• Title/Summary/Keyword: Repair Cost

Search Result 689, Processing Time 0.027 seconds

HTSC and FH HTSC: XOR-based Codes to Reduce Access Latency in Distributed Storage Systems

  • Shuai, Qiqi;Li, Victor O.K.
    • Journal of Communications and Networks
    • /
    • v.17 no.6
    • /
    • pp.582-591
    • /
    • 2015
  • A massive distributed storage system is the foundation for big data operations. Access latency performance is a key metric in distributed storage systems since it greatly impacts user experience while existing codes mainly focus on improving performance such as storage overhead and repair cost. By generating parity nodes from parity nodes, in this paper we design new XOR-based erasure codes hierarchical tree structure code (HTSC) and high failure tolerant HTSC (FH HTSC) to reduce access latency in distributed storage systems. By comparing with other popular and representative codes, we show that, under the same repair cost, HTSC and FH HTSC codes can reduce access latency while maintaining favorable performance in other metrics. In particular, under the same repair cost, FH HTSC can achieve lower access latency, higher or equal failure tolerance and lower computation cost compared with the representative codes while enjoying similar storage overhead. Accordingly, FH HTSC is a superior choice for applications requiring low access latency and outstanding failure tolerance capability at the same time.

The Incremental Cost Matrix Procedure for Locating Repair Service Centers in Multinational Reverse Logistics

  • Chen, Hsin Min;Hsieh, Chih Kuang;Wu, Ming Cheng;Luo, Shin Wei
    • Industrial Engineering and Management Systems
    • /
    • v.8 no.3
    • /
    • pp.194-200
    • /
    • 2009
  • This study provides a heuristic algorithm to solve the locating problem of repair service centers (RSCs). To enhance the customer service level with more satisfaction and quicker responsiveness, the locating problem of RSCs has become one of the important issues in reverse supply chain management. This problem is formulated as a zero-one mixed integer programming in which an exiting distributor will be considered to be an un-capacitated repair service center for the objective of cost-minimizing. Since logistical costs are highly interrelated with the multinational location of distributors and RSCs, the fixed cost for setting a repair service center, variable cost, transportation cost, and exchange rates are considered in this study. Recognizing the selection of un-capacitated RSCs' locations is a combinatorial optimization problem and is a zero-one mixed integer programming with NP-hard complexity, we provide a heuristic algorithm named as incremental cost matrix procedure (ICMP) to simplify the solving procedure. By using the concise and structural cost matrix, ICMP can efficiently screen the potential location with cost advantage and effectively decide which distributor should be a RSC. Results obtained from the numerical experiments conducted in small scale problem have shown the fact that ICMP is an effective and efficient heuristic algorithm for solving the RSCs locating problem. In the future, using the extended ICMP to solve problems with larger industrial scale or problems with congestion effects caused by the variation of customer demand and the restriction of the RSC capacity is worth a further investigation.

Efficient and Low-Cost Metal Revision Techniques for Post Silicon Repair

  • Lee, Sungchul;Shin, Hyunchul
    • JSTS:Journal of Semiconductor Technology and Science
    • /
    • v.14 no.3
    • /
    • pp.322-330
    • /
    • 2014
  • New effective techniques to repair "small" design errors in integrated circuits are presented. As semiconductor chip complexity increases and the design period becomes tight, errors frequently remain in a fabricated chip making revisions required. Full mask revision significantly increases the cost and time-to-market. However, since many "small" errors can be repaired by modifying several connections among the circuit blocks and spare cells, errors can frequently be repaired by revising metal layers. Metal only revision takes significantly less time and involves less cost when compared to full mask revision, since mask revision costs multi-million dollars while metal revision costs tens of thousand dollars. In our research, new techniques are developed to further reduce the number of metal layers to be revised. Specifically, we partition the circuit blocks with higher error probabilities and extend the terminals of the signals crossing the partition boundaries to the preselected metal repair layers. Our partitioning and pin extension to repair layers can significantly improve the repairability by revising only the metal repair layers. Since pin extension may increase delay slightly, this method can be used for non-timing-critical parts of circuits. Experimental results by using academia and industrial circuits show that the revision of the two metal layers can repair many "small" errors at low-cost and with short revision time. On the average, when 11.64% of the spare cell area and 24.72% of the extended pins are added to the original circuits, 83.74% of the single errors (and 72.22% of the double errors) can be corrected by using two metal revision. We also suggest methods to use our repair techniques with normal commercial vender tools.

