• Title/Summary/Keyword: SCDF

Search Result 7, Processing Time 0.023 seconds

Power Interruption Cost Calculation based on Value-based Methodology (가치평가법을 사용한 정전관련비용의 산정)

  • Lee, Buhm;Kim, Kyoung-Min;Choi, Nam-Sup
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.16 no.2
    • /
    • pp.293-300
    • /
    • 2021
  • This study presents a Power Quality(:PQ) costs calculation methodology based on Value-Based Methodology. A SCDF including Voltage Sag Costs is presented to calculate Sustained Interruption Costs, Momentary Interruption Costs, and Voltage Sags Costs. Authors compared between interruption costs without Back-Up Power Supply and interruption costs with Back-Up Power Supply, and showed reduction of interruption costs by investing Back-UP Power Supply by multi-lateral analyzation. By applying this method to the real system, evaluated and analyzed power quality of the system.

A Study to Calculation Industrial Customer Interruption Cost Using Value- Based Distribution Reliability Assessment (가치평가법에 의한 산업용 수용가의 공급지장비 산정에 관한 연구)

  • Kim, Yong-Ha;Park, Nam-Cheol;Lee, Bum;Shin, Hyoung-Cheol;Woo, Sung-Min;Leem, Hyun-Sung
    • Proceedings of the KIEE Conference
    • /
    • 2006.11a
    • /
    • pp.408-410
    • /
    • 2006
  • This paper analyzes supply interruption cost for out industrial customer through data survey. And then we calculate SCDF using data survey. To decide the optimal SCDF, we decide regression function using AHP. Therefore we decide suitable SCDF of our industrial customer.

  • PDF

A Study on Plan of Distribution System considering Customer Interruption Cost (공급지장비를 고려한 배전계통 계획수립)

  • Kim, Yong-Ha;Woo, Sung-Min;Park, Chang-Gyu;Park, Chang-Gyu;You, Jung-Huy
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.159-160
    • /
    • 2008
  • This paper analyzes customer interruption cost for out industrial customer through data survey. And CIC calculated SCDF using regression function. That is, it extract optimal SCDF from AHP. And then to calculate VBDRA applied This algorithm to the distribution system. We proved the adequacy and usefulness of the result.

  • PDF

Assessment of Interruption Costs on the Industry Load through Using the Microscopic Method (미시적 방법을 이용한 산업체 수용가의 공급지장비용 함수(SCDF) 산정)

  • Kim, Yong-Ha;Lee, Pyong-Ho;Kim, Young-Gil;Sin, Hyung-Chul;Oh, Seok-Hyun;Woo, Sung-Min
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.25 no.4
    • /
    • pp.88-96
    • /
    • 2011
  • This paper assesses interruption costs on the industry load through using the microscopic method. For assessment, the questionnaire was made on Korea Standard Industry Categorization which is composed of 28 type of industry Then, the survey was distributed to 1889 business in 12 area by staffs of KEPCO. The collected data is changed to the trustworthy data by using Bad Data Selection method and then the interruption costs of industry load was calculated by Tobit Regression which is tool analysing both collected data and the others.

Evaluation of Power Quality Cost Based on Value-Based Methodology and Development of Unified Index (가치산정법에 의한 전력품질비용 산정 및 단일화지수의 개발)

  • Lee, Buhm;Kim, Kyoung-Min
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.7
    • /
    • pp.1293-1298
    • /
    • 2011
  • This paper presents an Unified Index which can evaluate a performance of a distribution system based on value-based methodology. Reliability cost and voltage sags cost are calculated for each load point using Reliability Sector Customer Damage Function(SCDF). Aging cost is calculated for each load point using Aging SCDF. Power loss cost and operation cost are calculated for the system. By summation of each cost of load point and system, power quality cost can be obtained. Finally, this paper developed an unified index which can show the performance of a distribution system. Presented method has been applied to a real system, the usefulness of the method has been verified.

A Study on Distribution System Assessment and Interruption Cost Calculation for the Industry Load by the Analytic Approach Method (해석적방법론에 의한 산업용 수용가의 공급지장비 산정 및 배전계통에의 적용)

  • Kim, Yong-Ha;Woo, Sung-Min;Baek, Byum-Min;Sin, Hyung-Chul;Park, Chang-Kyu
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.23 no.4
    • /
    • pp.47-55
    • /
    • 2009
  • This paper estimates interruption cost assessment for industrial load. For executing In this way first, we research customer interruption cost(CIC) for industrial load about 1,026 unit. And to assess industrial load in D/L calculate sector customer damage function(SCDF) using CIC. Second, we compute distribution reliability through annual failure rate, repair time and so on, and then, Third, distribution system that calculate VBDRA for industrial load per alternative assesses interruption cost.

Development of Outage Cost Impact Index Function of Electricity Energy and Outage Cost Assessment using WOROCAIS (전력에너지 공급지장비의 충격도지수 함수개발 및 WOROCAIS를 이용한 이의 추정에 관한 연구)

  • Lim, Jin-Taek;Choi, Jae-Seok;Jeon, Dong-Hoon;Seo, Chul-Soo;Lee, Jae-Gul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.8
    • /
    • pp.1066-1073
    • /
    • 2013
  • This paper illustrates newly an outage cost impact index function(OCIIF). The assessment of the OCIIF is described using the Web Based Online Real-time Outage Cost Assessment and Information System(WOROCAIS) for power system outage cost assessment in Korea. The proposed OCIIF is not absolute but relative outage cost impact index function in view point of outage time using web based survey method for outage cost assessment. While conventional methodology does not consider short time outage cost assessment, the proposed OCIIF reflects short time outage. SCOF(Sector Customer Outage Function) in stead of the traditional SCDF(Sector Customer Damage Function) is defined and proposed newly in this paper. Based the SCOF, AVLL(Average Value of Loss Load) is newly proposed. The OCIIF is demonstrated by WOROCAIS in case study around 2,000 sample data surveyed by KEPCO in South Korea in recent.