• Title/Summary/Keyword: River downstream of dam

Search Result 254, Processing Time 0.028 seconds

Evaluation of Eco-Hydrological Changes in the Geum River Considering Dam Operations: I. Flow Regime Change Analysis (댐 운영을 고려한 금강의 생태.수문학적 변화 평가 : I. 유황변화 분석)

  • Ko, Ick-Hwan;Kim, Jeong-Kon;Park, Sang-Young
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.1
    • /
    • pp.1-8
    • /
    • 2009
  • In this study, based on the major activities which might have affected the ecological system of the Geum River, a conceptual model was proposed to guide scenario development for the eco-hydrological river evaluation. Also, an analysis method employing a set of models consisting, with other supporting programs, of KModSim for watershed network analysis and RAP for ecosystem analysis was developed for eco-hydrological river assessment. Then, hydrological analyses with various scenarios were conducted to examine the flow regime changes expected from the construction and operation of the Youngdam Multipurpose Dam (YMD) and Daecheong Multipurpose Dam (DMD) in the Geum River basin. The results indicated that the "Percentile 10" values for 10% exceeding time were decreased by 20.5% and 8.0% at Sutong downstream of YMD and Gongju downstream of DMD, respectively, while "Percentile 90" values for 90% exceeding time were increased by 56.3% and 340.8% at Sutong and Gongju, respectively, resulting in the reduction of the high flow variability typical for unregulated rivers in Korea. The results of eco-hydrological analyses will be presented in the following papers.

A Forecasting Model for the Flood Peak Stage and Flood Travel Time by Hydraulic Flood Routing

  • Yoon, Yong-Nam;Park, Moo-Jong
    • Korean Journal of Hydrosciences
    • /
    • v.4
    • /
    • pp.11-19
    • /
    • 1993
  • The peak flood discharge at a downstream station and the flood travel time between a pair of dams due to a specific flood release from the upper reservoir are computed using a hydraulic river channel routing method. The study covered the whole large reservoir system in the Han River, Korea. The computed flood discharges and the travel times between dams were correlated with the duration and the magnitude of flood release rate at the upstream reservoir, and hence a multiple regression model is proposed for each river reach between a pair of dams. The peak flood discharge at a downstream location can be converted to the peak flood stage by a rating curve. Hence, the proposed regression model could be used to forecast the peak flood stage at a downstream location and the flood travel time between dams using the information on the flood travel time, release rate and duration from the upper dam.

  • PDF

The Effect Factors on the Growth of Phytoplankton and the Sources of Organic Matters in Downstream of South-Han River (남한강 하류수역에서 식물플랑크톤 증식의 영향인자 및 수중유기를 기원)

  • Park, Hae-Kyung;Byeon, Myeong-Seop;Choi, Myeong-Jae;Kim, Young-Jin
    • Journal of Korean Society on Water Environment
    • /
    • v.24 no.5
    • /
    • pp.556-562
    • /
    • 2008
  • We divided the downstream of South-Han River into three water zones, such as river zone, transition zone and lacustrine zone depending on the flow rate, and elucidated the major effect factors on the growth of phytoplankton and the sources of organic matters in each water zone. The difference of chlorophyll-a concentration which represents the standing crop of phytoplankton was statistically significant among the water zones. From the results of bivariate correlation analysis between chlorophyll-a concentration and water quality parameters in each water zone, the outflow of Chungju dam and hydraulic retention time of Lake Paldang which are directly related with the flow rate seemed to have obvious impact on phytoplankton growth in the downstream of South-Han River. The concentration of nutrients such as phosphorus and nitrogen exceeded the criterion of eutrophication and did not showed significant relationship with chlorophyll-a concentration. There were strong correlations between $BOD_5$ and chlorophyll-a concentrations in transition and lacustrine zone showing autochthonous production of phytoplankton was dominant source of organic matters in these zones especially in dry seasons. The results of this study show that the control of abundance of phytoplankton is the key target for reduction of the organic pollution in the downstream of South-Han River.

Modeling Downstream Flood Damage Prediction Followed by Dam-Break of Small Agricultural Reservoir (농업용 소규모 저수지의 붕괴에 따른 하류부 피해예측 모델링)

  • Park, Jong-Yoon;Joh, Hyung-Kyung;Jung, In-Kyun;Jung, Kwan-Soo;Lee, Joo-Heon;Kang, Bu-Sik;Yoon, Chang-Jin;Kim, Seong-Joon
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.52 no.6
    • /
    • pp.63-73
    • /
    • 2010
  • This study is to develop a downstream flood damage prediction model for efficient confrontation in case of extreme and flash flood by future probable small agricultural dam break situation. For a Changri reservoir (0.419 million $m^3$) located in Yongin city of Gyeonggi province, a dam break scenario was prepared. With the probable maximum flood (PMF) condition calculated from the probable maximum precipitation (PMP), the flood condition by dam break was generated by using the HEC-HMS (Hydrologic Engineering Center - Hydrologic Modeling System) model. The flood propagation to the 1.12 km section of Hwagok downstream was simulated using HEC-RAS (Hydrologic Engineering Center - River Analysis System) model. The flood damaged areas were generated by overtopping from the levees and the boundaries were extracted for flood damage prediction, and the degree of flood damage was evaluated using IDEM (Inundation Damage Estimation Method) by modifying MD-FDA (Multi-Dimensional Flood Damage Analysis) and regression analysis simple method. The result of flood analysis by dam-break was predicted to occurred flood depth of 0.4m in interior floodplain by overtopping under PMF scenario, and maximum flood depth was predicted up to 1.1 m. Moreover, for the downstream of the Changri reservoir, the total amount of the maximum flood damage by dam-break was calculated nearly 1.2 billion won by IDEM.

