• Title/Summary/Keyword: Road field

Search Result 1,206, Processing Time 0.033 seconds

Study on collapse mechanism and treatment measures of portal slope of a high-speed railway tunnel

  • Guoping Hu;Yingzhi Xia;Lianggen Zhong;Xiaoxue Ruan;Hui Li
    • Geomechanics and Engineering
    • /
    • v.32 no.1
    • /
    • pp.111-123
    • /
    • 2023
  • The slope of an open cut tunnel is located above the exit of the Leijia tunnel on the Changgan high-speed railway. During the excavation of the open cut tunnel foundation pit, the slope slipped twice, a large landslide of 92500 m3 formed. The landslide body and unstable slope body not only caused the foundation pit of the open cut tunnel to be buried and the anchor piles to be damaged but also directly threatened the operational safety of the later high-speed railway. Therefore, to study the stability change in the slope of the open cut tunnel under heavy rain and excavation conditions, a 3D numerical calculation model of the slope is carried out by Midas GTS software, the deformation mechanism is analyzed, anti-sliding measures are proposed, and the effectiveness of the anti-sliding measures is analyzed according to the field monitoring results. The results show that when rainfall occurs, rainwater collects in the open cut tunnel area, resulting in a transient saturation zone on the slope on the right side of the open cut tunnel, which reduces the shear strength of the slope soil; the excavation at the slope toe reduces the anti-sliding capacity of the slope toe. Under the combined action of excavation and rainfall, when the soil above the top of the anchor pile is excavated, two potential sliding surfaces are bounded by the top of the excavation area, and the shear outlet is located at the top of the anchor pile. After the excavation of the open cut tunnel, the potential sliding surface is mainly concentrated at the lower part of the downhill area, and the shear outlet moves down to the bottom of the open cut tunnel. Based on the deformation characteristics and the failure mechanism of the landslides, comprehensive control measures, including interim emergency mitigation measures and long-term mitigation measures, are proposed. The field monitoring results further verify the accuracy of the anti-sliding mechanism analysis and the effectiveness of anti-sliding measures.

A Study on Design Standard for Paddy Field Ramp (수도 포장진입로의 설계기준에 관한 연구)

  • 김병갑;이중용;신승엽;김학주;이용복
    • Journal of Biosystems Engineering
    • /
    • v.26 no.6
    • /
    • pp.517-524
    • /
    • 2001
  • Steep and narrow ramp installed in the paddy field makes it difficult and sometimes dangerous to drive agricultural machines on it. Because agricultural machinery become larger and heavier, it is necessary to revise design standard for ramp to provide safe travel. This study was conducted to revise the design standard fur paddy field ramp, especially for its width and slope. A mathematical model predicting travelling path of a tractor on paddy field ramp and farm road was developed and simulated. To verify this model, field tests were carried out. The model could predict trvelling path with RMS Error of 12.5cm and 8.2cm, which were judged to be adoptable fur determining the width of paddy field ramp. By applying this model to 110ps tractor, which was assumed to be the largest tractor in Korea, width of paddy field ramp was determined as over 3.6m. The slope of paddy field ramp, which provided tractor with 10% of the total weight of the tractor and the mounted implement as reaction force at front wheel against ground was analyzed by considering weight transfer effect on a ramp. The result showed that adequate slope of paddy field ramp was 14°.

