• Title/Summary/Keyword: Reliability Improvement

Search Result 1,897, Processing Time 0.027 seconds

Bayesian analysis of a repairable system subject to overhauls with bounded failure intensity

  • Preeti Wanti, Srivastava;Nidhi, Jain
    • International Journal of Reliability and Applications
    • /
    • v.14 no.2
    • /
    • pp.55-70
    • /
    • 2013
  • This paper deals with the Bayesian analysis of the failure data of a repairable mechanical system subject to minimal repairs and periodic overhauls. The effect of overhauls on the reliability of the system is modeled by a proportional age reduction model and the failure process between two successive overhauls is assumed to be 2-parameter Engelhardt-Bain process (2-EBP). Power Law Process (PLP) model has a disadvantage which 2-EBP can overcome. On the basis of the observed data and of a number of suitable prior densities, point and interval estimation of model parameters, as well as quantities of relevant interest are found. Also hypothesis tests on the effectiveness of performed overhauls have been developed using Bayes factor. Sensitivity analysis of improvement parameter is carried out. Finally, a numerical application is used to illustrate the proposed method.

  • PDF

A Study on Face Recognition and Reliability Improvement Using Classification Analysis Technique

  • Kim, Seung-Jae
    • International journal of advanced smart convergence
    • /
    • v.9 no.4
    • /
    • pp.192-197
    • /
    • 2020
  • In this study, we try to find ways to recognize face recognition more stably and to improve the effectiveness and reliability of face recognition. In order to improve the face recognition rate, a lot of data must be used, but that does not necessarily mean that the recognition rate is improved. Another criterion for improving the recognition rate can be seen that the top/bottom of the recognition rate is determined depending on how accurately or precisely the degree of classification of the data to be used is made. There are various methods for classification analysis, but in this study, classification analysis is performed using a support vector machine (SVM). In this study, feature information is extracted using a normalized image with rotation information, and then projected onto the eigenspace to investigate the relationship between the feature values through the classification analysis of SVM. Verification through classification analysis can improve the effectiveness and reliability of various recognition fields such as object recognition as well as face recognition, and will be of great help in improving recognition rates.

On the Improvement of Facility to Performance Evaluation and Security of Safety through the Application of AHP Method in Railroad Signal Control System (철도 신호제어 시스템의 AHP 기법 적용을 통한 성능평가 대상설비 항목 개선 및 안전성 확보에 관한 연구)

  • Hwang, Sunwoo;Kim, Joouk;Kim, Youngmin;Kim, Hyungchul;Lee, Soohwan
    • Journal of the Korea Safety Management & Science
    • /
    • v.23 no.1
    • /
    • pp.71-79
    • /
    • 2021
  • The railroad facilities are intended for long-term operation as the initial acquisition costs necessary for infrastructure construction are high. Therefore, regular maintenance of railroad facilities is essential, and furthermore, system reliability through systematic performance evaluation is required. In this study, the signal control system of railroad electrical equipment was selected as the subject of research and the performance evaluation target facility selection study was conducted using AHP. The results of the study can contribute to the reliability of the signal control system as well as to the reliability of the railroad system, which is a higher system.

On Software Reliability Engineering Process for Weapon Systems (무기체계를 위한 소프트웨어의 신뢰성 공학 프로세스)

  • Kim, Ghi-Back;Lee, Jae-Chon
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.36 no.4B
    • /
    • pp.332-345
    • /
    • 2011
  • As weapon systems are evolving into more advanced and complex ones, the role of the software is becoming heavily significant in their developments. Particularly in the war field of today as represented by the network centric warfare(NCW), the reliability of weapon systems is definitely crucial. In this context, it is inevitable to develop software reliably enough to make the weapon systems operate robustly in the combat field. The reliability engineering activities performed to develop software in the domestic area seem to be limited to the software reliability estimations for some projects. To ensure that the target reliability of software be maintained through the system's development period, a more systematic approach to performing software reliability engineering activities are necessary from the beginning of the development period. In this paper, we consider the software reliability in terms of the development of a weapon system as a whole. Thus, from the systems engineering point of view, we analyze the models and methods that are related to software reliability and a variety of associated activities. As a result, a process is developed, which can be called the software reliability engineering process for weapon systems (SREP-WS), The developed SREP-WS can be used in the development of a weapon system to meet a target reliability throughout its life-cycle. Based on the SREP-WS, the software reliability could also be managed quantitatively.

A Study of BIM based estimation Modeling data reliability improvement (BIM기반 견적 모델링 데이터 신뢰성 향상을 위한 연구)

  • Kim, Yeong-Jin;Kim, Seong-Ah;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.43-55
    • /
    • 2012
  • A methodology for BIM Quality Assurance in the construction industry is becoming increasingly an important issue to determine the reliability of BIM. However, the quality assurance of BIM is currently limited to check 3D models, such as clash detection and space layout while verification methods for disciplinary BIM results from structural engineering, mechanical engineering, and estimation do not exist yet. Particularly, in the BIM-based estimation mathematical equations to take off quantities are not clearly exposed so that the results are not quite accepted at practices. With the concept of reliability engineering defined in the manufacturing industry to improve reliability of outcomes of BIM-based quantity take-off, impacting factors that affect reliability of BIM-based quantity take-off were derived. It was found that the factors also include the modeling method and the features of a BIM tool. Therefore, this research aims to propose modeling and verification methods to improve reliability of BIM-based quantity take-off through the pilot test that was performed with commercial BIM tools and IFC-based BIM data.

