Purpose: The purpose of this paper is to study quantitative risk grade assessment for objective government quality assurance activities based on risk management in initial mass production for weapon systems. Methods: The Defense quality management regulations and foreign risk assessment documents are referred to analyze problems performing quality assurance actives. The failure rate data, maintainability and cost of products have been studied to quantify the risk Likelihood and impact. The analyzed data were classified as risk grade assessment through K-means Cluster Analysis method. Results: Results show that a proposed method can objectively evaluate risk grade. The analyzed results are clustered into three levels such as high, middle and low. Two products are allocated high, eleven low and seven middle. Conclusion: In this paper, quantitative risk grade assessment methods were presented by analyzing risk ratings based on objective data. The findings showed that the methods would be effective for initial mass production for weapon systems.
The Transactions of The Korean Institute of Electrical Engineers
/
v.58
no.5
/
pp.960-967
/
2009
Power supply system of electric railway has a diversity of safety problems since it should supply high electric power to the trains moving high speed with a lot of passengers on board. This paper provides a risk assessment approach to safety management of the electric railway facilities. Construction of database from field accident information, risk assessment and management of the risk are carried out systematically to ensure the safety. The risk assessment includes hazard identification, cause analysis by FTA(Fault Tree Analysis), consequence analysis by EVA(Event Tree Analysis), and loss analysis. In terms of the severity and the probability of the accidents deduced by these analyses, the risk of the accidents is assessed by using a risk matrix designed for electric railway facilities. Based on the risk assessment, possible risk mitigation options are identified and evaluated by analyzing their impact on the risk reduction and their cost benefit ratio. The long-term safety of the electric railway facilities can be ensured by renewal of the risk assessment and the risk mitigation option analysis with continuous accident database update. The proposed approach is applied to the electric railway facilities of Korean railway based on the accident data from 2002 to 2008.
In recent years, the labor consciousness is gradually valued. During the process of pursuing sustainable operation, the enterprises treat occupational hazard risk as the waste of cost. The purpose of OHSAS 18000 occupational security and health management system is to systematically establish the business managerial measures in terms of occupational security and calamity prevention. This research proceeded with questionnaire analysis with respect to the relationship between the OHSAS 18000 system implementation and competitiveness in Taiwan's industries. The research result revealed that there was significant relationship between Taiwan firms' execution of OHSAS 18000 system and industry competitiveness. Thus, the enterprises can decide the proper managerial plans according to the result of their own risk evaluation to prevent the happening of accidents and reduce the operational cost. They can thus completely control business occupational hazard risk through "systematic" management.
There have been many studies to build a model that can help investors construct optimal portfolio. Most of the previous models, however, are based upon the path-breaking Markowitz model (1959) which is a quantitative model. One of the most important problems with that kind of quantitative model is that, in reality, most of the investors use not only quantitative, but also qualitative information when they select their optimal portfolio. Since collecting both types of information from the markets are time consuming and expensive, making a set of target assets smaller, without suffering heavy loss in the rate of return, would attract investors. To extract only desired assets among all available assets, we need knowledge that identifies investors' preference for the risk of the assets. This study suggests two-layer decision-making rules capable of identifying an investor's risk preference and an architecture applying them to a quantitative portfolio model based on risk and expected return. Our knowledge-based portfolio system is to build an investor's preference-oriented portfolio. The empirical tests using the data from Korean capital markets show the results that our model contributes significantly to the construction of a better portfolio in the perspective of an investor's benefit/cost ratio than that produced by the existing portfolio models.
Cloud computing is a distributed computing model that has lot of drawbacks and faces difficulties. Many new innovative and emerging techniques take advantage of its features. In this paper, we explore the security threats to and Risk Assessments for cloud computing, attack mitigation frameworks, and the risk-based dynamic access control for cloud computing. Common security threats to cloud computing have been explored and these threats are addressed through acceptable measures via governance and effective risk management using a tailored Security Risk Approach. Most existing Threat and Risk Assessment (TRA) schemes for cloud services use a converse thinking approach to develop theoretical solutions for minimizing the risk of security breaches at a minimal cost. In our study, we propose an improved Attack-Defense Tree mechanism designated as iADTree, for solving the TRA problem in cloud computing environments.
Operation of KORAIL's level crossing is in charge of KORAIL. As taking over existing level crossing to KORAIL, they do not conduct risk assessments, so we do not know about any possibilities of inner risk. And present operation of safety of the level crossing is just regular checking of reaction and functions of safety equipments physically, we need to react to the changes of what's going on around of level crossing and incestigation of traffic flow and surrounding conditions more spontaneously. So, we have to prepare the strategies against accidents of level crossing cost-effectively based on regular risk assessments for sustainable safety improvements and overcome operational problems of present level crossing's safety. Here, we're going to investigate the level of safety level and present risk factors of the level crossing using risk assessments for accidents/error of the equipments to show operational strategies of level crossing based on risk assessments.
