Kim, Deok-Won;Park, Ji-Su;Oh, Eun-Ji;Yoo, Jin;Kim, Deok-Hyeon;Chung, Keun-Yook
공업화학
/
제33권6호
/
pp.666-674
/
2022
The removal efficiencies of nutrients (N and P) and heavy metals (Cu and Ni) by Rhodobacter blasticus and R. blasticus attached to polysulfone carriers, alginate carriers, PVA carriers, and PVA + zeolite carriers in synthetic wastewater were compared. In the comparison of the nutrient removal efficiency based on varying concentrations (100, 200, 500, and 1000 mg/L), R. blasticus + polysulfone carrier treatment showed removal efficiencies of 98.9~99.84% for N and 96.92~99.21% for P. The R. blasticus + alginate carrier treatment showed removal efficiencies of 88.04~97.1% for N and 90.33~97.13% for P. The R. blasticus + PVA carrier treatment showed removal efficiencies of 18.53~44.25% for N and 14.93~43.63% for P. The R. blasticus + PVA + zeolite carrier treatment showed removal efficiencies of 26.65~64.33% for N and 23.44~64.05% for P. In addition, at the minimum inhibitory concentration of heavy metals, R. blasticus (dead cells) + polysulfone carrier treatment showed removal efficiencies of 7.77% for Cu and 12.19% for Ni. Rhodobacter blasticus (dead cells) + alginate carrier treatment showed removal efficiencies of 25.83% for Cu and 31.12% for Ni.
In this study, we analyzed $NO_x$ and $SO_x$ removal efficiencies by a pulsed corona discharge process and investigated the effect of several process variables. The removal efficiencies of NO and $SO_2$ were measured changing the process variables of initial concentrations of NO, $H_2O$, and $NH_3$, $SO_2$, applied voltage, pulse frequency and residence time. As the applied voltage or the frequency of applied voltage or the residence time increases, the NO and $SO_2$ removal efficiencies increase. The NO and $SO_2$ removal efficiencies also increase by the addition of $O_2$ or $H_2O$, or by using the large diameter of the discharge electrode. The experimental results can be used as a basis to design the pulsed corona discharge process to remove $NO_x$, $SO_x$ and VOCs.
This study investigated the decomposition of fenitrothion in Smithion, which is applied on the golf course for pesticide, by the integrated Zero-valent iron(ZVI) and Granular activated carbon(GAC) process. First, the removal efficiencies of the fenitrothion by ZVI and GAC, respectively, were investigated. Second, the removal efficiencies of the fenitrothion by the integrated ZVI and GAC were investigated. The removal efficiencies of fenitrothion by ZVI were higher than those of TOC. The removal efficiencies of fenitrothion and TOC by GAC were similar. As the dosages of ZVI and GAC were increased, the removal efficiencies of fenitrothion and TOC increased. However, as the dosages of ZVI for pretreatment were increased, the adsorptions of fenitrothion on GAC were hindered.
The removal efficiencies of organic substrates, nitrogen and phosphorus in the anaerobic-aerobic biological phosphorus removal process were investigated by addition of acetic acid, propionic acid and butyric acid which are normal volatile fatty acids contained in anaerobic digester supernatants. Substrate utilization coefficients for the phosphorus release and uptake were also estimated. The effect of a VFA, which showed higher phosphorus removal efficiency than the other VFAs did, was also studied in an anaerobic-aerobic-anoxic biological nutrient removal process. For the anaerobic-aerobic process added by VFA, the phosphorus removal efficiencies were up to about 68%, 55% and 61% for the reactors of acetic acid, propionic acid and butyric acid added, respectively, which indicates the efficiencies were increased by about 8-21%, comparing to that of 47% for the reactor with no VFA added. There were no significant difference in removal efficiencies for organic substrate and $NH_3-N$ without regard to addition of VFA. However, the removal efficiency of total nitrogen was increased in the case of VFA added, since $NO_3-N$ was less produced. For the anaerobic-aerobic-anoxic process added VFA, the removal efficiencies for $NH_3-N$ and $PO{_4}^{3-}-P$ were increased by 5% and 13%, respectively, comparing with them in the reactors not added VFA.
This study mainly concentrated on the treatment of nightsoil by an anaerobic filter media process. Nightsoil has been one of the major water pollutants in this couotry. It represents high ROD and SS concentrations. A comprehensive laboratory study conducted at Kangwoon National University indicate: (1) In the case of anaerobic filter system, COD and BOD removal efficiencies were greatly influenced by hydraulic retention time(HRT), but SS removal efficiencies dropped slowly when HRT were 2~13 days. (2) COD removal efficiencies were 19% when HRT were 15 days, 14% when HRT were 8 days, 10% when HRT were 6 days, 9% when HRT were 4 days, 2% when HRT were 2 days. (3) BOD removal efficiencies were 23% when HRT were 15 days, 14% when HRT were 8 days, 18% when HRT were 6 days, 7% when HRT were 4 days, 5.8% when HRT were 2days. (4) SS removal efficiencies were 21%~25%(2~15 days HRT).
