• 제목/요약/키워드: Repair Cost

검색결과 693건 처리시간 0.034초

교량의 내진성능확보를 위한 유지보수계획의 최적화 (Optimization of Maintenance and Retrofit Planning for Reliable Seismic Performance of the Bridges)

  • 고현무;박관순;김동석;이선영
    • 한국지진공학회:학술대회논문집
    • /
    • 한국지진공학회 2002년도 춘계 학술발표회 논문집
    • /
    • pp.284-293
    • /
    • 2002
  • Using the life cycle cost concept, optimum maintenance and retrofit planning for reliable seismic performance is suggested the overall life cycle cost to be minimized including the initial cost, the costs of inspection, repair, and failure. Limit states of the bridges are defined. And failure probabilities are computed through crossing theory. The effect of maintenance and retrofit is represented using the probability of damage detection and event tree analysis. Optimization of maintenance and retrofit planning method proposed from this research was applied to numerical examples. The analysis incorporates the acceleration and site conditions prescribed in the code, and the quality of inspection methods.

  • PDF

소프트웨어 유지보수 아웃소싱 벤더의 비용에 관한 연구 (Estimation of Vendor Cost for Software Maintenance and Repair Outsourcing)

  • 유지나;김병수;최민석;오정석
    • Asia pacific journal of information systems
    • /
    • 제16권2호
    • /
    • pp.143-158
    • /
    • 2006
  • This paper considers probable determinants of the application software outsourcing costs and focuses on the service level agreement (SLA) influence. Recently, outsourcing clients and vendors have contracted SLA and tried to reflect them on outsourcing prices. While application software maintenance has been one of the most frequently outsourced functions, its cost did not reflect the service level requirements by the client. This paper empirically shows that the service urgency requirement on SLA increases the maintenance programmers' effort and thus increases the vendor's cost. This result can be used by vendors for program allocation purposes.

냉방기기별 경제성 평가 (Economic Evaluation of Various Cooling Systems)

  • 김영일;조금남
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2008년도 하계학술발표대회 논문집
    • /
    • pp.214-219
    • /
    • 2008
  • In this study, medium capacity EHP and GHP for air-conditioning a building with a floor area of $1,200\;m^2$ are compared economically. To consider all the factors of initial and operation costs effectively, an annual equal payment method is proposed. For the initial cost, equipment, construction, installation, electric facility, financial subsidy and tax cut are considered. Basic electricity, energy(electricity and gas), space charge, labor, insurance and repair are considered for the operation cost. Under the assumptions made in this study, overall cost of EHP is less than that of GHP. However, different outcome may result if different assumptions are made. This study is useful for performing an economic evaluation of various air-conditioning systems.

  • PDF

퇴화하는 기계에서의 품질 불량을 고려한 최적 생산시간 결정 (An Optimal Production Run Length in A Deteriorating Machine)

  • 김창현;홍유신
    • 대한산업공학회지
    • /
    • 제22권3호
    • /
    • pp.351-364
    • /
    • 1996
  • This paper presents on EMQ model which determines an optimal production run length in a deteriorating machine. It is assumed that a machine is subject to a random deterioration from an in-control state to an out-of-control state with on arbitrary distribution and thus producing some proportion of defective items. An optimal production run length and a minimum average cost are derived in each of three deteriorating processes; constant, linearly increasing, and exponentially increasing. The model with repair cost is also analyzed. Several mistakes in previous research are found and discussed. Numerical experiments are carried out to see the behavior of the proposed model depending on the cost factors as well as machine parameters, and some interesting behaviors are observed.

  • PDF

수율과 신뢰도의 상충효과를 고려한 번인 (Burn-in Considering a Trade-Off of Yield and Reliability)

  • 김경미
    • 산업공학
    • /
    • 제20권1호
    • /
    • pp.87-93
    • /
    • 2007
  • Burn-in is an engineering method for screening out products containing reliability defects which would cause early failures in field operation. Previously, various burn-in models have been proposed mainly focused on the trade-off of shop repair cost and warranty cost ignoring manufacturing yield. From the view point of a manufacturer, however, burn-in decreases warranty cost at the expense of yield reduction. In this paper, we provide a general model quantifying a trade-off between product yield and reliability, in which any defect distribution from previous yield models can be used. A profit function is expressed in burn-in environments for determining an optimal burn-in time. Finally, the method is illustrated with gate oxide failures which is an important reliability concerns for VLSI CMOS circuits.

추계적 공동주택 장기수선충당금 산출 및 분석 방법론 개발 (Developing Stochastic Long-Term Maintenance Cost Estimating Method for Apartment Housing)

  • 곽한성;이동은
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.243-244
    • /
    • 2015
  • This paper presents a Stochastic Long-Term Maintenance Costs Estimating Method for the Apartment Housing (SLCE). A simulation approach is used for generating the stochastic long-term maintenance cost, and it is based on the defined variability in repair cycle of the individual maintenance elemental within the process. SLCE provides the probability distribution of the budget required to maintain the apartment housing. A case study is presented to demonstrate and to validate the system.

