국내 발주지침 보완을 통한 토목분야 BIM 활성화 전략 제안 - 도로분야 BIM 프로젝트 지원을 위한 과업지시서 구성요소 제안 - (Proposing a BIM Activation Plan in Civil Projects by Investigating Guidelines in Procurement Processes - Proposing Contents of Guidelines to Support BIM Project in the Road Sector -)

  • 최고은;이재욱;홍창희;문현석;김도영
    • 한국BIM학회 논문집
    • /
    • 제13권2호
    • /
    • pp.47-57
    • /
    • 2023
  • The purpose of this study is to propose a guideline to help the client and bidder operate the BIM project in the domestic road field. As BIM design is mandatory in the construction field, documents disclosed by the ordering agency must essentially include procedures and step-by-step requirements to support BIM. The purpose of this study is to propose the structure and components of the guidelines that practitioners need practically by utilizing the currently announced road field guidelines. The guidelines are analyzed based on the procurement documents that were pre-emptively shared overseas, and supplemented according to the domestic situation. Furthermore, the effectiveness of the revised guidelines is confirmed through expert consultation. This study aims to contribute to creating an environment in which construction practitioners who have no experience in BIM project can efficiently carry out BIM projects.

Variation Determinants in Building Construction: Ghanaian Professionals Perspective

  • Asamaoh, Richard Oduro;Offei-Nyako, Kofi
    • Journal of Construction Engineering and Project Management
    • /
    • 제3권4호
    • /
    • pp.20-25
    • /
    • 2013
  • Variation in construction means modification of design, changes in quality, quantity of work including the alteration of standard of materials or goods to be used in the work and the removal from site any kind of material not in accordance in the contract. In Ghana, Variation order has become major issue in the construction industry. This had resulted in cost overruns, delay and in some contracts dispute, between parties. The aim of this paper was to identify the root causes of variation; effects of variations on projects in Ghana and the means of reducing the impact of variation order. The method of the study involved literature review, primary data collection, interview and closed - ended- questionnaires. Mean Scores Method was used to rank the identified factors causing variation. Analysis Of Variance Test was use to test for the significant difference between means among the professional groups. The study revealed that most causes of variation were change of design by client and inadequate working details. Establishment of oversight project management committee and flow of information were identified as means of controlling variations during project administration.

Risk Ranking for Tunnelling Construction Projects in Malaysia

  • Ghazali, F.E. Mohamed;Wong, H.C.
    • Journal of Construction Engineering and Project Management
    • /
    • 제4권1호
    • /
    • pp.29-36
    • /
    • 2014
  • Tunnelling has become a preferred method of construction for road and highway projects in countries with a lot of hilly slope geological conditions such as found in Malaysia. However the construction works of a tunnelling project are usually complicated and costly, which consequently impose great risks to the parties involved. This paper identifies the key significant risks and sub-risks for tunnelling construction projects in Malaysia through a case study. Interview has been used as the solitary means to determine the significant risks from contractor's eleven key project personnel who were directly involved in the tunnelling construction such as consultant, construction manager and tunnel engineers. The importance of the risks identified is then prioritised and ranked via the Analytic Hierarchy Process (AHP)'s pairwise comparison approach to determine their criticality towards a successful delivery of project. As a result, three key risks have been identified as significant for the tunnelling case study project, namely health and safety, cost overrun in construction and time overrun in construction. Two sub-risks each of the latter categories, which are cost underestimation and unforeseen events (cost overrun in construction) as well as plant and machinery failure and delay in material delivery (time overrun in construction), have occupied the top five overall risk ranking.

도로공사 대표공종의 생산성 정보 개발에 대한 연구 (A Study on the Development of Work-Crew based Daily-Productivity for Representative B.O.Q Item in Road Project)

  • 서지형;박형근
    • 한국건설관리학회논문집
    • /
    • 제12권6호
    • /
    • pp.42-53
    • /
    • 2011
  • 2004년 예정가격 산정방법으로 실적공사비 적산제도가 본격적으로 시행되면서 상대적으로 표준품셈 적산제도의 적용이 하락하였다. 그러나 2010년 하반기 예정가격 산정시 표준품셈 적산제도의 적용비중은 45%이며, 여전히 높은 적용비중을 유지하고 있다. 현행 표준품셈은 예정가격의 산정에 과도한 시간이 소요되고, 시공계획과 자원분배에 적용하기 어려운 단점이 있다. 이와 같은 단점을 개선하기 위하여 본 연구에서는 국내외 품셈의 형식을 고찰하여 이를 국내 도로분야 대표공종에 적용하여 기존 품셈을 일단위 작업조 기반 생산성 정보로 산출하여 유사한 조건하에서 일본 미국의 생산성 정보 및 현장자문을 통한 정보와 비교하였다. 본 연구를 통해 적용된 작업조기반 생산성 정보 산출 방법과 산출 정보의 효용성을 확인하고자한다. 이러한 과정을 통하여 표준품셈을 통한 작업조기반 생산성 정보 산정 방법'과 일단위 작업조 기반 생산성 정보를 제시하고자 한다.

