period. The Chonggyecheon Restoration Project recovered a stream in the downtown Seoul with landscaping, plantings and bridges after the cover concrete and elevated asphalt road were removed. The project has been criticized partly because it is not an ecological restoration but rather the development of an urban park with an unnaturally straight flowing stream, artificial building structures, and artificial water pumping from the Han River. Nevertheless, the public have praised the project and almost 100,000 visitors per day come to see the reeds, catfish, and ducks. The stream restoration project is attractive to central and regional government decision makers because it increases the public concern of landscape amenity. Several projects such as Sanjichon and Kaeumjungchon are on going and proposed. These projects have a common and different respect in scope and procedure. The Chonggyecheon project in the process of environmental impact assessment (EIA) and prior environmental review system (PERS) reviewed the environmental impacts before development. Kaeumjungchon in the PERS and Sanjichon without EIA and PERS are reviewed. EIA and PERS systems contribute to checking the ecological sustainability of the restoration projects. A stream restoration project is a very complex task, so an integrated approach from plan to project is needed for ecologically sound restoration. Ecological stream restoration requires 1) an assessment of the entire stream ecosystem 2) establishing an ecologically sound management system of the stream reflecting not only benefits for people but also flora and fauna; 3) developing the site-specific design criteria and construction techniques including habitat restoration, flood plains conservation, and fluvial management; 4) considering the stream watershed in land use plan, EIA, PERS, and strategic environmental assessment (SEA). Additionally the process needs to develop the methodologies to enhance stakeholder's participation during planning, construction, and monitoring.

A Consideration on the Approach of Urban Stream Landscape Restoration - The Case of the Chungkye Stream Restoration Project - (도시하천경관복원 접근방법에 관한 고찰- 청계천 복원사업을 사례로 -)

  • Shin Dong-Hoon;Lee Kyoo-Seock
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.32 no.4
    • /
    • pp.39-48
    • /
    • 2004
  • In the 1960s, polluted urban streams were covered and paved in concrete. Rivers became sewers buried under road. As a result, wildlife habitat was lost and the open stream space was gone. In the 1990s, there was a movement for restoring urban streams to enhance the quality of life of inhabitants. Chungkye Stream, whose covering began from early 1950s and ended in 1977, is now in the process of restoration together with the Central Business District (CBD) Redevelopment Plan. However, as the construction proceeds, several problems were raised, and serious controversies resulted. Therefore, this study aims to investigate the validity of the approach of the Chungkye Stream Restoration Project through a literature survey and a site survey, and to present the improved alternative. Ultimately, the study aims to contribute to present references or guidelines for similar urban stream restoration projects. The Chungkye Stream Restoration Project has some of the following problems. First, the construction should be done based on the long-term urban redevelopment plan. Second, the construction period should be extended to restore urban streams. Third, the cultural asset conservation plan should be implemented. In order to fulfill the anticipated purpose, the above mentioned problems need to be solved.

Follow-up Monitoring & Adaptive Management after Ecological Restoration for the Stream - Focused the Hakui Stream in Anyang City - (생태하천 복원 후 모니터링과 적응관리 - 안양시 학의천을 중심으로 -)

  • Choi, jungkwon;Choi, mikyoung;Choi, cheolbin
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.18 no.6
    • /
    • pp.85-95
    • /
    • 2015
  • Recent years, nationwide projects for ecological restoration are implemented with emerging issues on the stream ecosystem. In order to enhance effectiveness of the ecosystem restoration and reduce negative impact, the appraisal of effectiveness through the follow-up monitoring and the adaptive management process are executed in consecutive phase. In this study, planning phase, monitoring and adaptive management in Hakui stream which is part of An Yang stream restoration project is introduced as representative ongoing case of effective adaptive management. The aim of this study is to verify the adaptive management process and suggest direction of effective restoration. Restoration project of Hakui stream resulted in increasing number and diversity of species (vegetation, fish, bird, invertbrates, amphibian and reptilia) according to monitoring from 2004 to 2013, and enhancing natural river landscape by evaluation of river naturalness among 2001(before restoration), 2007 (after), 2015 (recent). However, excessive vegetation expansion or sediment deposition on channel over time caused unexpected results such as terrestrialization or degradation of habitats. Adaptive management action such as removing disturbance species (Humulus japonicus)(2007), coppicing willow (2007), release of march snail (2007), creation of wetland (2014) were implemented based on monitoring results. And then appraisal of management action was discussed.

A Study on Establishment of the Directions for Environmentally-friendly Restoration of Underground Stream by Citizen Participation - In the Case of the Yangjae Underground Stream Restoration Project - (주민참여를 통한 도시복개하천의 환경친화적 복원방향설정에 관한 연구 - 과천 양재천 복개하천 복원사업을 사례로 -)

  • Song, Byeong Hwa;Yang, Byoung-E
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.9 no.2
    • /
    • pp.33-44
    • /
    • 2006
  • The purpose of this study is to establish future directions of environmentally-friendly restoration of Yangjae underground stream and reflect various opinions of inhabitant in the plan and design process. The opinions from the citizens include the economic and environmental suitability of the restoration projects and preference for the future directions of restoration. The citizens are favorable to removing the existing parking lot and want to have jogging course, walking path and bike road in the stream. Different opinions and resulted in preferred facilities and diminishing existing park along the stream depending on the restoration influencing zone. As a result, citizens agree in restoration but they have different opinions about the feasibility of new facilities, streams restoration and central park reduction locally. It is desirable to reflect the opinions of citizens in the process of plan and design of restoration project.