Replacement Model Following the Expiration of Free RRNMW (무료 재생교체-비재생수리보증이 종료된 이후의 교체모형)

  • Jung, Ki-Mun
    • Communications for Statistical Applications and Methods
    • /
    • v.18 no.6
    • /
    • pp.697-705
    • /
    • 2011
  • This paper proposes an optimal replacement policy following the expiration of a free renewing replacement-non-renewing minimal repair warranty. To do so, the free renewing replacement-non-renewing minimal repair warranty is defined and then the maintenance model following the expiration of free renewing replacement-non-renewing minimal repair warranty from the user's point of view is studied. As the criteria to determine the optimality of the maintenance policy, we consider the expected cost rate per unit time from the user's perspective. We derive the expressions for the expected cycle length and the expected total cost to obtain the expected cost rate per unit time. Finally, the numerical examples are presented for illustrative purposes.

A Study on Characteristics of Damageability and Repairability with Similar Platform Type at Low Speed 40% Offset Crash Test (동일 플렛폼 차량에 대한 저속 충돌시 손상성 수리성에 미치는 영향에 관한 연구)

  • Lim, Jong-Hun;Park, In-Song;Heo, Seung-Jin
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.13 no.2
    • /
    • pp.108-113
    • /
    • 2005
  • The damageability and repairability of similar platform type vehicles could be very concerned with design optimization. In all the vehicles crash tested, small size passenger vehicles were weakness in aspect of damageability and repairability. The most critical area appears to be repair cost considering that parts cost is the largest portion of total repair cost segments. Besides repair cost, attaching method of front sidemember and subframe are placed special importance for impact energy absorption and damageability and repairability. So in order to improve damageability and repairability of vehicle structure and body component of the monocoque type passenger vehicles, the end of front side member and front back beam should be designed with optimum level and to supply the end of front side member as a partial condition approx 300mm. The effectiveness of design concept on the 40% offset frontal impact characteristics of the passenger vehicle structure is investigated and summarized.

A Probabilistic Analysis on the Repair and Replacement Cost of Educational Facilities (교육시설물의 수선교체비용에 대한 확률론적 분석 연구)

  • Yu, Yeong-jin;Son, Kiyoung;Kim, Ji-Myong;Kim, Taihui
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.25 no.1
    • /
    • pp.3-12
    • /
    • 2018
  • Educational facilities are more uncertain about maintenance costs due to their comprehensive and long life-cycle compared to commercial buildings. In addition, maintenance of the existing post management system can not maintain the original function of education facilities continuously and economically. In order to overcome this problem, it is necessary to analyze the repair and replacement cost for the uncertainty factor in maintenance. This study propose a model to determine repair and maintenance cost and cycle of educational facility based on probabilistic estimation concept. For the analysis, Monte Carlo simulation, a probabilistic analysis method, was applied based on the repair and maintenance history data of the educational facilities in Florida. The results of this study can be used as a guideline for quantitative facility management and facility management research.

The ($\textsc{k}, t_p$) Replacement Policy for the System subject to Two Types of Failure

  • Lee, Seong-Yoon
    • Journal of the military operations research society of Korea
    • /
    • v.25 no.2
    • /
    • pp.144-157
    • /
    • 1999
  • In this paper, we consider a new preventive replacement policy for the system which deteriorates while it is in operation with an increasing failure rate. The system is subject to two types of failure. A type 1 failure is repairable while a type 2 failure is not repairable. In the new policy, a system is replaced at the age of $t_p$ or at the instant the$\textsc{k}^{th}$ type 1 failure occurs, whichever comes first. However, if a type 2 failure occurs before a preventive replacement is performed, a failure replacement should be made. We assume that a type 1 failure can be rectified with a minimal repair. We also assume that a replacement takes a non-negligible amount of time while a minimal repair takes a negligible amount of time. Under a cost structure which includes a preventive replacement cost, a failure replacement cost and a minimal repair cost, we develop a model to find the optimal ($\textsc{k},t_p$) policy which minimizes the expected cost per unit time in the long run while satisfying a system availability constraint.

