• Title/Summary/Keyword: Reservoir Simulation

Search Result 420, Processing Time 0.027 seconds

Optimization Technique for Estimation of Potential Hydroelectric Energy at Existion Ahricultural Reservoir (최적화기법을 이용한 기존 농업용 저수지에서의 부존 수력발전량 추정)

  • An, Tae-Jin;Ryu, Hui-Jeong;Park, Jeong-Eung
    • Journal of Korea Water Resources Association
    • /
    • v.32 no.3
    • /
    • pp.281-289
    • /
    • 1999
  • Small-scale hydropower projects at existing agricultural reservoirs can contribute to produce electric energy by maximizing the use of releases from the reservoirs. The irrigation water duration, the reservoir hydropower simulation, and the nonlinear programming model are employed to estimate potential hydroelectric energy at an existing reservoir. The nonlinear programming model consists of finding a maximum hydroelectric energy subject to irrigation water demand constraints. The sample reservoir given a set of inflow and irrigation water is considered. The optimal solutions by the optimization model yield the most hydroelectric energy for the analysis period in the three methods. Consequently, the nonlinear programming model uses the most water for hydropower generation with respect to the total inflow of the sample reservoir. It is also found that additional storage by increasing the normal water level of the sample reservoir does not significantly increase the annual hydroelectric energy for the given reservoir. It is expected that the optimization model and the proposed procedure for estimating potential hydroelectric energy can be applied to evaluate feasibility analysis for small scale hydropower additions at existing agricultural dams.

  • PDF

Predictive analysis of minimum inflow using synthetic inflow in reservoir management: a case study of Seomjingang Dam (자료 발생 기법을 활용한 저수지 최소유입량 예측 기법 개발 : 섬진강댐을 대상으로)

  • Lee, Chulhee;Lee, Seonmi;Lee, Eunkyung;Ji, Jungwon;Yoon, Jeongin;Yi, Jaeeung
    • Journal of Korea Water Resources Association
    • /
    • v.57 no.5
    • /
    • pp.311-320
    • /
    • 2024
  • Climate change has been intensifying drought frequency and severity. Such prolonged droughts reduce reservoir levels, thereby exacerbating drought impacts. While previous studies have focused on optimizing reservoir operations using historical data to mitigate these impacts, their scope is limited to analyzing past events, highlighting the need for predictive methods for future droughts. This research introduces a novel approach for predicting minimum inflow at the Seomjingang dam which has experienced significant droughts. This study utilized the Stochastic Analysis Modeling and Simulation (SAMS) 2007 to generate inflow sequences for the same period of observed inflow. Then we simulate reservoir operations to assess firm yield and predict minimum inflow through synthetic inflow analysis. Minimum inflow is defined as the inflow where firm yield is less than 95% of the synthetic inflow in many sequences during periods matching observed inflow. The results for each case indicated the firm yield for the minimum inflow is on average 9.44 m3/s, approximately 1.07 m3/s lower than the observed inflow's firm yield of 10.51 m3/s. The minimum inflow estimation can inform reservoir operation standards, facilitate multi-reservoir system reviews, and assess supplementary capabilities. Estimating minimum inflow emerges as an effective strategy for enhancing water supply reliability and mitigating shortages.

An Efficient Management of Sediment Deposit for Reservoir Long-Term Operation (2) - Sediment Distribution and Reduction Method in Reservoir (저수지 장기운영을 위한 퇴적토사의 효율적 관리(2) - 저수지 퇴사분포 및 저감방안)

  • Ahn, Jae Hyun;Jang, Su Hyung;Choi, Won Suk;Yoon, Yong Nam
    • Journal of Korean Society on Water Environment
    • /
    • v.22 no.6
    • /
    • pp.1094-1100
    • /
    • 2006
  • In this study, the reservoir sediment reduction methods for long-term operation are proposed by the analysis of both sediment deposit characteristics and sediment reduction effect by each method. To that end, a flowchart for sediment analysis in reservoir is established and sediment deposit is simulated by SMS-SED2D model. The sediment reduction methods which are sediment passing (sluicing), flushing, trapping, bypassing and mechanical removal are used. From the simulation results, the effective method for sediment reduction is operation which is coupled by both sediment passing with sand gate and sediment trapping with debris dam. And If sediment flushing will be used once a year after 50 years, conservation storage can be secured until 100 years after dam construction.

