Abstract
Predictions of settlements under preloading for the improvement of soft soil is a very important element of construction management. Due to the non uniformity, difficulty of estimating resonable soil properties, predictions of settlements and settlement velocities at the design stage seldom agree with the actual future settlements. To overcome this problem, the prediction methods based on the settlement observation of initial preloading stage such as hyperbolic method and Asaoka method have been employed frequently. However the estimating method for the reliability of these predictions at the time of prediction has not been suggested. In this study, comparisons of predicted settlements by hyperbolic met hed and observed settlements are explored through case studies. And a stratagem of estimating reliability of settlement predictions by hyperbolic method is suggested as the result of investigation on the relationship between the initial observed time and error of settlement prediction by hyperbolic method.
연약지반 개량을 위한 프리로딩 공법에서 침하 애측은 시공관리상 매우 중요한 요소이다. 지반의 비균질성, 지반 물성치 조사의 한계 등의 이유로 설계시에 침하속도 및 침하량을 실제 발생치와 근접하게 예측하기는 매우 어렵다. 이러한 문제점 때문에 쌍곡선법,아사오카법 등 초기 침하계측을 이용한 장래 침하 추정 법들이 침하 예측 기법으로 활발하게 이용되고 있으나, 예측 시점에서 추정된 장래 침하량의 신뢰성에 대한 평가 방법엔 대하여서는 제시된 바가 없다. 본 연구는 사례연구를 통하여 쌍곡선법으로 예측된 장래침하량들과 실 침하량들을 비교하구 초기 계측 기간에 따른 장래 침하량 예측의 신뢰성에 관한 분석을 통하여. 쌍곡선법을 이용한 장래 침하량 추정의 신뢰성 평가 방법을 제시하고자 한다.