• Title/Summary/Keyword: Road construction site

Search Result 271, Processing Time 0.027 seconds

A Study on Development Directions of Environment-Friendly Cheonghak Waterfront Park through Surveys

  • Lee, Myung-Kwon
    • Journal of Navigation and Port Research
    • /
    • v.32 no.4
    • /
    • pp.315-320
    • /
    • 2008
  • The road construction near the existing lighter's wharf has completed but the lighter's wharf has been still unavailable and neglected. Therefore, the site needs the urgent measures to clean up and properly take advantage of the lighter's wharf. This study sought to improve the regional amenities and revitalize the coastal environment by creating an environment-friendly waterfront park utilizing features of the existing lighter's wharf as part of improvement measures. In addition, surveys were conducted to develop an waterfront park capable of effectively using the land and improving the cleanliness and safety of the coastal scenic beauty, leading to various meaningful opinions on the residents' awareness of the potential park site, the facilities necessary for the park, the development directions of the park and the timing of park development. If an waterfront park is created through the residents' participation, It can share a sustainable utility value of the coastal area. Therefore, this will result in boosting the connection with redevelopment plan for the North Port, along with improving the quality of the residents' life, strengthening Busan's status as a maritime tourism city.

Strategies for Minimizing Forest Disturbance During the Construction of Power Transmission Towers (송전선로 건설에 따른 산림훼손의 최소화 관리방안)

  • 이동근;강현경
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.30 no.6
    • /
    • pp.66-78
    • /
    • 2003
  • The purpose of this study was to minimize the forest disturbance around an entry road of a power transmission tower construction site between Taean and Sinsesan, Chungnam. The main study field was classified into existing materials and a GIS, remote sensing analysis, and a field examination. This information was used to identify the most suitable entry road using a degree of green naturality map, eco-naturality map, actual vegetation map, and a forest state map as the existing materials. Also, the study used an normalized difference vegetation index, altitude and slope map in order to make the evaluation materials which used an remote sensing image, and GIS. This data was used to choose an optimum area, and diagnosed the current condition of the vegetation with a field survey of the area. It analyzed vegetation structure, species diversity, the age of trees in a field examination. Subsequently, we proposed four area types based on the analysis results--preservation area, transplantation area, restoration area and development area. As a result, the preservation area was categorized into 8 grades, according to the degree of green naturality, large area of breast diameter at Pinus densiflora community, competition area of Pinus densiflora and Quercus spp. and Quercus spp. community of over 20 years old. A transplantation area established 46 optimum areas according to the GIS analysis and vegetation investigation results. Vegetation restoration plan for disturbance area should be made based on ecological value of existing vegetation to worthwhile area as Quercus spp. mixing forest proposed. The development area selected a ecological worthless place as an artificial forest where Pinus densiflora and Pinus thunbergii growth is poor. This research results suggest that restoration of vegetation will be possible in the real world. Also, ecological restoration guidelines will be made through building and analyzing data base and routine monitoring of transplantation and restoration area.

Electrical Resistivity Imaging for Upper Layer of Shield TBM Tunnel Ceiling (쉴드 TBM터널 상부 지반 연약대 전기탐사)

