• Title/Summary/Keyword: Reconstruction Management

Search Result 573, Processing Time 0.026 seconds

Comparison of 3D Reconstruction Methods to Create 3D Indoor Models with Different LODs

  • Hong, Sungchul;Choi, Hyunsang
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.674-675
    • /
    • 2015
  • A 3D indoor model becomes an indiscernible component of BIM (Building Information Modeling) and GIS (Geographic Information System). However, a huge amount of time and human resources are inevitable for collecting spatial measurements and creating such a 3D indoor model. Also, a varied forms of 3D indoor models exist depending on their purpose of use. Thus, in this study, three different 3D indoor models are defined as 1) omnidirectional images, 2) a 3D realistic model, and 3) 3D indoor as-built model. A series of reconstruction methods is then introduced to construct each type of 3D indoor models: they are an omnidirectional image acquisition method, a hybrid surveying method, and a terrestrial LiDAR-based method. The reconstruction methods are applied to a large and complex atrium, and their 3D modeling results are compared and analyzed.

  • PDF

Automated 3D Model Reconstruction of Disaster Site Using Aerial Imagery Acquired By Drones

  • Kim, Changyoon;Moon, Hyounseok;Lee, Woosik
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.671-672
    • /
    • 2015
  • Due to harsh conditions of disaster areas, understanding of current feature of collapsed buildings, terrain, and other infrastructures is critical issue for disaster managers. However, because of difficulties in acquiring the geographical information of the disaster site such as large disaster site and limited capability of rescue workers, comprehensive site investigation of current location of survivors buried under the remains of the building is not an easy task for disaster managers. To overcome these circumstances of disaster site, this study makes use of an unmanned aerial vehicle, commonly known as a drone to effectively acquire current image data from the large disaster areas. The framework of 3D model reconstruction of disaster site using aerial imagery acquired by drones was also presented. The proposed methodology is expected to assist rescue workers and disaster managers in achieving a rapid and accurate identification of survivors under the collapsed building.

  • PDF

A Comparative Research on the Reconstruction and Remodeling of Low-rise, Dilapidated Apartment Buildings (노후저층 공동주택의 재건축과 리모델링 사업의 비교 연구)

  • 이효진;김동훈;김진호;임남기
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.05a
    • /
    • pp.75-80
    • /
    • 2002
  • The purpose of this study is to conduct researches on the aspects of reconstruction and remodeling of low-rise, dilapidated apartment buildings in the provinces, using comparative methodologies, consequently coming up with the findings in the following. 1) Unlike the rebuilding projects in which the movement process tends to be made in a bulk (in a simultaneous manner), it turns out that when it comes to remodeling, it would be advisable to attempt moving the inhabitants as a group either by the size of their residence or by the building. 2) Given the peculiarities of the construction management mechanism, remodeling projects might seem disadvantageous on the part of the management on account of inadequate accumulation of information and experience. Hence, based on the impeccable assessment of the current status of the subject buildings from the phase of planning, its imperative to closely look into and take into consideration a variety of direct and/or indirect factors in advance of the implementation. 3) A series of comparative researches from the perspective of economical efficiency that remodeling projects appear profitable considering the overall costs including financial expenses, varied taxes, and so on that will be eventually brought forth during the reconstruction period, and all the more so when allowing for the consequential effects which they ought to have upon the natural and human resources, environmental and ecological condition, business potentials, etc. Amelioration to be desired on the basis of the findings above.

  • PDF

An Integrated Environment and Economic Evaluation Model for Building Reconstruction and Remodeling Projects (재건축과 리모델링 사업의 환경성${\cdot}$경제성 통합평가모델)

  • Lee Ju-Heon;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.327-330
    • /
    • 2002
  • Recently, the environmental sustainability has showed up one of the important considerations in the construction industry. However, the effective evaluation method for the decision-making on either reconstruction or remodeling of a project has not been developed so far. This paper presents an integrated evaluation model considering both environment and economic factors of a building project for which the decision making on either remodeling or reconstruction is needed. In order to develop the model, the characteristics of both types of projects were investigated and analyzed through the related literature review, and then appropriate evaluation criteria and analysis methodology to be used in the model were developed.