Development of Reservoir Operation Model using Simulation Technique in Flood Season (I) (모의기법에 의한 홍수기 저수지 운영 모형 개발 (I))

  • Sin, Yong-No;Maeng, Seung-Jin;Go, Ik-Hwan;Lee, Hwan-Gi
    • Journal of Korea Water Resources Association
    • /
    • v.33 no.6
    • /
    • pp.745-755
    • /
    • 2000
  • The dam operation system of KOWACO for flood control doesn't have capability to account for the downstream hydrologic conditions and any feasible index to decide the pre-release from the forecasted rainfall and inflow. In this study, a dam operation model for flood control was developed to account for the flood flow condition of its downstream to give users the dam release schedules. Application test of EV ROM to Keum River showed that EV ROM is superior to the Rigid ROM and Technical ROM which are currently used by KOWACO. EV ROM developed in this study provides a release schedule accounting for the cumulative lateral flow hydrograph at the downstream control points where the discharge does not depend only on the dam operation. but also on lateral inflow from the tributaries. In order to reduce the peak discharge at the control points, it suggests the preliminary release during the early rising phase of the predicted hydrograph, holding the flood flow inside the dam during a peak phase, and afterward resuming the release. Three case studies of flood control by the operation of Daechung Multipurpose Dam in Geum River Basin show that the EV ROM is superior to the Rigid ROM and Technical ROM. This must be due to its nature to account for the downstream flow condition as well as the inflow and water level of the dam. It was also conceived that further case studies of EV ROM and more accurate rainfall prediction would improve the dam operation for flood control.ontrol.

  • PDF

The Nitrogen Behavior and Budget in Lake Paldang (팔당호의 질소거동과 수지)

  • Lee, Jangho;Park, Hae-Kyung;Lee, Kyoo;Kim, Eunmi
    • Journal of Korean Society on Water Environment
    • /
    • v.26 no.1
    • /
    • pp.71-80
    • /
    • 2010
  • We studied the nitrogen behavior and budget of Lake Paldang from March to December 2008. The particulate nitrogen (PN) concentrations ranged from 7 to 13% of the total nitrogen concentration (TN) in the stream inflows, the downstream outflow, and the lake water. The nitrate nitrogen ($NO_3-N$) concentration ranged from 67 to 78% of the TN. In the three rivers of Lake Paldang, Gyeongan River (In3 site) had the highest average of the TN, 5.037 mgN/L, but North Han River (In2 site) had the lowest average TN, 1.683 mgN/L. South Han River (In1 site) had the average TN of 2.399 mgN/L. In the dam discharge, TN showed the average 2.063 mgN/L. In the lake water, L4 site (Gyeongan River area) had the highest average TN, 3.781 mgN/L, but L3 site (North Han River) had the lowest average TN, 1.587 mgN/L. Total input of nitrogen loads to Lake Paldang was about 30,875 ton/year in 2008. Inflow rivers contributed 30,643 ton/year (South Han River: 18,111 ton/year (59%), North Han River: 11,333 ton/year (37%), and Gyeongan River: 1,199 ton/year (4%)). The atmospheric deposition had 135 ton/year, the nitrogen release from the bottom sediments had 88 ton/year, and macrophytes had 9 ton/year. Total output of nitrogen loads from Lake Paldang was about 31,256 ton/year. The downstream from dam contributed 29,877 ton/year, and the sediment deposition was 1,379 ton/year.

Changes in Landscape Characteristics of Stream Habitats with the Construction and Operation of River-Crossing Structures in the Geum-gang River, South Korea (금강에서 횡단구조물의 설치와 운영에 따른 하천 서식처의 경관 특성 변화)

