• Title/Summary/Keyword: Replacement Criteria

Search Result 169, Processing Time 0.034 seconds

Establishment of Replacement Criteria for Stud Bolts using on High Temperature in the Power Plants (발전설비 고온부에서 사용되는 스터드 볼트의 교체기준 설명)

  • 정남용;김문영
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.8 no.6
    • /
    • pp.279-286
    • /
    • 2000
  • The stud bolts tend to degrade faster by high temperature(over 45$0^{\circ}C$). Therefore, replacement cycle inspection of stud bolts were carried out various method such as ultrasonic test(UT), magnetic test(MT), wobble test, visual test and hardness test. Especially, wobble test method has been applied to determine replacement evaluation criteria of stud bolt after long time operation. We applied three different methods on the three site and the obtained data are compared with the results from the evaluation methods. From the results, the replacement criteria for stud bolts under high temperature in power plants are proposed.

  • PDF

Logicality Estimate for Domestic the Periodic Replacement Criteria of CWR based on Accumulated Passing Tonnage (누적통과톤수에 의한 국내 레일교체기준의 타당성 평가)

  • Park, Yong-Gul;Suh, Sang-Kyo;Choi, Jung-Youl
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.3
    • /
    • pp.326-333
    • /
    • 2008
  • This study is objected by presenting preliminary data to revise the periodic replacement criteria of continuous welded rail (CWR) in using. In this study, it is investigated information resources for foreign standards, the cause and types of damage in welded rails and the track maintenance history of Seoul metro to analysis the correlation between rail failure and accumulated passing tonnage. Also, it is performed bending test for the laid welded rail reaching the periodic replacement criteria. In result, the correlation between rail failure and accumulated passing tonnage is not obvious and it is a lot of cases for the construction error of welded rail. Also, as a result of bending test of laid welded rail, according to reducing about $17{\sim}18%$ the bending fracture strength of rail, the laid welded rail reaching the periodic replacement criteria is well enough ensured for the load carrying capacity of rail.

A Study on the Proposal of Amendment of Laws and Regulations on the Improvement of Defect Determination Criteria for Painting Work and the Establishment of Replacement Cycle for Fire door (도장공사 하자판정기준 개선 및 방화문 교체 주기 설정에 관한 법령 개정안 제안 연구)

  • Kim, Soo-Yeon;Kwon, Young-Jin;Kim, Yun-Seong;Oh, Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.95-96
    • /
    • 2022
  • Based on the analysis of defects occurring before and after painting work, this study intends to derive a reasonable improvement in judgment criteria and propose an amendment to the relevant law through the establishment of a clear fire door replacement cycle in terms of fire safety.

  • PDF

An Empirical Study on Decision Criteria of Core Banking System Redevelopment Project (은행 기간시스템 전면 재개발 의사결정 기준에 대한 실증적 연구)

  • Lee, Kyung-Jo;Rhew, Sung-Yul;Kim, Sung Kun
    • Journal of Information Technology Applications and Management
    • /
    • v.19 no.4
    • /
    • pp.19-39
    • /
    • 2012
  • Korean core banking system has been redeveloped twice in the last 30 years with big-bang method, but still needs innovation to meet everlasting business changes. The objective of this study is to identify which decision criteria lead to replacement decision of core baning system in spite of its huge investment and accompanying business risk. For the study, we conducted a survey to 64 decision makers working in banks and IT service companies, and analysed the data using factor analysis and multi-regression analysis method of SPSS. As a result, we extracted statistically valid decision model with 4 major decision criteria, which are IT external, IT internal, IT ecology and Executive's will factor. Among them, we concluded only IT internal and IT ecology criteria give significant influence over the replacement decision of existing core banking system.

A Study on Logicality for the Periodic Replacements of Continuous Welded Rail based on Accumulated Passing Tonnage (누적통과톤수에 의한 레일교체기준의 타당성 분석)

  • Sung, Deok-Yong;Kong, Sun-Yong;Kim, Park-Jin;Shin, Hyo-Jung;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1058-1070
    • /
    • 2007
  • Internal and external railway management corporations are using the periodic replacement criteria of rail by accumulated passing tonnage and wear to maintain rails for servicing. However, internal the periodic replacement criteria of continuous welded rail(CWR) by accumulated passing tonnage is the one(50kg/m-5 million gross tonnage, 60kg/m-6 million gross tonnage) presented in Japan before. It was estimated with the fatigue life about 50kg N rail joints applied diesel train load but it wasn't applied to current conditions of track; elimination of rail joint, using the concrete slab track and operation of light train load and effect of welding, manufacturing technique, grinding of rail. Therefore, in this study, it was investigated the types of damage and cause in welded rails and examined standards and information resources. Also, this study presents preliminary data to revise the periodic replacement criteria of CWR by current accumulated passing tonnage in bending test of laid welded rail and a survey of track maintenance history of Seoul metro.