  • PDF

Improving Constructability for Partnering in Large Hospital Construction Projects (대형병원 프로젝트의 시공성 증대를 위한 파트너링 모델 구축)

  • Kim Sang-Il
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.3 s.19
    • /
    • pp.153-165
    • /
    • 2004
  • Most engineering tasks require collaboration between many users in major hospital construction projects that have many reconstructions. Loss and change orders occurred in factors such as information exchange, misunderstandings, advanced technology in hospital projects. Moreover, changes in context, costs, requirements, deadlines, etc. require negotiation of issues that may modify important project characteristics. The objective of this paper is to reduce reconstruction for the pre-construction process of hospital projects, reconstruction factors were analyzed in recent hospital construction project the system was established in order to solve reconstruction factors, and this system was validated through applying to the real project. Therefore it is a major challenge to make high level of communication and to have mutual understanding.

Structure-From-Motion Approach to the Reconstruction of Surfaces for Earthwork Planning

  • Nassar, Khaled;Jung, Young-Han
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.3
    • /
    • pp.1-7
    • /
    • 2012
  • The reconstruction of surfaces from unorganized point clouds can provide very useful information for construction managers. Although point clouds are generally created using 3D scanners, they can also be generated via the structure-from-motion technique using a sequence of images. Here we report a novel surface reconstruction technique for modeling and quantifying earthworks that can be used for preliminary planning, project updates and estimating of earthwork quantities, as well as embedded planning systems in construction equipment. The application of structure-from-motion techniques in earth works is examined and its advantages and limitations identified. Data from 23 earthwork excavation construction sites were collected and analyzed. 3D surface reconstructions during the construction phase were compared to the original land form. Similar experiments were conducted with piles of earth and the results analyzed to determine appropriate ranges of use for structure-from-motion surface reconstructions in earthwork applications. The technique was found to be most suited to pile of materials with volumes less than 2000 m3. Piles up to 10 m in height and with base areas up to $300m^2$ were also successfully reconstructed. These results should be of interest to contractors seeking to utilize new technology to optimize operational efficiency.

Condition Monitoring and Diagnosis of a Hot Strip Roughing Mill Using an Autoencoder (오토인코더를 이용한 열간 조압연설비 상태모니터링과 진단)

  • Seo, Myung Kyo;Yun, Won Young
    • Journal of Korean Society for Quality Management
    • /
    • v.47 no.1
    • /
    • pp.75-86
    • /
    • 2019
  • Purpose: It is essential for the steel industry to produce steel products without unexpected downtime to reduce costs and produce high quality products. A hot strip rolling mill consists of many mechanical and electrical units. In condition monitoring and diagnosis, various units could fail for unknown reasons. Methods: In this study, we propose an effective method to detect units with abnormal status early to minimize system downtime. The early warning problem with various units was first defined. An autoencoder was modeled to detect abnormal states. An application of the proposed method was also implemented in a simulated field-data analysis. Results: We can compare images of original data and reconstructed images, as well as visually identify differences between original and reconstruction images. We confirmed that normal and abnormal states can be distinguished by reconstruction error of autoencoder. Experimental results show the possibility of prediction due to the increase of reconstruction error from just before equipment failure. Conclusion: In this paper, hot strip roughing mill monitoring method using autoencoder is proposed and experiments are performed to study the benefit of the autoencoder.