효율적인 고속도로 유지관리를 위한 민간자본 활용방안 연구 (A Study on Utilization of Private Capital for Efficient Highway Pavement Management)

  • 이인범;이용준;박삼재;조현제;이민재
    • 한국건설관리학회논문집
    • /
    • 제19권1호
    • /
    • pp.3-11
    • /
    • 2018
  • 본 연구에서는 효율적인 도로 유지관리를 위한 적극적인 민간의 참여방안을 위해 도로시설 개량사업 추진현황 및 현 추진 중인 민간자본 활용 개량사업의 개선사항을 검토하고, 이를 바탕으로 새로운 사업방식이 적용된 사례조사, 재무적 타당성 분석 업무 등을 수행하여 적용 가능한 사업방식을 선정하였다. 분석 결과, 현 추진 중인 민간자본 활용 개량사업의 민간방식보다 크라우드 펀딩을 활용한 방식이 비용측면에서 가장 유리한 것으로 분석되었으며, 고속도로 이용자, 특히 개량공사 구간 이용자로부터 자금을 조달 한다는 점에서 활용효과가 높을 것으로 판단된다. 또한 공사로 인해 불편을 겪는 도로이용객에게 도로공사가 얻는 통행료 이익을 사용자에게 환원한다는 의미도 부여할 수 있다.

편익귀속을 고려한 철도사업의 평가방법론에 대한 고찰 (Review of Railway Projects Evaluation Methodologies considering the Benefit Incidence)

  • 정병두;박정욱;김경철
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 1999년도 추계학술대회 논문집
    • /
    • pp.65-72
    • /
    • 1999
  • In this paper, we reviewed the evaluation methodologies of railway project considering the benefit incidence. Generally railway projects are much more reduced tile energy consumption, traffic accident and environmental pollution than road projects. But conventional B/C analysis of railway project does not measured including those benefits. Also there is a few attention to an incidence of benefits producing from railway construction. So we developed the evaluation method of railway project contained the railway oriented benefits and also considered of the benefit incidence producing from railway construction.

  • PDF

A Study on Analyzing the Factors Affecting Environmental Loads in the Planning Stage of Korean National Highway Projects

  • Park, Jin-Young;Park, June-Seok;Kim, Myeong-Jin;Kim, Sang-Ryong;Kim, Byung-Soo
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.508-512
    • /
    • 2015
  • Carbon emission calculation guidelines provided by the Korean Ministry of Land, Infrastructure and Transportation (MOLIT) and existing environmental load assessment studies have suggested a method for estimating based on the volume determined after the design development. Therefore they are not being helpful in the decision making of the environmental economics of road facilities in the planning stage in which specific information on construction output volume is lacking. Based on literature analysis of existing studies and consultation from a group of construction environmental professionals, 12 types of property information considered to be related to environmental load were selected from an inventory of information that will be available in the road planning stage. In addition, multiple regression analysis was performed based on the environmental load computed through the life cycle assessment (LCA) of 40 national highway project cases of Korea to deduce five impact factors of environmental load in the road facilities planning stage.

  • PDF

다(多)공구 도로 공사 현장 장비들의 운영 실태 파악을 위한 생산성 지표 정립에 관한 연구 (Formalization of Productivity Metrics for Equipment in Multi-sectioned Road Construction Projects)

  • 김홍열;구본상
    • 한국건설관리학회논문집
    • /
    • 제13권4호
    • /
    • pp.100-109
    • /
    • 2012
  • 도로사업현장의 특징은 인접 공구간 비슷한 공종과 공기를 가지고 유사한 장비 자원을 사용하는 다(多)공구 현장이라는 것이다. 그러나 현재 도로현장들은 각 공구의 개별 기성에 취중한 '칸막이식' 운영에 의해 지속적으로 수급불균형상태가 발생하여 고가의 장비들이 비효율적으로 운영되는 것으로 드러났다. 본 연구에서는 다공구현장 내의 장비들을 적시적소에 공구간 공유하여 전체 사업의 자원 활용도를 높일 수 있는 자원공유시스템을 정립하고자 한다. 본 논문은 그 첫 단계로써 도로사업현장에서 장비의 생산성과 그 운영 실태에 대한 연구내용을 중점적으로 소개한다. 현장의 자원운영실태 파악을 위한 설문을 통해서 다공구 도로현장의 자원공유시스템 도입에 필요한 공유적합자원표를 얻었으며, 다공구 현장의 자원활용도 측정을 위해서는 계획편차(DPR), 정규화계획편차(nDPR), 수급불균형지수(SDI)등의 공식을 새롭게 고안하였다. 이들 공식을 실제 도로현장의 작업일지 데이터에 적용하였으며, 그 결과 각 공구별 nDPR값과 SDI값을 얻었다. 분석결과 도로사업현장의 자원운영은 추가임대와 유휴자원이 계속적으로 발생하는 비효율적인 운영임을 파악하였다. 또한 공구별로 부족/유휴 상태가 골고루 발생하여 공구간 장비를 공유할 경우 상쇄효과를 통해 장비의 생산성이 높아질 것을 간접적으로 파악할 수 있었다. 본 논문에서 도출된 결과들은 추후 자원공유시스템 정립의 기초자료로 활용 가능할 것으로 판단된다.