The purpose of this study was to investigate removal efficiencies of contaminants in night soil treatment plant using the B3 system. The samples were collected from retaining tank and settlement tank in Yechon night soil plant. We experimented concentrations of BOD, COD, SS, TN and TP. Concentration data were processed using removal efficiencies by season and correlation analysis with pilot running parameters. Removal efficiencies of total organic carbon was over 96%, TN was 98% during summer, 80.9% during winter. In the case of TP, the highest removal efficiencies was 94.1% during fall and the lowest removal efficiencies was 82% during spring. Results of correlation analysis showed two positive correlation groups and one negative group. Positive correlations were among temperature, BOD and TN. The others were pH, BOD, COD, SS, TN and TP. Negative correlation were among MLSS, BOD, COD, SS, TN, TP.
Removal of nutrients from domestic sewage or industrial wastewater is needed to protect surface waters from eutrophication. This research was carried out to remove the nitrogen (N) and phosphorus (P) from the wastewater using the iron oxide obtained from the steel industry and the natural zeolite, respectively. This research was conducted in both batch and continuous systems. The removal efficiency of the nutrients was evaluated in the batch system using the varying concentrations of zeolite and iron oxide added. The removal efficiency of N was 60% at the 8g of zeolite added. In the same condition, the removal efficiencies of N were 76% and 82% at 12g and 16g of zeolite added, respectively. Removal efficiency of P was 80% as 8g of iron oxide was added. The removal efficiency of P was correspondingly increased as the concentration of iron oxide was increased. Continuous column system was also used to evaluate the removal efficiency of N and P by the addition of zeolite and ferric oxide, respectively. Removal efficiencies of N were compared in the mixed packing, two stage, and four stage columns, respectively. The removal efficiencies (80%) of N in the separate packed columns (two and four stages) were higher than the mixed packing column (400%) after 90 hr. Whereas, the removal efficiencies of P were similar to each other in the three columns.
In this study, nutrients treatment by sequencing batch reactors(SBR) was performed. Nitrogen and phosphorus removal efficiencies were evaluated by changing SRT and mixing/aeration ratio. Not only nitrogen but also phosphorus removal patterns were investigated through track studies on 1 cycle. As SRT was fixed and mixing/aeration ratio was changed, maximum nitrogen removal efficiency was 87.6% at mixing/aeration ratio 0.67. Phosphorus removal efficiencies were more than 85.5% except no mixing condition. As mixing/aeration ratio was fixed and SRT was changed, nitrogen removal efficiencies were 70.5~79.8%, which represented slight changes, while phosphorus removal efficiencies were 49.0~97.3%, which represented sharply decreasing tendency at less than 20 day. Both phosphorus release rate k and maximum phosphorus release rate $P_{max}/M$ were are decreased as SRT was decreased, but they were not affected by mixing/aeration ratio. It was found that there is a linear relationship between ortho-phosphate uptake and maximum ortho-phosphate release.
This study was to discuss limiting factors influenced on the removal efficiencies of nitrogenous compounds investigated using the polypropyrene media which was to attach microorganism in order to apply the fixed-biofilm process. The main limiting factors are the hydraulic retention time (HRT), C/N ratio, $COD/NO_{3}-N$ ratio and temperature. The hydraulic retention time HRT were 6, 8, 10, 12 hrs and the C/N ratio range was 2.5-9.5. The $COD/NO_{3}-N$ ratio range was 3.2-21.9 and the temperature were 15, 20, 25, 30, $35^{\circ}C$, respectively. The results of this study are summerized as follows. 1. Hydraulic retention time (HRT) to obtain removal efficiencies of T-N higher than 85% had to be 10 hrs above. 2. The removal efficiencies of T-N decreased at C/N ratio from 6.2 to 4.8 in this anoxic-contact aeration system. 3. Denitrification rate decreased at $COD/NO$_{3}$-N$ ratio from 8.0 to 5.0 4. As temperature increased, removal efficiencies of T-N increased.
The purposes of this research are to know the dust removal efficiency according to the changes of gab between positive and negative plates in dust removal chamber. The experiments for dust removal efficiencies were conducted with changing the electrode-plate gab from 2 cm to 1 cm while the electric pressure, influent flow, and linear velocity were kept 5 kV, 80 L/min, and 6 cm/sec, respectively. From the experimental results of the electrode-plate gab of 2 cm, dust removal efficiencies were decreased to as low as about 50%. Attached dust on the surface of electrodes was released due to a reverse electric charge of dust. From the experimental results of the electrode-plate gab of 1 cm, dust removal efficiencies were increased to as high as about 80% due to the dust attachment velocity to the electrodes to be far more fast than influent linear velocity. Finally, to protect a attached dust from occurring a reverse electric charge it is needed to install the non-conductor between positive and negative electrodes and also to remove air humidity.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.