Methylene Blue Dye-Induced Skin Necrosis in Immediate Breast Reconstruction: Evaluation and Management

  • Lee, Ji Hwan;Chang, Choong Hyun;Park, Chan Heun;Kim, June-Kyu
    • Archives of Plastic Surgery
    • /
    • v.41 no.3
    • /
    • pp.258-263
    • /
    • 2014
  • Background For early breast cancer patients, skin-sparing mastectomy or nipple-sparing mastectomy with sentinel lymph node biopsy has become the mainstream treatment for immediate breast reconstruction in possible cases. However, a few cases of skin necrosis caused by methylene blue dye (MBD) used for sentinel lymph node localization have been reported. Methods Immediate breast reconstruction using a silicone implant was performed on 35 breasts of 34 patients after mastectomy. For sentinel lymph node localization, 1% MBD (3 mL) was injected into the subareolar area. The operation site was inspected in the postoperative evaluation. Results Six cases of immediate breast reconstruction using implants were complicated by methylene blue dye. One case of local infection was improved by conservative treatment. In two cases, partial necrosis and wound dehiscence of the incision areas were observed; thus, debridement and closure were performed. Of the three cases of wide skin necrosis, two cases underwent removal of the dead tissue and implants, followed by primary closure. In the other case, the breast implant was salvaged using latissimus dorsi musculocutaneous flap reconstruction. Conclusions The complications were caused by MBD toxicity, which aggravated blood disturbance and skin tension after implant insertion. When planning immediate breast reconstruction using silicone implants, complications of MBD should be discussed in detail prior to surgery, and appropriate management in the event of complications is required.

Anterior Cranial Base Reconstruction in Complex Craniomaxillofacial Trauma: An Algorithmic Approach and Single-Surgeon's Experience

  • Shakir, Sameer;Card, Elizabeth B.;Kimia, Rotem;Greives, Matthew R.;Nguyen, Phuong D.
    • Archives of Plastic Surgery
    • /
    • v.49 no.2
    • /
    • pp.174-183
    • /
    • 2022
  • Management of traumatic skull base fractures and associated complications pose a unique reconstructive challenge. The goals of skull base reconstruction include structural support for the brain and orbit, separation of the central nervous system from the aerodigestive tract, volume to decrease dead space, and restoration of the three-dimensional appearance of the face and cranium with bone and soft tissues. An open bicoronal approach is the most commonly used technique for craniofacial disassembly of the bifrontal region, with evacuation of intracranial hemorrhage and dural repair performed prior to reconstruction. Depending on the defect size and underlying patient and operative factors, reconstruction may involve bony reconstruction using autografts, allografts, or prosthetics in addition to soft tissue reconstruction using vascularized local or distant tissues. The vast majority of traumatic anterior cranial fossa (ACF) injuries resulting in smaller defects of the cranial base itself can be successfully reconstructed using local pedicled pericranial or galeal flaps. Compared with historical nonvascularized ACF reconstructive options, vascularized reconstruction using pericranial and/or galeal flaps has decreased the rate of cerebrospinal fluid (CSF) leak from 25 to 6.5%. We review the existing literature on this uncommon entity and present our case series of n = 6 patients undergoing traumatic reconstruction of the ACF at an urban Level 1 trauma center from 2016 to 2018. There were no postoperative CSF leaks, mucoceles, episodes of meningitis, or deaths during the study follow-up period. In conclusion, use of pericranial, galeal, and free flaps, as indicated, can provide reliable and durable reconstruction of a wide variety of injuries.

A Study of Risk Analysis on Apartment Reconstruction Projects (공동주택 재건축사업의 리스크 분석에 관한 연구)

  • Lee Lo-Na;Woo Kwang-Min;Lee Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.232-235
    • /
    • 2004
  • The apartment reconstruction project is making some problems, such as delay of lack specialty, conflict between project owners and cost increasing etc. The enforcement process of project are very complicated, the term of project is long and too many project owners are participating. For this reasons. it is always in the face of uncertainty. To promote the reconstructing project successfully. we need to make risk management process to get rid of uncertain factors which occur in forwarding the reconstructing project This study has for its objects. First, suggest the best way of risk analysis to manage risk factors systematically and efficiently recognized in The Apartment reconstruction protect. Second, furnish basic data to build the risk managing system of The apartment reconstructing project.

  • PDF