공공 도로건설사업에서의 설계도서 납품체계 개선방안에 관한 연구 (A Study on Improvement Measures for the Design Documents Delivery System in Public Road Construction Projects)

  • 옥현;김성진;김태학;주기범
    • 한국도로학회논문집
    • /
    • 제20권2호
    • /
    • pp.45-55
    • /
    • 2018
  • PURPOSES : This study aims to survey and analyze the status of the design and completion documents output delivery system in public construction projects in order to assess the problems of the Ministry of Land, Infrastructure and Transport (MOLIT)'s electronic delivery system, with a focus on roads and rivers, and to offer improvement measures. METHODS : This study first surveys and analyzes laws and existing study trends with regard to the design and completion documents output delivery system in public construction projects. It further analyzes the status of the output delivery system in public construction projects, including roads, rivers, expressways, water resources, and railroads. In addition, a comparative analysis of the current electronic delivery system of MOLIT and Korea Expressway Corporation in the road field is conducted, and the problems and improvement measures for MOLIT's electronic output delivery system are presented. This study seeks to analyze problems and prepare improvement measures with regard to road and river public construction projects, as ordered by MOLIT's five regional offices. RESULTS : This study sought to prepare the electronic output delivery system with regard to public construction projects and present the analysis of its major problems and improvement measures in four categories: "the preparation of electronic design documents output delivery system improvement measures including inspection and delivery," "preparation of guidelines, systems, etc., concerning electronic design documents," "preparation of improvement measures for the construction project management system and electronic design document support tools", and "linking of MOLIT's electronic output delivery system with relevant agencies and the expansion thereof to local governments." CONCLUSIONS : This study analyzed the current status and problems of the MOLIT's electronic output delivery system in the field of road and river construction projects, and presented corresponding improvement measures. This study is expected to address the problems of the MOLIT's electronic output delivery system, and to provide the foundation for the preparation of an efficient electronic output delivery system for design and completion documents. In addition, this study is expected to boost the quality and utilization of the electronic design documents output, and to exchange, share, and link construction information among relevant agencies so as to prepare the foundation for sharing construction information.

다(多)공구 도로 건설 현장의 장비 공유시스템 구축을 통한 생산성 향상에 관한 연구 (Improving Road Construction Productivity by Developing a Programmatic Resource Distribution System for Equipment Sharing in Multi-sectioned Road Construction Projects)

  • 구본상
    • 한국건설관리학회논문집
    • /
    • 제14권3호
    • /
    • pp.134-145
    • /
    • 2013
  • 국내에서 시행되는 대형 도로건설사업은 공구별로 분리 발주되고 개별 시공사는 단절된 형태로 시공을 하게 된다. 공구별 공종 및 활용 장비는 유사하나, 공구 간 장비의 공유는 비공식적이고 부분적으로만 일어난다. 이로 인해 도로 현장에서 사용되는 고가의 장비들은 낮은 가동률을 보이며 임대비용이 공사비의 높은 비중을 차지한다. 본 연구에서는 린 건설과 프로그램 매니지먼트의 이론에 근거하여 개별 공구에서 발생하는 유휴 및 부족 장비를 전체 사업 차원에서 공유함으로서 장비 생산성을 향상 시킬 수 있는 방안을 모색하였다. 개발된 장비공유시스템은 정의된 기준(최단거리, 연속성, 빈도 및 일대일) 및 일련의 절차에 따라 공구들의 장비 수급현황을 바탕으로 비용을 최소화하면서 가동률을 높여주는 조건하에 두 공구 간 장비의 매칭(matching)을 자동화해준다. 본 시스템을 실제 도로공사 현장 4개 공구에 3개월 간, 3개 장비를 대상으로 시뮬레이션을 실시한 결과, 다공구에서의 생산성을 측정하는 지표인 nDPR이 향상되었으며, 장비 비용 또한 4.45% 개선되었다. 더불어, 공유횟수가 많은 장비일수록 nDPR 및 비용이 비례적으로 개선되는 것을 관찰할 수 있어 장비의 공유를 통한 긍정적 효과를 입증하였다. 본 연구의 결과는 개별 사업이 아닌 전체사업 차원의 관리를 통해 증대되는 사업 가치를 정량적으로 제시함으로서 프로그램 차원의 사업관리모델을 조기 도입하는데 일조할 수 있을 것으로 사료된다.