  • Jung, Hyun-Key;Park, Chul-Hwan
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.401-408
    • /
    • 2005
  • Recently shield TBM tunnellings are being applied to subway construction in Korean cities. Generally these kinds of tunnellings have the problems in the stability of ground such as subsidence because urban subway is constructed in the shallow depth. A sinkhole occurred on the road just above the tunnel during tunneling in Kwangju, so a survey for upper layer of the tunnel was needed. But conventional Ground Probing Radar can't be applicable due to the presence of steel-mesh screen in the shield segment, so no existent geophysical method is applicable in this site. Because the outer surface of each shield segment is electrically insulated, dipole-dipole resistivity method which is popular in engineering site investigation, was tried to this survey for the first time. Specially manufactured flexible ring-type electrodes were installed into the grouting holes at an interval of 2.4 m on the ceiling. The K-Ohm II system which has been developed by KIGAM and tested successfully in many sites, was used in this site. The system consists of 1000Volt-1Ampere constant-current transmitter, optically isolated 24 bit sigma-delta A/D conversion receiver - maximum 12 channel simultaneous measurements, and graphical automatic acquisition software for easy data quality check in real time. Borehole camera logging with circular white LED lighting was also done to investigate the state of the layer. Measured resistivity data lack of some stations due to failing opening lids of holes, shows general high-low trend well. The dipole-dipole resistivity inversion results discriminate (1) one approximately 4 meter diameter cavity (grouted but incompletely hardened, so low resistivity - less than $30{\Omega}m$), (2) weak zone (100-200${\Omega}m$), and (3) hard zone (high resistivity - more than 1000${\Omega}m$) very well for the distance of 320 meters. The 2-D inversion neglects slight absolute 3-D effect, but we can get satisfactory and useful information. Acquired resistivity section and video tapes by borehole camera logging will be reserved and reused if some problem occurs in this site in the future.

  • PDF

Cases of Excavation Methods for Crossing Railway and Road (철도 및 도로 횡단공법 시공 사례)

  • Kim Dong joon;Park Yung ho;Lee Yoon bum;Lee Euncheol
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.429-435
    • /
    • 2003
  • This paper presents the case studies of Tubular Roof construction Method(T.R.c.M) and Semi Shield method, which were applied to the tunnel excavation under the pre-existing railways. It was proved that T.R.c.M was an effective and safe method for the tunnel excavated in soft soil, giving little damage to the railways located a few meters above. Semi Shield was also performed successfully to bore a tunnel in soft and hard rock, minimizing the ground settlement and tilting of vulnerable fuel tanks. Site and soil conditions are also discussed, which led these relatively new methods to success. Finally, comparison of the measurement results and the design values are made to verify and improve the current design practice.

  • PDF

Geotechnical characteristics of the collapsed $\bigcirc\bigcirc$tunnel slope in Yeosu-Suncheon area (여수-순천 도로확장공사 구간 $\bigcirc\bigcirc$터널 붕괴사면 지반특성)

  • Kim, Seung-Hyun;Koo, Ho-Bon;Lee, Jeong-Yup;Rhee, Jong-Hyun;Kim, Seung-Hee
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.848-857
    • /
    • 2008
  • In September 2007, the collapses of slopes and landslides are happened at Jeonlanamdo due to heavy rains accompanied with Typoon "Nari". The study area is the tunnel portal slope in new road construction site. This slope consists of pyroclastic rocks and has lots of faults. Particularly, the residual soils of the slope is deteriorated with yellowish mudstone layer as a results of chemical and physical weathering. This has a variety of swelling clay minerals and might be moved easily down at the gentle terrain. The inner factor of $\bigcirc\bigcirc$tunnel portal slope's collapse is the geological weak zone, the convergent topography, the inferiority of drainage and the heavy rain act on the failure as direct trigger.

  • PDF

Dose-response relationship for annoyance caused by combined noise sources in urban spaces (외부 공간에서 복합소음에 대한 불쾌감 연구)

  • Lee, Pyoung-Jik;You, Jin;Jeong, Choong-Il;Yeon, Jun-Oh;Jeon, Jin-Yong
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2008.04a
    • /
    • pp.264-267
    • /
    • 2008
  • Relationship between exposure to combined noise sources and community annoyance have been investigated. Social surveys were conducted in urban spaces near the construction site with road traffics. The question relating to noise annoyance was answered on an 11-point numerical scale and 5-point verbal scale according to ISO 15666. The questionnaire also contained demographic factors, interference with daily activities, health-related symptoms, and noise sensitivity. Noise levels were measured in terms of A-weighted equivalent level ($L_{Aeq}$), and noise mapping technique was applied to predict the noise levels of urban spaces. Synthesis curves for the relationship between noise levels and percentage highly annoyed for combined noise sources were derived, and compared to the curves from a single noise source.

