• Title/Summary/Keyword: Railway signaling system

Search Result 224, Processing Time 0.026 seconds

Using SDU Slip/Slide Control (SDU 장치를 이용한 Slip/Slide 제어방안)

  • Park, Ju-Yeon;Kang, Deok-Won;Lee, Jong-Seong
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.377-383
    • /
    • 2011
  • The paper is to perceive accurately speed of the train through redundant processor operation. When Slip/slide is occurred at the axle, the train is applied brake force using the Tachometer and the Doppler sensor which assistance equipment. One of the main features of railway signaling system is that rolling stock is made stop to avoid collision with the rolling stock ahead when the rolling stock exceeds its maximum operating speed in line. In addition, in the case of the rolling stock with automatic train operation, it carries out activities such as braking and propulsion using the difference between its actual speed and target speed at the point. To perform these functions, it is essential to calculate the exact speed of the rolling stock in signaling equipment on vehicles. Train speed detection unit are composed of the Tachometer and the Doppler sensor, and speed information is sent to the SDU unit. The processor of SDU unit calculates the speed of the train using compare logic the received speed information. Even if there are Slip/Slide, signaling system is available to apply exact braking, to improve stop on position and to guarantee the safety of trains.

  • PDF

A Study on Efficient Activities in Railway Safety Guidance (효율적인 철도안전지도 활동에 관한 연구 한국철도공사 중심으로 -)

  • Kim, Tae-gil;Kim, Ki-Young;Kang, Kyung-sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.3
    • /
    • pp.81-88
    • /
    • 2015
  • Infrastructure such as tracks, catenary, rolling stock and signaling systems, and close interface with the human factors of train drivers, shunting staff and maintenance staff are required for train operations. Safety management is the most essential part for the functioning of a train. In line with the safety management, each rail operator has a safety guidance system and the Ministry of Land, Infrastructure and Transport operates Railway Safety Inspector system. Safety Inspector System is to train employees working in the field to be aware of rules and regulations, and to improve identified risk factors. Hence, it is necessary to establish systematic training and inspection methods for safety guidance staff and make clear the roles and responsibilities of safety inspectors according to the Occupational Safety and Health Act, and safety instructors for several inspections according to the Railroad Safety Act.

Performance Verification of WAVE Communication Technology for Railway Application (차량용 무선통신기술(WAVE)의 철도 적용을 위한 성능검증)

  • Kim, Keum-Bee;Ryu, Sang-Hwan;Choi, Kyu-Hyoung
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.4
    • /
    • pp.456-467
    • /
    • 2016
  • Wireless Access in Vehicular Environments (WAVE) communication technology, which provides vehicleto-vehicle and vehicle-to-infrastructure communication and offers safe and convenient service, has been developed for application to an Intelligent Transport System (ITS). This paper provides field test results on a study of the feasibility of WAVE technology application to railway communication systems. A test railway communication system based on WAVE technology has been built along the Daebul line and a newly developed EMU. Field tests have been carried out according to the communication function requirements for LTE - R. The test results show that the railway communication system based on WAVE technology meets the functional requirements: maximum transmission length is 730m, maximum transfer delay is 5.69ms, and maximum interruption time is 1.36s; other tests including throughput test, video data transmission test, VoIP data test, and channel switching test also produced results that meets the functional requirements. These results suggest that WAVE technology can be applied to the railway communication system, enabling Vehicle-to-Wayside communication.

A Study on the Maintainability Prediction and Demonstration (열차제어시스템 유지보수도예측 및 입증에 관한 연구)

  • Shin, Duc-Ko;Lee, Jae-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2005.10b
    • /
    • pp.56-58
    • /
    • 2005
  • This paper for the Train control system which has been used in the railway system for the purpose of headway control is regarded as safety-critical system, which is based on embedded controller. Therefore, for the maintainability, the maintenance time shall be predicted correctly in order to improve availability of railway system and the predictive values shall be proved through the test. In conclusion, for the maintainability of train control system, the solution for exact prediction based on related international standard and the system for justification of derived predictive values shall be proposed.

  • PDF

Locomotive Scheduling Using Constraint Satisfaction Problems Programming Technique

  • Hwang, Jong-Gyu;Lee, Jong-Woo;Park, Yong-Jin
    • KIEE International Transaction on Electrical Machinery and Energy Conversion Systems
    • /
    • v.4B no.1
    • /
    • pp.29-35
    • /
    • 2004
  • Locomotive scheduling in railway systems experiences many difficulties because of the complex interrelations among resources, knowledge and various constraints. Artificial intelligence technology has been applied to solve these scheduling problems. These technologies have proved to be efficient in representing knowledge and rules for complex scheduling problems. In this paper, we have applied the CSP (Constraints Satisfaction Problems) programming technique, one of the AI techniques, to solve the problems associated with locomotive scheduling. This method is more effective at solving complex scheduling problems than available mathematical programming techniques. The advanced locomotive scheduling system using the CSP programming technique is realized based on the actual timetable of the Saemaul type train on the Kyong-bu line. In this paper, an overview of the CSP programming technique is described, the modeling of domain and constraints is represented and the experimental results are compared with the real-world existing schedule. It is verified that the scheduling results by CSP programming are superior to existing scheduling performed by human experts. The executing time for locomotive scheduling is remarkably reduced to within several decade seconds, something requiring several days in the case of locomotive scheduling by human experts.