Modal Choice with Travel Time Reliability (통행시간 신뢰도를 고려한 통행수단선택모형에 관한 연구)

  • Nam, Doo-Hee;Park, Dong-Joo
    • Journal of Korean Society of Transportation
    • /
    • v.22 no.6
    • /
    • pp.7-16
    • /
    • 2004
  • In mode choice decision, travelers consider not only travel time but also reliability of its modes. In this paper, reliability was expressed in terms of standard deviation and maximum delay that were measured based on triangular distribution. In order to estimate value of time and value of reliability, the Multinomial and Nested Logit models were used. The analysis results revealed that reliability is an important factor affecting mode choice decisions. Elasticity is used to estimate the impacts of the different policies and system improvements for water transportation mode. Among these policies, decision maker can assess and select the best alternative by doing the benefit and cost analysis based on a new market share, the value of time, and the value of reliability. Finally, a set of promising policies and system improvement of the water transportation were proposed.

A Study on the Evaluation of Reliability for Settlement Predictions by Hyperbolic Method (침하예측을 위한 쌍곡선 식의 신뢰성 평가에 관한 연구)

  • 이승우;김유석
    • Geotechnical Engineering
    • /
    • v.13 no.6
    • /
    • pp.5-12
    • /
    • 1997
  • Predictions of settlements under preloading for the improvement of soft soil is a very important element of construction management. Due to the non uniformity, difficulty of estimating resonable soil properties, predictions of settlements and settlement velocities at the design stage seldom agree with the actual future settlements. To overcome this problem, the prediction methods based on the settlement observation of initial preloading stage such as hyperbolic method and Asaoka method have been employed frequently. However the estimating method for the reliability of these predictions at the time of prediction has not been suggested. In this study, comparisons of predicted settlements by hyperbolic met hed and observed settlements are explored through case studies. And a stratagem of estimating reliability of settlement predictions by hyperbolic method is suggested as the result of investigation on the relationship between the initial observed time and error of settlement prediction by hyperbolic method.

  • PDF

Application of the Combined Techniques for Reliability Improvement on Machine Design Process: Case Study (기계설계 과정의 신뢰성 향상을 위한 혼합 기법 응용: 사례연구)

  • Choi, Jang-Jin;Lim, Ik-Sung;Koo, Il-Sub;Park, Sung-Jun;Kim, Tae-Sung
    • Journal of Applied Reliability
    • /
    • v.14 no.1
    • /
    • pp.71-80
    • /
    • 2014
  • In the mechanical design process various types of errors are bound to occur. In order to prevent such mechanical malfunctions and decrease number of instances of errors, various technique are utilized. The purpose of this research is to demonstrate the effectiveness of the combined service Blueprint and FMEA (Failure Mode and Effect Analysis) by applying such method to machine process. The results are as follows: First, modification can be obtained by discovering the failure mode hidden within the inner side of the blueprint. Second, issues within the company are found when conducting the machine design process that is not visible from the outside. Therefore, potential errors can be effectively resolved by preventing failure mode in advance and eventually high quality of the product could be obtained as well as its reliability.

Reliability measure improvement of Phoneme character extract In Out-of-Vocabulary Rejection Algorithm (미등록어 거절 알고리즘에서 음소 특성 추출의 신뢰도 측정 개선)

  • Oh, Sang-Yeob
    • Journal of Digital Convergence
    • /
    • v.10 no.6
    • /
    • pp.219-224
    • /
    • 2012
  • In the communication mobile terminal, Vocabulary recognition system has low recognition rates, because this problems are due to phoneme feature extract from inaccurate vocabulary. Therefore they are not recognize the phoneme and similar phoneme misunderstanding error. To solve this problem, this paper propose the system model, which based on the two step process. First, input phoneme is represent by number which measure the distance of phonemes through phoneme likelihood process. next step is recognize the result through the reliability measure. By this process, we minimize the phoneme misunderstanding error caused by inaccurate vocabulary and perform error correction rate for error provrd vocabulary using phoneme likelihood and reliability. System performance comparison as a result of recognition improve represent 2.7% by method using error pattern learning and semantic pattern.

Comparison of RAM Target Value and Operation Data in Air Weapon Systems (야전운용자료를 활용한 항공무기체계의 RAM 목표값 비교분석)

  • Kim, In Seok;Jung, Won
    • Journal of Applied Reliability
    • /
    • v.15 no.4
    • /
    • pp.282-288
    • /
    • 2015
  • Purpose : The purpose of this study is to compare the RAM (reliability, availability and maintainability) value in the acquisition phase with operational period for air weapon systems. The objective is to determine if the value of RAM is sufficient in the field, and look for any difference from the target value to some extent. Methods : For a case study, the ${\bigcirc}{\bigcirc}$ training aircraft is selected. Data from the two acquisition sources are utilized. One is the operational data in domestic aircraft through research and development, and the other is the data from imported aircraft. The two different sources were collected independently and distinctly. Results : According to the analysis, the domestic aircraft shows high deviation in RAM value compare to the imported systems. This is due to the effort of continuous reliability improvement. In the aspect of maintainability, the result shows a slight deviation, and the availability meets the requirement. Conclusion : The results of this study can be used in finding a way that can be effectively applied to the sustainability in the weapon system. If the RAM performance is significantly lower than the target value, then it is necessary to improve the design activities so that they can achieve the RAM target value.