  • Kim, Dana;Lee, Cheolho;Kim, Hwirae;Ock, Giyoung;Cho, Kang-Hyun
    • Ecology and Resilient Infrastructure
    • /
    • v.8 no.1
    • /
    • pp.64-78
    • /
    • 2021
  • This study was conducted to find out the effect of the construction and operation of river-crossing structures on the habitat landscape characteristics in the Geum-gang River, South Korea. A total of three study reaches were selected in the downstream of the Daecheong Dam: the Buyong-ri reach, which is a control that is not affected by the construction and operation of the weir of the Four Rivers Project and Sejong-bo Weir reach and Gongju-bo Weir reach of the upper and lower sections of each weir that are affected by the weir construction and operation. The habitat type was classified, and then the structural characteristics of the landscape were analyzed using aerial photographs taken before and after the construction of the Daecheong Dam, before and after the construction of the weir, and before and after the weir gate operation. After the construction of Daecheong Dam in Geum River, the area of the bare land greatly decreased, and the area of grassland and woodland increased in the downstream of the dam. In addition, the patch number in the river landscape increased, the patch size decreased, and the landscape shape index and the habitat diversity increased. Therefore, after the construction of the dam, the bare land habitat was changed to a vegetated habitat, and the habitat was fragmented and diversified in the downstream of the dam. After the construction of the weirs, the area of open water increased by 18% in the Sejong-bo reach and by 90% in the Gongju-bo reach, and the landscape shape index of the open water decreased by 32% in the Sejong-bo reach and by 35% in the Gongju-bo reach, and the habitat diversity index decreased to 25% in the Sejong-bo reach and to 24% in the Gongju-bo reach. Therefore, the open water habitat was expanded, the shape of the habitat was simplified, and the habitat diversity decreased according to the construction of the weirs. After water-gate opening of the weir, the bare land that disappeared after the construction of the weir reappeared, and the landscape shape index and habitat diversity index increased in both terrestrial and open water habitats. Therefore, it was found that the landscape characteristics of the river habitats were restored to the pre-construction of the weir by the operation of the weir gate. The effect of weir gate opening was delayed in the downstream than in the upstream of the weir. Although the characteristics of the landscape structure in the river habitat changed due to the construction of the river-crossing structures, it is thought that proper technology development for the ecological operation of the structures is necessary as the habitat environments can be restored by the operation of these structures.

Simulation of Change in Physical Habitat of Fish Using the Mobile Bed Model in a Downstream River of Dam (댐 하류 하천에서 하상변동 모델을 이용한 어류 물리서식처 변화 모의)

  • Kim, Seung Ki;Choi, Sung-Uk
    • Ecology and Resilient Infrastructure
    • /
    • v.2 no.4
    • /
    • pp.317-323
    • /
    • 2015
  • This study investigated the impact of the morphological change on a physical fish habitat in the downstream reach of a dam using long-term mobile bed simulation. The quasi-steady model was used for hydraulic simulation and the habitat suitability index model was applied for physical habitat simulation. For simulating long-term morphological change of the stream bed, The Exner equation was used. Sorting of bed material was also considered. The results of simulation showed that erosion and armoring process occurred in a reach downstream of the dam and change of physical habitat for Zacco platypus followed. These results indicate that channel morphology and substrate conditions effected the physical habitat for considering long-term investigation.

Evaluation of the Applicability of a Distributed Model at the Downstream of Dam (댐 하류 지점에 대한 분포형 모형의 적용성 평가)

  • Choi, Yun-Seok;Kim, Kyung-Tak;Shim, Myung-Pil
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.9
    • /
    • pp.703-713
    • /
    • 2009
  • Dam has very important roles in both water use and flood control. Dam release and runoff from rainfall affect directly to the flood control at the downstream of dam during heavy storm especially. This study evaluates the applicability of a distributed model by applying the GRM (Grid based Rainfall-runoff Model) based on HyGIS (Hydro Geographic Information System) environment to runoff modeling at the downstream of dam where the discharge from dam and rainfall affect simultaneously. In order to do this, Yeoju watershed in Han River basin is selected. Rainfall data and discharge from Chungju regulation dam and Hoengseong dam are applied to runoff simulation. The modeling results are verified with Yeoju water level station, and they show good agreement with observed hydrographs. And this study shows that GRM is able to simulate appropriately the effect of dam discharge and rainfall on watershed runoff.

Study of the Mitigation of Algae in Lake Uiam according to the Operation of the Chuncheon Dam and the Soyang Dam (춘천댐 및 소양강댐 운영에 따른 의암호 조류 저감 연구)

  • Lee, Dong Yeol;Baek, Kyong Oh
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.2
    • /
    • pp.171-179
    • /
    • 2022
  • In this study, the characteristics of algae mitigation according to dam operation were quantitatively analyzed for Uiam Lake, where the Chuncheon Dam is located upstream of the main stream, Uiam Dam is located downstream, and Soyang Dam is located in the tributary stream. Nine dam operation scenarios were applied to the event of the summer of 2018 (at that time an algae alert occurred) using the EFDC model, which is capable of calculating three-dimensional hydrodynamics and water quality levels such as those associated with chlorophyll-a. The dam operation scenarios were set to generate a flushing effect via discharges in the form of pulse waves from the upstream dams and by lowering the water level at the downstream dam. At Uiam Lake, the flushing effect was different depending on the operation of the dam, and the amount of algae reduction at each point was different owing to topographic characteristics and the different base water temperatures from BukHan River and Soyang River. With regard to a point located on the left bank, it was predicted that the peak level of chlorophyll-a would be reduced by approximately 50 % or more upon pulsed discharge at 50 m3/s for three days at Soyang Dam. However, for the right bank, the amount of discharge from Soyang Dam had little effect on algae mitigation. Therefore, an appropriate dam operation could be effective for algae mitigation at specific points in the water body where large dams exist upstream and downstream, such as at Uiam Lake, in an emergency situation in which algal blooms rapidly.