  • PDF

Planning of Alternative Forest Road Network Using GIS (GIS를 이용한 대안별 임도노망의 계획에 관한 연구)

  • Jeon, Kwon-Seok
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.11 no.1 s.24
    • /
    • pp.21-28
    • /
    • 2003
  • This study was aimed at suggest a proper planning method to select a optimal forest road network in mountains forest using GIS(Geographic Information System). To examine the field applicability, the method was applied to the National Forest at Mt. Kumsan in Namhae-gun, Gyungsangnam-do. The main results from altogether six alternative road route plans were derived from these criteria obtained the alternative route plan No.2 has two layout criteria, longitudinal gradient and earth work volume, and it showed similar pattern of existing forest road network which was designed mainly ground slope and longitudinal gradient. The alternative route plan No.6 has four criteria, longitudinal gradient, earth work volume, investment effect and landscape impact. It was different for the lowest forest road density among the alternatives and the pattern of the forest road layout was radial form, which was also quite different to other alternatives. For optimal forest road network planning, GIS provide the efficient and resonable solutions for decision making to provide the support for evaluation about various alternative road networks. If detailed inventory and relevant data are provided and also clear and objective indicators for evaluations are set up, it could be applied to preliminary analysis and detail planning stage to prevent undesirable effect such the land slide and soil erosion due to inadequate planning for forest road network.

  • PDF

Evaluation of Surface Temperature Variation and Heat Exchange Rate of Concrete Road Pavement with Buried Circulating Water Piping (열매체 순환수 배관이 매설된 콘크리트 도로 포장체의 표면 온도 변화와 방열량 평가)

  • Byonghu Sohn;Yongki Kim
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.19 no.3
    • /
    • pp.1-13
    • /
    • 2023
  • Hydronic heated road pavement (HHP) systems have been well established and documented to provide road safety in winter season over the past two decades. However, most of the systems run on asphalt, only a few are tested with concrete, and there rarely is a comparison between those two common road materials in their performance. The aim of this study is to investigate the thermal performance of the concrete HHP systems, including surface temperature variations of experimental pavements in winter season. For preliminary study a small-scale experimental system was installed to evaluate the heat transfer characteristics of the concrete HHP in the test field. The system consists of 3 concrete slabs made of 1 m in width, 1 m in length, and 0.25 m in height. In these slabs, circulating water piping was embedded with different pipe depths of 0.08 m (Case A), 0.12 m (Case B), and 0.20 m (Case C) and same horizontal space of 0.16 m. Heating performance in winter season was tested with different inlet temperatures of 25℃, 30℃, 35℃ and 40℃ during the entire measurement period. Overall, the surface temperature of the concrete HHPs remained above 3℃ in all experimental conditions applied in this study. The results of the surface temperature measurement with respect to the pipe depth showed that Case B was the highest among the three cases. However, the closer the circulating water pipe was to the pavement surface, the greater the heat exchange rate. This results is considered that the heat is continuously accumulated inside the pavements and then the temperature inside the pavements increases, while the amount of heat dissipation decreases as the temperature difference between the inlet and outlet of circulating water decreases. In this preliminary test the applicability of the concrete HHP on road deicing was confirmed. Finally, the results can be used as a basis for studying the effects of various variables on road pavements through numerical analysis and for conducting large-scale empirical experiments.

Motion Field Estimation Using U-disparity Map and Forward-Backward Error Removal in Vehicle Environment (U-시차 지도와 정/역방향 에러 제거를 통한 자동차 환경에서의 모션 필드 예측)

  • Seo, Seungwoo;Lee, Gyucheol;Lee, Sangyong;Yoo, Jisang
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.40 no.12
    • /
    • pp.2343-2352
    • /
    • 2015
  • In this paper, we propose novel motion field estimation method using U-disparity map and forward-backward error removal in vehicles environment. Generally, in an image obtained from a camera attached in a vehicle, a motion vector occurs according to the movement of the vehicle. but this motion vector is less accurate by effect of surrounding environment. In particular, it is difficult to extract an accurate motion vector because of adjacent pixels which are similar each other on the road surface. Therefore, proposed method removes road surface by using U-disparity map and performs optical flow about remaining portion. forward-backward error removal method is used to improve the accuracy of the motion vector. Finally, we predict motion of the vehicle by applying RANSAC(RANdom SAmple Consensus) from acquired motion vector and then generate motion field. Through experimental results, we show that the proposed algorithm performs better than old schemes.