• Title/Summary/Keyword: Road construction plan

Search Result 227, Processing Time 0.023 seconds

A Review of Instrumentation System and Construction of Korea Highway Test Road (시험도로 건설과 계측시스템 구축)

  • 최준성;김도형;김성환
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.11a
    • /
    • pp.603-606
    • /
    • 2000
  • The cost needed for the construction and management of highways in the whole nation is rapidly growing so the research that can decrease the cost is required. However, most of the highway specs have simply converted from those of other countries, including USA. Therefore, some of our design and construction specs were not the optimum ones based on our own situation, requiring a research under the actual traffic and environment of our nation. The use of test road develops many aspects of highway engineering. Those are evaluation of construction materials, a general overview of korea pavement design and serviceability under the actual traffic and environmental condition of the nation. It is also economical and efficient compared to the trial construction of each item in spreaded form. A test road, 7.7km long with two lanes, is being constructed on the Inner Central Expressway. In this test road, 2.7km is planned for asphalt pavement and 3.4km is planned for concrete pavement. Three test bridges and five earth retaining structures will be included in the test road. Based on the master plan, the major performance was progressing such as detailed research modules of each area, preliminary research for the future research, sensor surveys for the behavior analyses of pavements and structures with installation methods and data acquisition systems, the foundation research of Integrated Instrumentation System and the Management Plan for automated measurement. Some area(structure research division, geotechnical research division) was designed the instrumentation plan because some instrument sensors must be installed during the construction of the test road. And then the instrumentation plan of each area was enforcing because a large majority of the instrument sensors must be installed after the construction of the test road. The field surveys with material property tests and pilot instrumentation test with sensor tests was also performing in accordance with the construction in the field.

  • PDF

The Mid-long Range R&D Planning of Railway Technology and Policy Recommendations (철도기술 연구개발 중장기계획수립($2008{\sim}2012$)결과와 정책적 시사점)

  • Park, Man-Soo;Park, Su-Dong;Yu, Sung-Yun;Kim, Jong-Wook
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1796-1816
    • /
    • 2007
  • Recently, started to apply a strategy of selection and concentration in the construction and transportation R&D for the effective utilization of limited R&D resources. The department of construction and transportation planned the construction and transportation R&D innovative road map by the future 10 years technical requirement under the first year on the innovation of the construction and transportation technology from last year. The innovative road map which is a strategic and long term master plan integrated a construction and transportation suggested a vision as value createar for a improvement of living quality in the future. And made a specific goal that is the seventh construction technology level and the fifth transportation technology level in the world. The department of construction and transportation is planning a mid- long range planing of the construction and transportation R&D as following measurement of innovative road map. KICTEP and KISTEP planned a mid- long range R&D planing of the transportation system, logistics, aviation, railway for the last year. Introducing a methodology used a mid- long range plan and main results of the future railway R&D plan. And suggesting a politic comments for the effectively propelling railway R&D projects.

  • PDF

A Critical Assessment of the Economical Value of Road on Housing Prices Using Contingent Valuation Method - focus on the road construction plan of 47th of Suwon si - (조건부가치추정법을 이용한 도로의 경제가치 추정에 관한 실증적 연구 - 수원시 47번 도로건설계획을 중심으로)

  • Park, Ki-Hak
    • Environmental and Resource Economics Review
    • /
    • v.21 no.4
    • /
    • pp.999-1024
    • /
    • 2012
  • The Purpose of this study was to assess the willingness to pay(WTP) for the new road construction plan(slip road of urban highway which was advertising extensively to reduce the time to the core of metropolitan area) on housing prices using contingent valuation method(CVM). And this study was an empirical study which was based on the consciousness of residents whose apartment was within the Suwon Si's new plan of 47th road construction zone. In this study, it was revealed that the resident's WTP for the plan of new road construction which was built on the neighborhood of apartment was within the 10 percent of housing prices that was similar to the standard declared price of MLTM(Ministry of Land, Transport and Maritime Affairs). And also revealed that the difference of sale prices of real estate company was 24 percent. The statistical assessment results show that both the resident's characteristic variables such as gender, incomes, size of apartment and the accessability variables such as distance to parks, schools, department stores, living facilities were positive effects on the prices of apartments significantly. Finally, the house has depreciated than that of MLTM and WTO since torpedoed the road construction plan. These results imply that, we have to take capital appreciation of the property into account due to road construction since the accessibility was very significantly positive internal effects on the apartment housing prices.