Stream Restoration Guidelines by Evaluation of Fish Habitat and Introducing of the Keystone Species - Geo-seok Stream and Cheonglim Wetland in Upper Stream of Buan-Dam - (어류서식처 평가 및 목표종 도입을 통한 하천복원방향 - 부안댐 상류 거석천과 청림습지를 대상으로 -)

  • Park, Sun A;Lee, Myung Woo
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.11 no.4
    • /
    • pp.24-36
    • /
    • 2008
  • The essence of a natural stream restoration project is providing habitats for various creatures in terms of the stream's environmental function. This research suggests the problems of natural stream restoration project by studying streams in terms of habitats for creatures and reviewing the national and international cases on existing natural stream restoration project. As a solution for the above, this research suggests a preservation method for biotope of upper stream areas focusing on the fish biotope area considering the ecological characteristics and preservation value of the respective stream so that the stream can be preserved as habitats for creatures. The research was carried out on Cheonglimli Baekcheon region which is an upper stream area of Buan-Dam located in the public park in Byunsanbando, Buangoon, Jeonlabookdo. We suggest the preservation method based on the habitat environment and keystone species of fish. The habitat environment evaluation was carried out mainly being divided into three groups namely, habitats and surrounding environment, reservoir's features and fish way and the diversity of fish. By improving the problematic elements discovered through such evaluation, it tries to improve the biotope of the stream and continuously preserve the stream. In addition, in order to restore the stream as habitats for various creatures, this research suggests to select keystone species which are suitable for the stream environment and restore the habitats based on the keystone species rather than restoring habitats for all species. Fish not only plays the role of a consumer of Epilithic algae and water beetles but also plays an important ecological role as a food for birds or small mammalia. If such ecologically important biotope for fish is preserved, the ecological environment of the stream will be maintained more stably.

Strategic Prospects of Environmental Restoration of Stream Side in Japan(I) (일본(日本)에서 한류변(漢流邊)의 환경부원(環境復元) 발전전략(發展戰略)(I))

  • Park, Jae-Hyeon;Woo, Bo-Myeong;Lee, Heon-Ho
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.3 no.1
    • /
    • pp.80-90
    • /
    • 2000
  • This study was carried out to introduce current status and development strategy for an environmental restoration of stream side in Japan, and to consider a methodology which could be effectively applied for the environmental restoration of stream side in Korea. Since the end of 20th century, the native ecology and landscape of Japan remained only a limited areas such as stream side, water side and forest areas. Therefore, recently the works of forest conservation and erosion control of environmental restoration on stream side tended to increased. The strategic prospects of environmental restoration in Japan were summarized as follows : 1. From the ecological point of view, we have to develop a certain method and technology in construction of forest conservation and erosion control to prevent environmental problem from erosion control works. 2. We have to restore not only a continuity of stream side forest from a primitive area to an estuary but also the stream side forest to preserve and restore a stream side vegetation on a primitive watershed areas. 3. We have to improve a method of construction or removal of a structure which were constructed in the stream to restore a water side environment and an interaction system for an integration on a forest land, stream, and erosion control. Additionally, we have to establish an integrated evaluation method and an enforcement system after investigation of influences on natural environment, stream, and forest etc. 4. We have to conduct an integrated research to investigate the ecosystem of stream side, and construct environmentally friendly water park and erosion control park which considered natural environment and its landscape. Additionally, we need to introduce and adopt a natural style stream construction method to restore a water side areas.

  • PDF

The Establishment of Ecological Landscape Conservation and Restoration Sections for Urban Stream - Case studies of Jeonjucheon and Samcheon in Jeonju-si - (도시하천의 생태경관 보전 및 복원구역 설정에 관한 연구 - 전주시 전주천과 삼천을 중심으로 -)

  • Lim, Hyun-Jeong;Lee, Myung-Woo;Jeong, Moon-Sun
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.22 no.2
    • /
    • pp.73-92
    • /
    • 2019
  • The purpose of this study is to establish the conservation and restoration areas for sustainable stream management by reflecting the ecological health, cultural characteristics, and the citizens' needs for stream uses. Therefore, we extended spatial ranges of stream evaluation to riparian areas in addition to stream sections. The evaluation indexes are stream naturalness, availability, biota assessment, and riparian characteristics such as land uses and legally protected areas. The grading system was unified with five classes. The spatial evaluation units for stream section are classified as right and left for laterally and 500m for longitudinally. For riparian areas, 30m and 100m of distance from the edge of stream are applied as spatial evaluation units. The six types of stream sections for management are conservation sections(priority/general) and restoration sections(priority/general) for ecological landscape and core and general sections for cultural landscape. The established system for evaluation and designating areas for stream management was applied to Jeonjucheon and Samcheon in Jeonju-si, and the conservation and restoration areas were designated reflecting the characteristics of urban and non-urban areas and left and right of stream sections. The results of this study will provide detailed guidelines for designating stream sections and practical management strategies for sustainable urban stream management.