  • PDF

품질하자보증비의 추정 (Estimation of Warranty Cost)

  • 최정호;이상용
    • 산업경영시스템학회지
    • /
    • 제20권43호
    • /
    • pp.357-364
    • /
    • 1997
  • After the buyer purchases the product, the seller's role does not end. If the product fails to function properly before the end of the warranty period, the seller is responsible for its repair or replacement under the seller's warranty policy. There are two common types of warranty policies: the free replacement warranty and the rebate warranty. Under the free replacement warranty policy, replacement or repairs during the warranty period are provided by the seller free of charge to the buyer. Under the rebate warranty policy, a failed item is replaced by a new one or is repaired at a cost to the age of the failed item. The rebate warranty is most often used for items such as a battery or an automobile tire which wear out and must be replaced at failure. This paper proposes a easy way of estimating the warranty cost under the free replacement warranty policy assuming an exponential product failure function on repairable products.

  • PDF

최소 신뢰도를 보장하는 비 주기적 예방보전 모형 개발 (Developing a Non-Periodic Preventive Maintenance Model Guaranteeing the Minimum Reliability)

  • 이주현;안선응
    • 한국신뢰성학회지:신뢰성응용연구
    • /
    • 제18권2호
    • /
    • pp.104-113
    • /
    • 2018
  • Purpose: This paper proposes the non-periodic preventive maintenance policy based on the level of cumulative hazard intensity. We aim to construct a cost-effectiveness on the proposed model with relaxing the constraint on reliability. Methods: We use the level of cumulative hazard intensity as a condition variable, instead of reliability. Such a level of cumulative hazard intensity can derive the reliability which decreases as the frequency of preventive maintenance action increases. We also model the imperfect preventive maintenance action using the proportional age setback model. Conclusion: We provide a numerical example to illustrate the proposed model. We also analyze how the parameters of our model affect the optimal preventive maintenance policy. The results show that as long as high reliability is guaranteed, the inefficient preventive maintenance action is performed reducing the system operation time. Moreover, the optimal value of the proposed model is sensitive to changes in preventive maintenance cost and replacement cost.

Aircraft delivery vehicle with fuzzy time window for improving search algorithm

  • C.C. Hung;T. Nguyen;C.Y. Hsieh
    • Advances in aircraft and spacecraft science
    • /
    • 제10권5호
    • /
    • pp.393-418
    • /
    • 2023
  • Drones are increasingly used in logistics delivery due to their low cost, high-speed and straight-line flight. Considering the small cargo capacity, limited endurance and other factors, this paper optimized the pickup and delivery vehicle routing problem with time windows in the mode of "truck+drone". A mixed integer programming model with the objective of minimizing transportation cost was proposed and an improved adaptive large neighborhood search algorithm is designed to solve the problem. In this algorithm, the performance of the algorithm is improved by designing various efficient destroy operators and repair operators based on the characteristics of the model and introducing a simulated annealing strategy to avoid falling into local optimum solutions. The effectiveness of the model and the algorithm is verified through the numerical experiments, and the impact of the "truck+drone" on the route cost is analyzed, the result of this study provides a decision basis for the route planning of "truck+drone" mode delivery.

이소인 중형기선저인망어업의 원가실태에 관한 연구 (A Study on the Cost State of Medium Size Two-boat Trawler Fishery)

  • 박정호
    • 수산경영론집
    • /
    • 제8권2호
    • /
    • pp.1-19
    • /
    • 1977
  • The results analyzed of the actual state of medium size two-boat trawler fishery based on the cost expended in 1975 are as follows: According to the calculation of interest, the total cost of this fishery comes to ₩ 55,353,807, and in this account, the production cost comes to ₩ 49,747,383 (89.9%) and the material cost comes to ₩ 27,027,662(48.8%), the labour cost comes to ₩ 10,381,013 (18.8%) the expenses, ₩12,338,708(22.3%) and commision and interest comes to ₩ 5,606,424 (10.1%). As above the fishery comes is 90% of production cost for the expense of production. The ratio of cost element to the total cost 100 is as follow: Fuel: 23.6%, allocation: 14.3%, fishing gear: 14.1%, boat repair: 13.0%, fish box: 8.5%, ice: 14.1%, commission: 6.9%, food cost: 4.5%, interest: 3.2%, transportation fee: 2.8%, consumption: 2.6%, tax: 2.5%, depreciation: 2.4%, administrative expense: 1.6%. The unit cost of catches to each box, including the interest, cames to ₩ 2,167 and not calculating the interest it comes to ₩ 2,098. The cost production to each kg comes to ₩ 114 including interest, without interest, it comes ₩110. When the production cost comes to 90.6%, it comes to 9.4% of total revenue. The reason which this fishery brings low income is that the boats are almost old and semi-diesel engine is used. So, fuel expense and repaire expenses needs too much. Acconding to above this fishery needs to replace new boat and new engine. And new are for this fishery needs to bring under cultivation in order to bring good income with the new method for this fishery. Specially, this fishery brings low income from July to September because of its rest from labour. And so, the expenses, item, and account of money, and the trust money the cost element are not showed in August.

  • PDF