International conference on construction engineering and project management
/
2015.10a
/
pp.614-615
/
2015
In these days, global construction market is speedily increasing and domestic construction companies have a chance of new contracts. In the meantime, international projects have been increasingly forced to cope with potential risks, which seriously impacted achieving the targeted time and cost. In this study, we introduce a computerized risk management system for international EPCS projects, which is constructed on the needs of practitioners and decision makers as an aid to proactively control the potential risks and to monitor continuously their status and variation. The system is called the Project Risk Management System (PRiMS) is useful for furnishing project managers with warning signals as a project is progressing and helpful for producing the total risk score and tracking risk variation.
KSCE Journal of Civil and Environmental Engineering Research
/
v.40
no.4
/
pp.417-428
/
2020
The characteristics of the construction project involved various stakeholders' involvement from the planning stage until completion of the object, which caused the uncertainty to increase. Successful construction projects require risk analysis and appropriate responses. Therefore, this study aimed to confirm the influence of risk management factors on the success of river disaster prevention construction in construction projects and the effect of moderating communication between stakeholders involved in the construction process. The Delphi method was used to derive the risk management factors of the construction process. The survey used a snow ball sampling method. For analysis, SPSS Statistic 20 and SmartPLS 2.0 were used. As a result of the study, the impact of risk management factors on project performance was found to be large in the order of time risk, quality risk, cost risk, safety risk, and construction environment risk. In addition, the impact of the communication moderating effect was large in the order of cost risk, quality risk, construction environment risk, time risk, and safety risk. In this study, it was confirmed that communication between stakeholders related to river disaster prevention work has a moderating effect that changes the ranking of impacts on project performance. This shows the importance of communication in the construction process of river disaster prevention works. This study has important significance in that it identifies the importance of risk management factors and communication in river disaster prevention works.
This study suggests a model for continuing and comprehensive management of hypertension or Type 2 diabetes mellitus (T2DM) in Korea. Moreover, this paper computed the contribution cost of hypertension or T2DM management using the healthcare medical cost, which could have occurred from stroke, myocardial infarction (MI), and end-stage renal disease (ESRD) that were successfully prevented from the effective hypertension or T2DM management. Additionally, these costs were compared with the cost of implementing the hypertension or T2DM management model suggested in this study. This study used the medical fee summary of the health insurance claims submitted to National Health Insurance Corporation by medical facilities for services provided during the period from January 1st 1999 to December 31st 2006. The prevalence rate with treatment referred to cases in which patients submitted their medical claims at least once during the period, along with an accordant diagnosis. The incidence rate with treatment referred to cases in which patients who never submitted claims for the accordant disease during the five years from 1999 to 2003 submitted claims for the accordant disease in 2004 and 2005. The relative risk of the occurrence of stroke, MI and ESRD was 11.0, 13.6, and 30.3, respectively. The attributable risk of hypertension or T2DM for stroke was 0.730, and that for MI and ESRD were 0.773 and 0.888, respectively. Based on these, the contribution cost of hypertension or T2DM is estimated to be 986.3 billion Korean Won(KRW) for stroke patients, 330.5 billion KRW for MI patients, and 561.7 billion KRW for ESRD patients as in 2005. Hence, the total contribution cost of hypertension or T2DM to stroke, MI, and ESRD is 1.878 trillion KRW. The estimate for operational costs included an annual expenditure of 50,000 KRW per each recipient and an annual subsidy of 0.22 million KRW per person for the 1.6 million low.income individuals with hypertension or T2DM to cover their out.of.pocket medical expenses. Under this assumption, it took approximately 0.6 trillion KRW to manage 5 million high.risk patients in the low. and mid.income range, coverings up to 50% of costs. In conclusion, considering the potential benefits of preventing stroke, MI, and ESRD, the costs seems to be reasonable.
Ji, Dong-Han;O, Young-Tae;Choi, Hyun-Ho;Kim, Sung-Hun
Korean Journal of Construction Engineering and Management
/
v.9
no.1
/
pp.143-154
/
2008
Since the concerns for safety of highway traffic safety facilities inherent in various environmental risk is increased, systematic performance, cost, and effect analysis process is needed for this. In case of median barrier among various traffic safety facilities, quantitative risk assessment is inevitable because it has lots of direct/indirect risk factors. Thus, this study suggests an advanced VE(Value Engineering) approach incorporating quantitative risk analysis. For the applicability, suggested VE approach considering alternative 1(140cm) and 2(127cm) is applied to median barrier in fields. Also, major improvement objects are extracted from governing factors of cost and performance based on functional analysis. It is concluded that the proposed risk assessment methodology will provide rational and practical solutions for best value and the approach could effectively applied for various traffic safety facilities by slight modification of suggest process.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.