  • PDF

A Bayesian approach to maintenance strategy for non-renewing free replacement-repair warranty

  • Jung, K.M.
    • International Journal of Reliability and Applications
    • /
    • v.12 no.1
    • /
    • pp.41-48
    • /
    • 2011
  • This paper considers the maintenance model suggested by Jung and Park (2010) to adopt the Bayesian approach and obtain an optimal replacement policy following the expiration of NFRRW. As the criteria to determine the optimal maintenance period, we use the expected cost during the life cycle of the system. When the failure times are assumed to follow a Weibull distribution with unknown parameters, we propose an optimal maintenance policy based on the Bayesian approach. Also, we describe the revision of uncertainty about parameters in the light of data observed. Some numerical examples are presented for illustrative purpose.

  • PDF

REPLACEMENT OF POSTERIOR RESTORATIONS (구치부 수복물의 재수복에 관한 연구)

  • Kim, Ji-Young;Choi, Kyoung-Kyu;Park, Sang-Jin
    • Restorative Dentistry and Endodontics
    • /
    • v.31 no.6
    • /
    • pp.460-469
    • /
    • 2006
  • This article complies a survey on the replacement of the posterior restorations and accesses possible factors that influence the replacement of posterior restorations. The data was collected from patients that visited department of conservative dentistry from Dec 1st 2003, to Sep 3rd 2004. Teeth was restricted to posterior permanent teeth. 9 dentists recorded age, gender of patients, tooth location, cavity farm and restorative material. They rated marginal adaptation, anatomic form, secondary caries of old restoration by modified Ryge criteria system. The statistical analysis was performed with Chi square test (p < 0.05) for replacement ratio according to patients, tooth factor and One way ANOVA was performed for comparison of old restoration according to restorative material. The results were as follows; 1. The female (62%) was statistically higher ratio than the male (38%). 2. The distribution of replacement case according to age, the rate of replacement was in descending order, 20's (38.3%), 40's (16.8%), 30's (15.9%), 10's (11.1%), 50's (9.2%), 60's (8.7%). 3. The rate of replacement was 88% for molar and 12% for premolar (p $gt; 0.05). 4. The rate of replacement was 39% for maxillar and 61% for mandible (p $gt; 0.05). 5. The material of restorations was amalgam (69%), gold inlay (17%), composite resin (13%). 6. In rating system by modified Ryge criteria system on margin adaptation, there was statistically significant difference between amalgam and gold inlay. But on anatomic form and caries, there was no statistically significant difference among the material of restorations.

Investigation on Replacement Criteria for Aged Diesel Driven Power Generation Facility by Monte Carlo Simulation (몬테카를로 시뮬레이션을 통한 노후 디젤발전설비 교체기준 고찰)

  • Park, Myungsoo;Song, Gee Wook;Seo, Sang Il;Won, Dong Ju
    • Transactions of the KSME C: Technology and Education
    • /
    • v.2 no.2
    • /
    • pp.89-97
    • /
    • 2014
  • The diesel driven power generation facility provides most of electricity of island region where is isolated from the main land power supply system. It is possible to extend the life of diesel driven power generation facility by periodic maintenance. However, the long-term use of diesel driven power generation facility increases the operating cost due to aging hardware and reduced plant efficiency. In other words, on-time replacement of aging diesel driven power generation facility reduces plant operation cost. The purpose of this study presents major indicators to represent the characteristics of the diesel generator and conducts sensitivity analysis using Monte Carlo analysis. In addition, status core which indicates quantitatively the state of the diesel driven power generation facility is defined and prepare the replacement criteria based on the state score.

Development of replacement priority by analysis of effect of water meter replacement (수도미터 교체 우선순위 선정기준 개발)

  • Son, Dong-Wan;Kim, Dong-Hong;Lee, Doo-Jin;Jung, Kwan-Sue
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.28 no.5
    • /
    • pp.509-516
    • /
    • 2014
  • This study describes a reasonable planning method for water meter replacement which can minimize the metering under-registration for an increasement of revenue water. The increment analysis of real water usage was used to establish a replacement plan. The meter replacement database collected from K City was used as the basis of this analysis. The database included 964 connections of domestic and non-domestic consumers that had their meter replaced by aging at 2011. The result showed that the corelation between unregistered water volume and water meter age was lower than commonly expected where the current criteria of replacement is only water meter age(8 years) excluding the meters older than 13 years. And in the analysis result of water usage for 8 years, the total amount and increment of water usage had a significant effect on unregistered water volume. However the relation was different tendency as a total volume and slope of increment. In case of total water volume was larger than 10,000, larger than 7,000 and increment of 0.0 ~ -0.3, larger than 6,000 and increment more than -0.3 were analysed to need a replacement because of metering under-registration.

Replacement Model Following the Expiration of Free RRNMW (무료 재생교체-비재생수리보증이 종료된 이후의 교체모형)

  • Jung, Ki-Mun
    • Communications for Statistical Applications and Methods
    • /
    • v.18 no.6
    • /
    • pp.697-705
    • /
    • 2011
  • This paper proposes an optimal replacement policy following the expiration of a free renewing replacement-non-renewing minimal repair warranty. To do so, the free renewing replacement-non-renewing minimal repair warranty is defined and then the maintenance model following the expiration of free renewing replacement-non-renewing minimal repair warranty from the user's point of view is studied. As the criteria to determine the optimality of the maintenance policy, we consider the expected cost rate per unit time from the user's perspective. We derive the expressions for the expected cycle length and the expected total cost to obtain the expected cost rate per unit time. Finally, the numerical examples are presented for illustrative purposes.