  • PDF

Drone Operation Plan at Road Construction Site (도로건설 현장에서의 드론 운용방안)

  • Sung, Sang-Min;Yun, Bu-Yeol;Song, Mi-Hwa;Cho, Jun-Sang
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.23 no.5
    • /
    • pp.709-716
    • /
    • 2020
  • Recently, the drone's equipment development and software technology have dramatically improved. With such developments, the applicability is increasing in various fields that require rapid geospatial information, and in practice, regulations and systems have been established, and the fields in use are increasing. Also, in Korea, corporations and public institutions are actually using and researching drones in fields such as aircraft development, communication technology development, construction site use, and surveying. However, there are no fields where drones are actually used in road construction sites. Therefore, in this study, to utilize drones that have been actively used in the civil engineering and construction fields for road construction, we investigated the current status of the Korea Highway Corporation's field drone use research and classified the possibility of drone introduction by road construction. Finally, a method of using drones at road construction sites was proposed to prepare a method for using drones at road construction sites.

Ecological Planning for the Preparation of an Eco-Road on the Pyungtak-Eumsung Highway (평택-음성간 고속도로의 에코로드 조성을 위한 환경생태계획)

  • 강현경;민권식;장종수;한봉호
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.32 no.3
    • /
    • pp.32-42
    • /
    • 2004
  • This study aims at establishing an ecological planning for road construction. which is considered to be a main cause of damage to the natural environment in Korea. This study focuses on the Pyungtak-Eumsung Highway development project. It considers the ecological factors and status of the site and its surrounding area. The study site is a four-way highway with a width of 23.4m and a length of 5.7km that spans from Hyungok-ri, Anseong City, Kyeonggi Province to Jukhyun-ri, Jincheon-gun, Chungbuk Province. The objective of the plan is "the establishment of an eco-road in harmony with nature." The plan is divided into five detailed goals: 1) restoration of river morphology and ecosystem through ecological planning; 2) establishment of wet biotopes; 3) construction of ecological corridors; 4) restoration of damaged forest ecosystems; and 5) ecological restoration of the roadside slopes that are linked with the surrounding forest. A master plan has been developed based on the detailed goals. The master plan involves: 1) establishment of a natural river, wet biotopes, and ecological corridors that facilitate the movement of amphibians, wild fowls, mammalians and fish; 2) development of a planting plan for the visitor center, the tunnel entrance, and soundproof banks; and 3) the presentation of a planting model for restoring roadside slopes that are connected to the surrounding forest. The eco-road plan needs to entail ecological conservation and restoration plans. In addition, a monitoring plan for ecological corridors and habitats should be included in the comprehensive plans, along with the continuous development of environmentally friendly technologies.

System Implementation Plan for Applying Spatial Information to Road Occupation Permit Administrative Works (도로점용허가 행정업무에 공간정보 활용을 위한 시스템 구축방안)

  • Youn, Junhee;Kim, Changyoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.6
    • /
    • pp.4208-4215
    • /
    • 2015
  • Most of the administrative works are executed based on the address. Therefore, spatial information is an essential factor for administrative works. So far, many systems, which apply spatial information to administrative works, have been implemented. However, there is little approach to apply spatial information to road occupation permit works. In this paper, we introduce system implementation plan for applying spatial information to road occupation permit administrative works. System implementation plan includes work analysis, applying scenarios extraction, system function extraction, and datamart construction plans. First, work processes and activities are defined based on the analysis of work handbook. Also, activities are displayed in diagram. Second, scenarios applying spatial information to road occupation permit works are extracted. Third, we derive service functions for system, which realize work processes and applying scenarios. Finally, spatial information datamart construction plan is established. Proposed system implementation plan in this research includes application architecture and part of data architecture. For implementing the system, plan for hardware and software architecture should be studied.

