A Study on Logicality for the Periodic Replacements of Continuous Welded Rail based on Accumulated Passing Tonnage

누적통과톤수에 의한 레일교체기준의 타당성 분석

  • 성덕룡 (서울산업대학교 철도전문대학원 철도건설공학과) ;
  • 공선용 (서울산업대학교 철도전문대학원 철도건설공학과) ;
  • 김박진 (서울산업대학교 철도전문대학원 철도건설공학과) ;
  • 신효정 (서울메트로 철도토목팀) ;
  • 박용걸 (서울산업대학교 철도전문대학원 철도건설공학과)
  • Published : 2007.11.08

Abstract

Internal and external railway management corporations are using the periodic replacement criteria of rail by accumulated passing tonnage and wear to maintain rails for servicing. However, internal the periodic replacement criteria of continuous welded rail(CWR) by accumulated passing tonnage is the one(50kg/m-5 million gross tonnage, 60kg/m-6 million gross tonnage) presented in Japan before. It was estimated with the fatigue life about 50kg N rail joints applied diesel train load but it wasn't applied to current conditions of track; elimination of rail joint, using the concrete slab track and operation of light train load and effect of welding, manufacturing technique, grinding of rail. Therefore, in this study, it was investigated the types of damage and cause in welded rails and examined standards and information resources. Also, this study presents preliminary data to revise the periodic replacement criteria of CWR by current accumulated passing tonnage in bending test of laid welded rail and a survey of track maintenance history of Seoul metro.

Keywords