• 제목/요약/키워드: Risk-Based Design

검색결과 1,164건 처리시간 0.025초

선박 및 해양설비의 위험도기반설계 기술 (Risk-Based Design for Ships and Offshore Installations)

  • 장대준
    • 대한조선학회 특별논문집
    • /
    • 대한조선학회 2005년도 특별논문집
    • /
    • pp.113-126
    • /
    • 2005
  • This paper describes introductory remarks on risk management and risk-based design for ships and offshore installations with potential hazards. Clients' requirements on safety and performance was related to the risk management and risk-based design. A general procedure for risk-based design was also suggested with each step explained in detail. Various risk-based design approaches were emphasized with their needs and methodological characteristics taken into account. Related rules, standards, and regulations were summarized. The last part included recommendations for Korean ship building industries about the risk management and risk-based design.

  • PDF

Risk-informed design optimization method and application in a lead-based research reactor

  • Jiaqun Wang;Qianglong Wang;Jinrong Qiu;Jin Wang;Fang Wang;Yazhou Li
    • Nuclear Engineering and Technology
    • /
    • 제55권6호
    • /
    • pp.2047-2052
    • /
    • 2023
  • Risk-informed approach has been widely applied in the safety design, regulation, and operation of nuclear reactors. It has been commonly accepted that risk-informed design optimization should be used in the innovative reactor designs to make nuclear system highly safe and reliable. In spite of the risk-informed approach has been used in some advanced nuclear reactors designs, such as Westinghouse IRIS, Gen-IV sodium fast reactors and lead-based fast reactors, the process of risk-informed design of nuclear reactors is hardly to carry out when passive system reliability should be integrated in the framework. A practical method for new passive safety reactors based on probabilistic safety assessment (PSA) and passive system reliability analyze linking is proposed in this paper. New three-dimension frequency-consequence curve based on risk concept with three variables is used in this method. The proposed method has been applied to the determination optimization of design options selection in a 10 MWth lead-based research reactor(LR) to obtain one optimized system design in conceptual design stage, using the integrated reliability and probabilistic safety assessment program RiskA, and the computation resources and time consumption in this process was demonstrated reasonable and acceptable.

위험도 기반 내진 설계의 일반적인 프레임워크 (General Framework for Risk-based Seismic Design)

  • 장승필;오윤숙;김남희
    • 한국지진공학회:학술대회논문집
    • /
    • 한국지진공학회 2002년도 추계 학술발표회 논문집
    • /
    • pp.285-291
    • /
    • 2002
  • This paper proposes the concept and the general framework of the risk-based seismic design. Because earthquakes and the behaviors of structures are very unpredictable, probabilistic seismic design methods have been proposed after deterministic design methods. Considering these changes, we can find that the important point of seismic design is not the structural behavior itself, but the consequence of structural behavior under possible earthquakes. Risk-based seismic design can tell these consequences under any earthquakes. In this paper, structural confidences are considered by using fragility curve, and risk is modeled by failure probability and consequence-property damage cost, casualty cost.

  • PDF

화재위험도 평가에 대한 연구 : 국내 현실을 고려한 화재위험도 평가 프로세서 제안을 중심으로 (A Study on the Fire Risk Assessment : Based on the Proposal of a Fire Risk Assessment Processor Considering the Reality in Korea)

  • 이종화
    • 대한안전경영과학회지
    • /
    • 제23권1호
    • /
    • pp.57-64
    • /
    • 2021
  • Recently, advanced countries assessment the risk of fire to prevent large-scale damage to high-rise buildings, In addition, performance-Based design, which is a fire risk assessment, is being conducted in Korea to prevent massive damage to high-rise buildings. However, unlike advanced countries, fire risk assessment in Korea is subject to fire risk assessment only for objects subject to consent from fire-fighting facilities such as building permits, When building engineers and fire-fighting engineers assessment the risk of fire, It has always been discussed because the results vary depending on which part of the evaluation is focused between economic feasibility and safety. Therefore, in this study, we would like to propose a fire risk assessment process suitable for domestic conditions by comparing the process of performance-based design, which is a domestic fire risk assessment, and the process of Iso/TC 16732 which is an overseas fire risk assessment.

성능위주설계에서 화재위험성 예측 과정의 문제점 및 개선방안 (The Problems and Improvements of Process to Predict Fire Risk of a Building in Performance Based Design)

  • 이세명
    • 대한안전경영과학회지
    • /
    • 제16권3호
    • /
    • pp.145-154
    • /
    • 2014
  • Performance based design(PBD) is the method to make a fire safety design against them after predicting the factors of fire risk in a building. Therefore, predicting fire risk in a building is very important process in PBD. For predicting fire risk of a building, an engineer of PBD must consider various factors such as ignition location, ignition point, ignition source, first ignited item, second ignited item, flash over, the state of door and fire suppression system. But, it is difficult to trust fire safety capacity of the design because the process in Korea' PBD is unprofessional and unreasonable. This paper had surveyed some cases of PBD that had been made in Korea to find the problems of the process to predict fire risk. And it have proposed the improvements of process to predict fire risk of a building.

