• Title/Summary/Keyword: Repair Cost

Search Result 689, Processing Time 0.032 seconds

Two Forms of Preventive Replacement Policy with Minimal Repair at Failure (수리사용 후 교환(交換)정책의 두 형태)

  • Park, Gyeong-Su;Gang, Ho-Seon
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.4 no.1
    • /
    • pp.1-3
    • /
    • 1978
  • This paper presents a model for determining the optimal number of minimal repairs before replacement. The basic concept parallels the periodic replacement model with minimal repair at failure introduced by Barlow and Hunter, only difference being the replacement signalled by the number of previous minimal repairs performed on the unit. In the case of Weibull distribution, which is widely used as a general failure distribution, the optimal solution could be obtained numerically and seems more cost effective compared to the Barlow and Hunter's Policy II.

  • PDF

A Study of the law-suit requesting the guarantee against defects in the Apartment Buildings (공동주택 하자보증금 청구소송의 연구)

  • Yoon, Hyung-In;Jo, Byung-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.7 no.2 s.24
    • /
    • pp.67-76
    • /
    • 2007
  • The purpose of this study is to propose the efficient improvement in the lawsuit to request the guarantee against defect. This study points out several problems about related act and subordinate statue and judgement by analyzing the character of contract in apartment house, related laws and regulations, appraisals and judicial decisions. This study deduces the necessity of the establishment of the specification and the breakdown cost for repair and maintenance work to provide the standard for the detached judgement.

A Note on Periodic Replacement with Minimal Repair at Failure

  • Park, Young Taek
    • Journal of Korean Society for Quality Management
    • /
    • v.12 no.2
    • /
    • pp.2-5
    • /
    • 1984
  • Periodic replacement model with minimal repair at failure is extended to the case where quantity purchases are possible. A recursive relationship among replacement intervals is obtained, which shows that replacement intervals are an increasing sequence due to the inventory carrying cost. Using the relationship, a procedure is given for determining how many units to purchase on each order and when to replace each unit after it has begun operating so as to minimize the total cost per unit time over an infinite time span. The problem can be simplified if equal replacement intervals are assumed, and the solution is very close to the solution of the unconstrained problem.

  • PDF

Development of Information Management System for Improving Productivity (설비생산성 향상을 위한 정보시스템 개발)

  • Kim, Tae-Hwan;Nam, Sung-Don;Choi, Sung-Hee;Kang, Kyong-Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2005.11a
    • /
    • pp.199-202
    • /
    • 2005
  • All machines and systems in a firm should be managed for optimizing its productivity. Actually, however, it is hard to manage the machines of a firm in collective methods because the company making each machine varies and the way maintaining each machine is various. As a machine Is out of order, the machine is fixed by the repair person from the company making the machine. Every time comes repair person to fix a machine firm having the machine would experience time loss and cost loss. Therefore, a firm needs to manage blueprint of their machine to reduce loss in time and cost and to maintain their facilities in TPM(Total Productive Management) to make operators manage directly. In this study, we suggest the method to manage a blueprint of a machine with TPM.

  • PDF

Failure Analysis of Austenitic Stainless Steel Pipe (오스테나이트계 스테인레스 강관에서의 손상해석에 관한 연구)

  • 이상율;이종오;이주석;조경식;조종춘;이보영
    • Journal of Welding and Joining
    • /
    • v.11 no.1
    • /
    • pp.21-32
    • /
    • 1993
  • A cracking failure of a austenitic stainless steel elbow in a naphtha cracking line in a petrochenmical plant occurred, resulting in leakage of organic compound flowing inside the elbow. Due to the failure, emergency shutdown of the plant was enforced to repair the troubled part of the line. The repair cost as well as production loss during the unscheduled plant shutdown has cost the company a great amount of financial loss. In this studies, a failure analysis of the cracked elbow was performed using NDT, chemical analysis, microstructural analysis including optical microscopy as well as scanning electron microscopy with EPMA, mechanical testings such as tensile testing, hardness testing and Charphy impact test fractography. The results indicated that several problems such as a welding defect and presence of a detrimental phase which was found to be relate to improper postforming heat treatment process was identified and the failure was concluded to be due to a low temperature embrittlement of the defect-containing elbows.

  • PDF

The structural analysis of bogie for high speed freight car (고속화차용 용접대차의 구조강도해석)

  • 황원주;함영삼;권성태;허현무;전응식
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.217-221
    • /
    • 2001
  • Barber bogie and Y25 bogie is the main bogie of freight car which is used in the Korean railway. In case of Barber bogie and a mixed formation tile maximum speed limit of empty car is 70 km/h and that of loaded car is 90 km/t and also it runs a speed of 110 km/h in time of an exclusive formation of Y25 bogie. The car named as high speed freight car at present is Y25 bogie which modeled on the Y25 bogie or Europe developed in 1993, Y25 bogie has no problem about the running capacity up to the speed of 110 km/h, but it works as limiting factors to tile increasing cost of maintenance and repair expenses which caused by repair of bogie and the cost of materials. This study is going to describe the contents examined by analysis and tests, aimed at being used as an index of plan in the future through the strength test of high speed freight car which is used now.