A Study on the Reliability Management of Onboard Signaling Equipment for the Korean Tilting Train (한국형 틸팅열차 차상신호장치 신뢰성관리에 대한 연구)

  • Shin, Duck-O;Baek, Jong-Hyun;Lee, Knag-Me;Kim, Yong-Kyu
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.6
    • /
    • pp.852-858
    • /
    • 2009
  • This paper is a study on the reliability management of onboard signaling equipment for the Koran Tilting Train (TTX) to run the existing railway to express railway. For safe running of tilting train which operates at Automatic Train Protection (ATP) and Automatic Train Stop (ATS), a reliability management plan for TTX onboard is proposed for preventing train safety from driver oversight and malfunction by establishing braking curves based on movement authority and speed limit, according to preceding train location and rail conditions. Also, reliability of TTX onboard equipment on the basis of proposed plan was estimated, and actual case studies based on the international requirements IEC 62278 (EN 50126) were provided to verify its reliability.

Development of the Design & Coding Standard of Railway Signaling Software as a Automatic Testing Tool (열차제어시스템 소프트웨어 안전성 확인을 위한 코딩규칙 테스팅 자동화 도구의 개발)

  • Hwang, Jong-Gyu;Jo, Hyun-Jeong
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.1
    • /
    • pp.81-87
    • /
    • 2009
  • Recent advances in computer technology have brought more dependency on software to railway signalling system. While much efforts have been reported to evaluate embedded software safety for railway signalling systems, not so much systematic approaches to evaluate software safety testing. In this paper, we propose a adaption of automatic software testing tool in terms of the design & coding standard for railway signalling system. The test items for the design & coding standard suggested in this study related international standards and MISRA-C. It is anticipated that it will be greatly helpful for the evaluation on the software for railway signalling system.

Safety analysis to derive safety requirement in the railway system

  • Joung, Eui-Jin;Shin, Kyung-Ho;Kim, Yong-Gyu
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • v.1
    • /
    • pp.383-386
    • /
    • 2006
  • The safety of the railway system is important because the system is a mass transit system and the results of the accident are inconceivable. The railway system is operated by train operation system such as train control system. So the train control system requires safety critical characteristics. In the European railway, ETCS (European Train Control System) project has been finished to accomplish the interoperability of each national railway signaling system. According to the interoperability degree, ETCS levels are suggested. As the highest level, ETCS level 3 suggests a radio communication. Also recently urban railway system is operated by driverless and automatic train control system. In this circumstance, more safety is required than before in the railway system. In order to accomplish the safety of a system, the requirements considering safety have to be suggested. The requirement is a set of several functions such as general function, environment, safety etc. For the safety critical system, safety function is more important than any other functions. The safety functions are deduced by safety analysis. In order to perform the safety analysis, the system hazards have to be identified and then risk analysis for each hazard should be performed. The risk is related to the frequency and the severity of each hazard. And then countermeasures for each risk have to be prepared. The summary of the countermeasures is about a kind of safety functions in a system. In this paper, the safety functions for a train control system are presented according to the above procedure.

  • PDF

The technical investigation for transportation connection on trans korea railroad (남북철도 연계수송을 위한 기술방안에 관한 고찰)

  • 구동회;유원희;김재철;이찬우
    • Proceedings of the KSR Conference
    • /
    • 2000.11a
    • /
    • pp.93-100
    • /
    • 2000
  • This paper studied technical investigation of effective operation and methodology for technical combination in south and north korea. For harmonious transportation on railroad system, the system of trans-korea railroad investigated on each part(system, Rolling stock, Cartenary & Electricity, Signal and Track etc). Though it isn't show many difference on railroad system, we can show some difference on rolling stock, track and signaling system. For the effective and competitive operation on south and north korea, Many problem investigated and proposed alternative proposal for selecting of rolling stock(diesel or electric), track and signaling improving for speed-up and compatible system at AC and DC system.

  • PDF

Application of Regenerative Energy Storage System to K-AGT Test Track (회생에너지저장시스템의 경량전철 시험선 적용)

  • Cho, Hong-Shik;Lee, Ho-Yong;Cho, Bong-Kwan;Hong, Jai-Sung;Lee, Eun-Kyu;Kim, Hyung-Chul
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.325-330
    • /
    • 2008
  • LRT System Application Project is performed for the purpose of technical advancement and stabilization of K-AGT system from the viewpoint of practical use and commercialization. For those purpose, the performance test and evaluation procedure for K-AGT signaling system are developed, and the scheme of verifying the performance and function of signaling system under multi-train and driverless control environment is being conducted. For the multi-train operation in K-AGT test track, we applied the regenerative energy storage system in addition to the existing electric facilities. This paper present the design, manufacturing, and testing results of regenerative energy storage system.

  • PDF