  • PDF

A Study on Effect of Repair and Improvement for Irrigation Facilities on Heavy Rain Damage (수리시설개보수사업이 호우피해에 미치는 효과 분석)

  • Lim, Cheong-Ryong;Yi, Hyang-mi;Lee, Seok-Joo
    • Journal of Korean Society of Rural Planning
    • /
    • v.24 no.1
    • /
    • pp.61-66
    • /
    • 2018
  • The purpose of this study is to identify the factors related to the heavy rain damage and to identify effect of repair and improvement for irrigation facilities on heavy rain damages. The results of the analysis are as follows. First, the imbalance of precipitation became worse over time from using the coefficient of variation. Second, the analysis using Spearman correlation coefficient shows positive relationship between heavy rain damage amount and precipitation amount, and negative correlation between heavy rain damage amount and repair and improvement for irrigation facilities cost. Third, the analysis of the panel regression model shows that the negative impact of the repair and improvement for irrigation facilities cost on the heavy rain damage, which means that the increase of the repair and improvement for irrigation facilities cost can reduce the heavy rain damage.

A Study on Operation Systems of Preservation & Repair Expenses for Architectural Heritage in Japanese Colonial Era - Focused on Classification of Preservation Cost Construction & Preservation Cost-Aided Construction - (일제강점기 「고건축물」 보존수리 공사비용 운용시스템에 관한 연구 - 「보존비공사」와 「보존비보조공사」 분류체계에 대하여 -)

  • Seo, Dong-Chun
    • Korean Journal of Heritage: History & Science
    • /
    • v.50 no.4
    • /
    • pp.82-103
    • /
    • 2017
  • Systems operating construction expenses for preservation and repair of the architectural heritage may be divided into two in the Japanese colonial era. They are preservation cost nd preservation cost-aided constructions, according to the ownership of a building. Preservation cost construction refers to preservation and repair of government-owned buildings that Japanese Government General of Korea had the ownership and the right of management, and preservation cost-aided construction means preservation and repair of private buildings such as Buddhist temples. In the case of preservation and repair of buildings owned by the government, it was done by the Japanese Government General of Korea, so the same agent executed the budget and managed the properties. They included royal tombs and relics, old government offices, Hyanggyo and some Seowon. On the other hand, in the case of preservation and repair of private buildings, they were private properties, so Japanese Government General of Korea had rights only for permission of preservation and repair. If there was a request for .preservation and repair by an owner, the Japanese Government General of Korea decided on whether it would support its expenses or not and played a role of management and supervision. It applied to Buddhist shrines and pagodas owned by Buddhist temples and shrines and temples owned by individuals and families. Hence, in the case of government-owned buildings, because the preservation cost was spent from the Japanese Government General of Korea's budget for investigation expenses of historical remains or repair expenses of Jeolleung and ruins, they were classified into preservation cost constructions. As for private buildings, the cost was spent from their budget for aiding preservation expenses, so they were classified into preservation cost-aided constructions. Because preservation cost construction and preservation cost-aided construction were conducted by two different agents, there were a little difference in procedures for executing a construction. There was no big difference in the general progress of constructions but was an administrative difference in the kinds of documents submitted and the roles of field supervisors. Such dual systems remained unimproved throughout the Japanese colonial era. The Japanese Government General of Korea was the colonial government so much influenced by the Japanese Government. Most Japanese architectural heritage was owned by Buddhist temples and Shinto shrines and there was almost no building owned by the government, resulting in a unitary system unlike Korea. Heritage system by the Japanese Government General of Korea was established under the influence of Japan regardless of the situation in Korea. Accordingly, Japanese Government General of Korea could not present a definite solution in the bisected system of preservation and repair expenses for the heritage. It shows the limits of the Japanese Government General of Korea in the colonial era.

Optimal Age Replacement Policy for a Repairable System with Increasing Minimal Repair Times at Failure (수리시간이 증가하는 수리가능한 시스템에서의 최적 교체시간의 결정)

  • 차지환;이강현;김재주
    • Journal of Korean Society for Quality Management
    • /
    • v.28 no.3
    • /
    • pp.53-58
    • /
    • 2000
  • In many cases, it is more practical and economical to repair a system than to replace the whole system or to perform a complete overhaul when it fails. The age replacement policy with minimal repair at failure is considered. The system is replaced every time its age reaches at $T_0$. For each intervening failure only minimal repair is done. The minimal repair times in a renewal period are increasing in the sense that the minimal repair times constitute a strictly increasing geometric process. The long-run expected cost rate Is obtained and the properties of the existence and the uniqueness of the optimal policy minimizing the long-run expected cost rate are derived.

  • PDF