A Study of Index Selection and Application Plan for Environment Friendly Road Construction Plan (친환경적 도로건설계획을 위한 지표 선정 및 적용 방안 연구)

  • Joo, Yongjoon;Sagong, Hee;Choi, Joongyu;Hwang, Giwon
    • Journal of Environmental Impact Assessment
    • /
    • v.26 no.5
    • /
    • pp.354-364
    • /
    • 2017
  • Considerable amount of resources on roads, basic infrastructure, to promote economic development and distribution of goods is invested. Despite the necessity, its undesirable side effects are various environmental problems In order to efficiently evaluate these problems more than before, planning indictors for environment-friendly road constructions is proposed in this study. First, we make an investigation into real-life cases where the extracted planning indicators were applied. Second, it is suggested that an alternative assessment method efficaciously evaluate and/or adopt extracted planning indictors on road construction projects. Finally, criteria to determine environmental impacts with respect to planning indicators and apply them into real cases is proposed. This study has its significance in upgrading past pro-environmental indictors for road construction, suggesting reasonable applications of planning indicators, and setting criteria to determine environmental impacts based on planning indicators.

The Case Analysis on the Road-Crossroad Design VE Competition (도로교차로 설계VE 경진대회 사례분석)

  • Kim, Ki-Han;Kim, Byung-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.839-842
    • /
    • 2008
  • Construction VE is the system introduced in order to reduce the life cycle cost and promote the performance of construction facilities, used in architecture and civil construction since apply to construction over 10 billion from december 2005. But yet it is short of VE specialist and it is not a purpose in maximization of value creation through VE but strong better awareness of tool for budget reduce. This study tries to contribute to qualitative advance of design VE by analyze substantial degree of VE Procedure and VE result by Job Plan used widely in domestic an object design VE competition case to crossroad.

  • PDF

A Study on the Improvement Plan of the Urban Area Using the Three-Dimensional Road System -Focus on Shinbashi·Toranomon area in Japan- (입체도로제도를 활용한 도심 정비방안에 관한 연구 -일본 신바시, 토라노몬 재개발사업을 중심으로-)

  • Baek, Seung-Kwan
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.11
    • /
    • pp.213-223
    • /
    • 2018
  • This study assessed the maintenance plan of the Shimbashi-Toranomon Development Area in Japan, which has recently been completed using the three-dimensional road system. In the main relevant law system, a three-dimensional road system, which enables the construction of buildings above and below the road, was applied. The specific construction regulations applying the financing power and knowledge of private business operators were applied. In the development district, city maintenance guidelines were established, and housing and shopping malls were regulated. This purpose was to promote change, unity of distance, effective use of land, and continuous urban revitalization with charm and vitality. The main features of the maintenance plan were accessibility and greenery, comfort and a sophisticated design, and a maintenance concept utilizing historical buildings and road space through the participation of local residents and the opinions of related committees. In addition, in the case of the construction of the upper and lower roads, the construction restrictions were relaxed, and the separation of the roads and the undergrounding of electric poles were promoted. The main aim was to improve the convenience of the residents and produce a pleasant road landscape.

Road Map of a Knowledge Management System for the Construction Industry (건설산업의 지식관이체계 로드맵)

  • 정인수;김승균;최원식
    • The Journal of Society for e-Business Studies
    • /
    • v.6 no.1
    • /
    • pp.101-121
    • /
    • 2001
  • MOCT(Ministry of Construction St Transportation) suggested "A Plan for Implementation of Knowledge-based Economy for the Construction Industry" to add high value to a construction industry. by means of knowledge-based management. However, there is no knowledge management system which considers characteristics of a domestic construction industry. So a useful knowledge vanished the moment a company terminated a construction Uoject. Therefore, it is necessary to develop "An application method of a knowledge management system for the construction industry" which takes a real environment into consideration. This study aims to present the road map of a knowledge management system which helps the bodies of the construction industry(government, research center/university, enterprise, etc) to do a knowledge activity efficiently. To accomplish this objective, we analyzed overall knowledge management activities. In addition we suggested an implementation direction and strategy of a knowledge management system for the construction industry. As results of this study, we presented the road map of a knowledge management system for the construction industry, which is composed of policy forum, study forum, professional forum, research forum and knowledge 8t information DB. We expect that results of this study will be used as a basis for implementing the knowledge portal that brings a construction industry to a high value added industry.

  • PDF