A multi-field CAE analysis for die turning injection application of reservoir fluid tank (리저버 탱크의 Die Turning Injection 적용을 위한 Multi-field CAE 해석)

  • Lee, Sung-Hee
    • Design & Manufacturing
    • /
    • v.15 no.1
    • /
    • pp.66-71
    • /
    • 2021
  • In this study, die turning injection(DTI) mold design for manufacturing reservoir fluid tanks used for cooling in-vehicle batteries, inverters, and motors was conducted based on multi-field CAE. Part design, performance evaluation, and mold design of the reservoir fluid tank was performed. The frequency response characteristics through modal and harmonic response analysis to satisfy the automotive performance test items for the designed part were examined. Analysis of re-melting characteristics and structural analysis of the driving part for designing the rotating die of the DTI mold were performed. Part design was possible when the natural frequency performance value of 32Hz or higher was satisfied through finite element analysis, and the temperature distribution and deformation characteristics of the part after injection molding were found through the first injection molding analysis. In addition, it can be seen that the temperature change of the primary part greatly influences the re-melting characteristics during the secondary injection. The minimum force for driving the turning die of the designed mold was calculated through structural analysis. Hydraulic system design was possible. Finally, a precise and efficient DTI mold design for the reservoir fluid tank was possible through presented multi-field CAE process.

Uncertainty reduction of seismic fragility of intake tower using Bayesian Inference and Markov Chain Monte Carlo simulation

  • Alam, Jahangir;Kim, Dookie;Choi, Byounghan
    • Structural Engineering and Mechanics
    • /
    • v.63 no.1
    • /
    • pp.47-53
    • /
    • 2017
  • The fundamental goal of this study is to minimize the uncertainty of the median fragility curve and to assess the structural vulnerability under earthquake excitation. Bayesian Inference with Markov Chain Monte Carlo (MCMC) simulation has been presented for efficient collapse response assessment of the independent intake water tower. The intake tower is significantly used as a diversion type of the hydropower station for maintaining power plant, reservoir and spillway tunnel. Therefore, the seismic fragility assessment of the intake tower is a pivotal component for estimating total system risk of the reservoir. In this investigation, an asymmetrical independent slender reinforced concrete structure is considered. The Bayesian Inference method provides the flexibility to integrate the prior information of collapse response data with the numerical analysis results. The preliminary information of risk data can be obtained from various sources like experiments, existing studies, and simplified linear dynamic analysis or nonlinear static analysis. The conventional lognormal model is used for plotting the fragility curve using the data from time history simulation and nonlinear static pushover analysis respectively. The Bayesian Inference approach is applied for integrating the data from both analyses with the help of MCMC simulation. The method achieves meaningful improvement of uncertainty associated with the fragility curve, and provides significant statistical and computational efficiency.

Modeling and Simulation of the Pneumatic Part in a Cold Gas Blow-Down Type Hydraulic Actuation System for a Missile (상온기체 블로우다운 방식을 사용한 유도무기용 유압식 구동장치의 공압부에 대한 모델링 및 시뮬레이션)

  • Park, Hee Seung
    • Journal of Drive and Control
    • /
    • v.13 no.3
    • /
    • pp.1-7
    • /
    • 2016
  • A cold gas blow-down hydraulic actuation system is widely used in missiles that require an actuation system with a fast response time under a limited space with a short operating time and large loads on the actuators. The system consists of a pneumatic part that supplies the regulated high-pressure gas to a reservoir, and a hydraulic part that supplies pressurized hydraulic oil to the actuators by the pressurized gas in the reservoir. This paper proposes a mathematical model to analyze and simulate the pneumatic part of an actuation system that supplies the operating power to the actuators. The mathematical model is based on the ideal gas equation and also considers the models for heat transfer. The model is applied to the pressure vessel and the gas part of the reservoir, and the model for the pneumatic part is established by connecting the two models for the parts. The model is validated through a comparison of the simulation results with the experimental results. The comparison shows that the suggested model could be useful in the design of the pneumatic part of a cold gas blow-down type hydraulic actuation system.