시스템엔지니어링을 이용한 턴키방식 플랜트 건설계약의 기술적 위험요인 효과적 분석 및 관리 (An Effective Analysis and Management of Technical Risk to Turn-key based Plant Construction Contracts using Systems Engineering)

  • 홍대근;변희철;서석환
    • 시스템엔지니어링학술지
    • /
    • 제10권2호
    • /
    • pp.59-69
    • /
    • 2014
  • In the bidding stage of turn-key based plant construction contracts, owners provide design and performance basis for contractors instead of giving design drawing. To win the bid for a plant construction, the contractors should be obliged to satisfy and ensure owners'requirements such as design and performance basis in a plant construction project, In other words, owners imposes technical risk of the design to the contractors by specifying responsibility for the analysis and verification of the plant construction. Thus, it is very important that contracters make accurate and realistic basic design plan in a short period of time. To deal with such a situation, we propose a systems engineering approach for the analysis and management of the technical risk. Specifically, we first: 1) Analyzes technical risk related with the plant design information for the bidders, followed by 2) Developing stakeholder requirements for the basic engineering design, and 3) System requirements for dealing with technical risk. Also, in this paper, we proposed converting method from MOE(Measure of Effectiveness) to MOP(Measure of Performance) in the risk analysis. To show the effectiveness of the proposed method, we carried out a case study.

위험도기반 최대예상지진에 근거한 국내 내진설계 지도 (Domestic Seismic Design Maps Based on Risk-Targeted Maximum- Considered Earthquakes)

  • 신동현;김형준
    • 한국지진공학회논문집
    • /
    • 제19권3호
    • /
    • pp.93-102
    • /
    • 2015
  • This study evaluates collapse probabilities of structures which are designed according to a domestic seismic design code, KBC2009. In evaluating their collapse probabilities, to do this, probabilistic distribution models for seismic hazard and structural capacity are required. In this paper, eight major cities in Korea are selected and the demand probabilistic distribution of each city is obtained from the uniform seismic hazard. The probabilistic distribution for the structural capacity is assumed to follow a underlying design philosophy implicitly defined in ASCE 7-10. With the assumptions, the structural collapse probability in 50 years is evaluated based on the concept of a risk integral. This paper then defines an mean value of the collapse probabilities in 50 years of the selected major cities as the target risk. Risk-targeted spectral accelerations are finally suggested by modifying a current mapped spectral acceleration to meet the target risk.

웹 디자인 프로젝트에서 리스크 매니지먼트 요인에 대한 사례 연구 (A Case Study of Risk Management factors in Web Design Project)

  • 박은영
    • 디자인학연구
    • /
    • 제16권4호
    • /
    • pp.69-78
    • /
    • 2003
  • 웹 디자인 프로젝트에서 리스크 매니지먼트는 매우 중요한 프로젝트 매니지먼트 항목 중 하나이다. 리스크 매니지먼트란 웹 디자인 프로젝트 위기사항을 피하기 위하여 시간을 가지고 리스크의 원인을 찾아내어 적절한 대응책을 강구하여 프로젝트의 최종 목표를 성공적으로 수행하는데 있다. 즉 프로젝트 3대 요소인 일정, 비용, 품질을 만족하기 위한 프로세스이다. 본 논문은 첫째, 웹 디자인 프로젝트 매니지먼트의 개념 및 목적, 프로세스와 지식 영역을 살펴보고 둘째, 웹 디자인 프로젝트 기 계획 단계에서 리스크 매니지먼트 계획에 대한 체계적인 리스크 매니지먼트 프로세스와 리스크 관리 모델을 제안하고 있다. 세 째는 제시한 리스크 매니지먼트 모델의 표준화 및 모델 화의 타당성을 실제 사례인 E사 프로젝트를 통해 검증하고 있다.

  • PDF

Security and Risk를 기반으로 한 교량구조물의 재난 안전성 평가 (Risk-based Security Impact Evaluation of Bridges for Terrorism)

  • 강상혁;최현호;서종원
    • 한국방재학회:학술대회논문집
    • /
    • 한국방재학회 2008년도 정기총회 및 학술발표대회
    • /
    • pp.629-632
    • /
    • 2008
  • Risk-based security impact evaluation may be affected by various factors according to numerous combinations of explosive devices, cutting devices, impact vehicles, and specific attack location to consider. Presently, in planning and design phases, designers are still often uncertain of their responsibility, lack of information and training of security. Therefore, designers are still failing to exploit the potential to reduce threats on site. In this study, the concept of security impact assessment is introduced in order to derive the performing design for safety in design phase. For this purpose, a framework for security impact assessment model using risk-based approach for bridge structures is suggested. The suggested model includes of information survey, classification of terror threats, and quantitative estimation of severity and occurrence.

  • PDF

The conditional risk probability-based seawall height design method

  • Yang, Xing;Hu, Xiaodong;Li, Zhiqing
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • 제7권6호
    • /
    • pp.1007-1019
    • /
    • 2015
  • The determination of the required seawall height is usually based on the combination of wind speed (or wave height) and still water level according to a specified return period, e.g., 50-year return period wind speed and 50-year return period still water level. In reality, the two variables are be partially correlated. This may be lead to over-design (costs) of seawall structures. The above-mentioned return period for the design of a seawall depends on economy, society and natural environment in the region. This means a specified risk level of overtopping or damage of a seawall structure is usually allowed. The aim of this paper is to present a conditional risk probability-based seawall height design method which incorporates the correlation of the two variables. For purposes of demonstration, the wind speeds and water levels collected from Jiangsu of China are analyzed. The results show this method can improve seawall height design accuracy.