  • PDF

Study on the Evaluation Methode of HVDC Cable (HVDC 케이블 평가방법 연구)

  • An, Y.H.;Jang, T.I.;Jung, G.J.;Yu, H.Y.;Kim, J.N.;Jeon, S.I.;Han, B.S.
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2005.07a
    • /
    • pp.229-231
    • /
    • 2005
  • HVDC(High Voltage Direct Current) is an underwater cable between Jeju Island and Haenam in main land and supplies approximately 50% of electrical usage in Jeju Island. If there is any power failure due to HVDC, it will cost approximately 50,000 US dollars per day including Thermal Electrical Generation. Therefore it is absolutely necessary to recover the problem in rapid timely basis. In conclusion, evaluation methode of HVDC cable is needed urgently to upgrade current HVDC underwater cable repair technique in Korea to minimize the cost and time factors.

  • PDF

Developing a Decision-Making Model to Determine the Preventive Maintenance Schedule for the Leased Equipment (대여 장비의 예방정비 일정 결정을 위한 의사 결정 모델 개발)

  • Lee, Ju-hyun;Bae, Ki-ho;Ahn, Sun-eung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.2
    • /
    • pp.24-31
    • /
    • 2018
  • As a system complexity increases and technology innovation progresses rapidly, leasing the equipment is considered as an important issue in many engineering areas. In practice, many engineering fields lease the equipment because it is an economical way to lease the equipment rather than to own the equipment. In addition, as the maintenance actions for the equipment are costly and need a specialist, the lessor is responsible for the maintenance actions in most leased contract. Hence, the lessor should establish the optimal maintenance strategy to minimize the maintenance cost. This paper proposes two periodic preventive maintenance policies for the leased equipment. The preventive maintenance action of policy 1 is performed with a periodic interval, in which their intervals are the same until the end of lease period. The other policy is to determine the periodic preventive maintenance interval minimizing total maintenance cost during the lease period. In addition, this paper presents two decision-making models to determine the preventive maintenance strategy for leased equipment based on the lessor's preference between the maintenance cost and the reliability at the end of lease period. The structural properties of the proposed decision-making model are investigated and algorithms to search the optimal maintenance policy that are satisfied by the lessor are provided. A numerical example is provided to illustrate the proposed model. The results show that a maintenance policy minimizing the maintenance cost is selected as a reasonable decision as the lease term becomes shorter. Moreover, the frequent preventive maintenance actions are performed when the minimal repair cost is higher than the preventive maintenance cost, resulting in higher maintenance cost.

The Analysis of the Management Efficiency and Impact Factors of Smart Greenhouse Business Entities - Focusing on the Business Entities of Strawberry Cultivation in Jeolla-do - (스마트온실 경영체의 경영 효율성 및 영향요인 분석 - 전라권 딸기 재배 경영체를 중심으로-)

  • Ha, Ji Young;Lee, Seung Hyun;Na, Myung Hwan;Kim, Deok Hyeon;Lee, Hye Lim;Lee, Yong Gyeon
    • Journal of Korean Society for Quality Management
    • /
    • v.49 no.2
    • /
    • pp.213-231
    • /
    • 2021
  • Purpose: This study intends to provide decision-making information to improve efficiency by analyzing the management efficiency of smart greenhouse business entities and identifying factors that affect the efficiency based on input and output. Methods: The subjects of analysis were business entities for cultivating strawberries in smart greenhouses in Jeolla region (northern and southern Jeolla provinces), and the analysis focused on the management performance of the 2019-2020 crop period (year). Data Envelopment Analysis(DEA) was applied as an analysis method for efficiency analysis, Quantile Regression(QR) analysis was applied as a factor affecting the efficiency. Results: The reason for the efficiency gap between business entities was that there were many business entities that did not minimize the input cost at the current level of output, and the area where the variance among business entities was large was the fixed cost per 10a. In the results of the affecting factor analysis, it was found that the seed-seedlings cost, fertilizer cost, other material cost, and employment and labor cost had a negative (-) effect on the efficiency, and that the repair and maintenance cost had a positive (+) effect. Conclusion: Therefore, to achieve the efficiency of scale, it is necessary to reduce the input scale to an appropriate level. In the case of business entities with low efficiency by quartile, the seed-seedlings, fertilizer, and other material costs reduce expenditures, and repair maintenance costs can improve efficiency by increasing expenditures.

Minimum Expected Life Cycle Cost Model for Optimal Seismic Design and Upgrading of Long Span PC Bridges (장대 PC교량의 최적 내진설계 및 성능개선을 위한 최소 기대 Life Cycle Cost 모델)

  • 조효남;임종권
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1999.04a
    • /
    • pp.305-312
    • /
    • 1999
  • This study is intended to propose a systematic and practical life cycle cost(LCC) model for the development of the reliability-based seismic safety and cost-effective performance criteria for design and upgrading of long-span PC bridges. The LCC models consist of five cost functions such as initial cost, repair/replacement cost, human losses, road user cost, and indirect losses of regional economy. The proposed model Is successfully expressed in temrs of Park-Ang damage indices and life cycle damage probability obtained from SMART-DRAIN-2DX which is an existing algorithm for nonlinear time history analysis. The proposed LCC model is successfully applied to a viaduct constructed by PSM, in Seoul. Based on the observations, the proposed systematic procedure for the formulation of LCC model may be useful for the development of the reliability-based seismic safety and cost-effective performance criteria for design and upgrading of long-span PC bridges.

  • PDF