A Comparative Study of Reservoir Operations for Flood Control of the Chungju Dam (홍수시 충주댐 운영방안의 비교검토)

  • 이길성;정동국
    • Water for future
    • /
    • v.18 no.3
    • /
    • pp.225-233
    • /
    • 1985
  • To develop a simulation strategy of multi-reservoir operation in flood season, the single dam operations methed for the Chungju dam are investigated in the Han river basin. Thus, spillway rule curve, rigid ROM, and linear decision rules are applied for control operations, subject to the restrictions imposed by the river and the reservoir characteristics. The storage and release and control/utility efficiencies for several floods are calculated. The variation of control coefficients with respect to the return period are also examined. As the results of this comparative study, the optimal operation method can be selected in terms of the magnitude of flood. With inflow forecasting, the flood control operation can be greatly improved by variable coefficients rigid ROM and linear decision rules.

  • PDF

A Simulation Study on the Analysis of Optimal Gas Storage System of the Depleted Gas Reservoir (고갈가스전에의 적정 가스저장시스템 분석을 위한 시뮬레이션 연구)

  • Lee, Youngsoo;Choi, Haewon;Lee, Jeonghwan;Han, Jeongmin;Ryou, Sangsoo;Roh, Jeongyong;Sung, Wonmo
    • Korean Chemical Engineering Research
    • /
    • v.45 no.5
    • /
    • pp.515-522
    • /
    • 2007
  • In this study we have attempted to evaluate the technical feasibility of "BB-HY", which is depleted gas reservoir as a gas storage field, using the commercial compositional simulator "ECLIPSE 300". The "BB-HY" reservoir has an initial gas in place of 143 BCF which is relatively small, and its porosity and permeability are 19.5% and 50 md, respectively. For "BB-HY" gas reservoir, we have performed a feasibility analysis by investigating the cushion gas (or working gas), converting time to gas storage field, operation cycle, number of wells and the possible application of horizontal borehole as well. From the simulation results, it was found that the amount of cushion gas in "BB-HY" reservoir is required at least 50% of IGIP in order to operate stably as gas storage field. When one produces gas for longer time and hence the remaining gas in reservoir is less than optimal cushion gas, no technical problem was occurred as long as additional cushion gas is injected up to the optimal cushion gas. In the case of changing the operation cycle into producing gas for three months during winter season from producing five months, the result shows that either the cushion gas should be greater than 60% or the more number of wells should be drilled. Meanwhile, from the results of sensitivity analysis for the number of wells, in cases of operating six or eight vertical wells, the stable reproduction of the injected gas can not be possible in "BB-HY" gas reservoir since the remaining gas in reservoir is increased. Therefore, in "BB-HY" reservoir, at least ten vertical wells should be drilled for the stable operation of gas. This time, when three horizontal wells are additionally drilled including the existing two vertical wells, it was found that the operation of injection and reproduction of gas is relatively stable in "BB-HY" gas reservoir.

Evaluation of the Effective Storage of Existing Agricultural Reservoir (기존 농업용 저수지에서의 유효저수량의 평가)

  • Ahn, Tae-Jin;Cho, Dong-Ho;Lee, Sang-Ho;Choi, Gye-Woon;Yoon, Yong-Nam
    • Journal of Korea Water Resources Association
    • /
    • v.37 no.5
    • /
    • pp.353-361
    • /
    • 2004
  • Effective storage in agricultural reservoir has been determined through the reservoir simulation operation based on the water budget analysis. Since each watershed has the native property for runoff, considering the runoff yielding from the basin is feasible to the determination of reservoir effective storage. In this study the stochastic linear programming model considering mainly runoff from watershed has been also formulated to analyze the effective storage of the exiting reservoir. The linear decision rule coupled with chance-constrained model in the linear programming model contributes to reduce the size of linear program model without considering the period of analysis. The Geum-Gang reservoir located in Ansung have been adopted to evaluate the effective storage. It has been shown that the effective storage based on the linear programming model is greater than that based on the water budget analysis. It has been also desired that once the effective storage is obtained through the linear programming model, operation of the reservoir should be performed to check the designed capacity.