  • PDF

A Study on Site investigation for Cut Slope Management Manual preparation (절토사면 유지관리 매뉴얼 작성을 위한 현장조사에 관한 연구)

  • Ji, Young-Hwan;Chang, Buhm-Soo;Kim, Yong-Soo;Lee, Jong-Young
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.825-830
    • /
    • 2005
  • Cut slope and facility of management investigation is the protection of humans and properties. it is very important the prevention of disaster facility and the damage of the slope protection facility. It is very difficult to forecast slope stability, disaster possibility and collapse. It will be able to minimize the damage which it prepare against slope facility and cut slope of deformable investigation and collapse and the disaster. therefore those deformable investigation is important. Investigations execute upheaval, crack, sliding for slope and cut slope reinforcement. Investigation executes forecast in place where the construction problem, the effect which the damage in road traffic or the contiguity facility.

  • PDF

Official Development Assistance and Environmental Assessment (공적개발원조사업(Official Development Assistance)의 방향과 환경평가)

  • Lee, Jong Ho
    • Journal of Environmental Impact Assessment
    • /
    • v.23 no.1
    • /
    • pp.51-65
    • /
    • 2014
  • ODA projects such as multi-purpose dam, industrial complex, road construction etc. have resulted in environmental damage and resident relocation including destruction of site of living. Even the grandiose developments as ODA projects have made clear the value clashes between development and environmental conservation, and have brought about conflicts between public interests and public environmental right, and the discordance between public interests and private property rights in the recipient country. This study summarizes and analyses the Korea's ODA projects and will suggest the public participation and governance system based on Saemaul Movement, Strategic Environmental Assessment and Environmental Impact Assessment based on the guideline of OECD DAC, and emphasize Strategic Environmental Assessment and Social Impact Assessment in the procedure of ODA projects. In the future the ODA project should be implemented for the overcome of poverty and response to climate change based on the experience and trial and errors of Korea's compact growth and past ODA projects.

Application of TSP Suvey to Predict the Ground Conditions Ahead of Tunnel Face (터널막장 전방 파악을 위한 TSP(Tunnel Seismic Prediction) 탐사 사례 연구)

  • Cho, Sung-Won;Lee, Hyo;Yoo, Jae-Won;Kim, Do-Hun Dave;Nam, Seung-Hyeok
    • Explosives and Blasting
    • /
    • v.31 no.2
    • /
    • pp.40-49
    • /
    • 2013
  • To predict ground conditions ahead of the tunnel face, seismic refraction survey has been widely used. But due to the development in seismic equipment and techniques, tomography using borehole and others are actively applied in recent years. This study has a purpose to prevent stability problems during excavation and construction of tunnels by predicting unfavorable ground conditions such as fault, fractured zone and rock quality variation zone ahead of the tunnel face using TSP survey equipment. In this study, the validity of predicting ground conditions ahead of tunnel face by TSP survey has been evaluated through the case study in the road construction site.

A Study on Development of Modular System using Light-weighted Structure Members (경량형강을 사용한 모듈러 시스템 개발에 관한 연구)

  • Zheng, Sheng-Lin;Ju, Gi-Su;Park, Sung-Moo
    • Proceeding of KASS Symposium
    • /
    • 2008.05a
    • /
    • pp.43-48
    • /
    • 2008
  • The object of this paper is to evaluate on constructability of modular steel frame with the hollow structural steel section to LEB C-shape. A modular building is built with factory-manufacture and site-construction. The advantage of a Modular building presents that enhanced building quality, shortened construction period and easy at an expansion and enlargement for buildings but also has demerits such as size restriction of the modular units according to the Road Traffic Law and Inflexibility of the unit composition. So in this study we use light-weighted structure members with bolted joint for easy Knock-down and traffic, also we evaluated the constructability of this bolted joints type modular buildings.

  • PDF