• Title/Summary/Keyword: Railway Route

Search Result 230, Processing Time 0.027 seconds

Revenue Change by Peak Hour Fare Imposition for Senior Free Ride : Using Seoul Metropolitan Subway Smart Card Data (노인무임승차 첨두시 요금부과에 따른 수입금 변화 : 수도권 스마트카드자료를 이용하여)

  • Seongil Shin;Jinhak Lee;Hasik Lee
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.22 no.2
    • /
    • pp.1-14
    • /
    • 2023
  • This study derives quantitative data on how much the fiscal deficit of subway operation agencies can be reduced in the process of charging free rides for the elderly in metropolitan subways during peak periods. In smart card data, every trip of elderly is recorded except fares. Therefore, it is required to establish a methodology for estimating the fares of elderly passengers and distributing them to subway opertation agencies as income. This study builds a simultaneous dynamic traffic allocation model that reflects the assumption that elderly selects a minimum time route based on the departure time. The travel route of the elderly is estimated, and the distance-proportional fare charged to the elderly is calculated based on this, and the fare is distributed by reflecting the connected railway revenue allocation principle of the metropolitan subway operating agencies. As a result of conducting a case study for before and after COVID-19 in 2019 and 2020, it is analyzed that Seoul Metro's annual free loss of 360 billion won could be reduced 6~8% at the morning peak (07:00-08:59), and 13~16% at the morning and afternoon peak (18:00-19:59).

Evaluation of SWMM Model Adjustment for Rubber-tired Tram Disaster Management System against the Snow-melt during the Winter (겨울철 융설을 대비한 바이모달 트램 재해관리 시스템의 SWMM 모형 적용성 평가)

  • Kim, Jong-Gun;Park, Young-Kon;Yoon, Hee-Taek;Park, Youn-Shik;Jang, Won-Seok;Yoo, Dong-Seon;Lim, Kyoung-Jae
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.56-60
    • /
    • 2008
  • Increasing urban sprawl and climate changes have been causing unexpected high-intensity rainfall events. Thus there are needs to enhance conventional disaster management system for comprehensive actions to secure safety. Therefore long-term and comprehensive flood management plans need to be well established. Recently torrential snowfall are occurring frequently, causing have snow traffic jams on the road. To secure safety and on-time operation of the Bi-modal tram system, well-structured disaster management system capable of analyzing the urban flash flooding and snow pack melt/freezing due to unexpected rainfall event and snowfall are needed. To secure safety of the Bi-modal tram system due to torrential snowfall, the snow melt simulation capability was investigated. The snow accumulation and snow melt were measured to validate the SWMM snow melt component. It showed that there was a good agreement between measured snow melt data and the simulated ones. Therefore, the Bi-modal tram disaster management system will be able to predict snow melt reasonably well to secure safety of the Bi-modal tram system during the winter. The Bi-modal tram disaster management system can be used to identify top priority area for snow removal within the tram route in case of torrential snowfall to secure on-time operation of the tram. Also it can be used for detour route in the tram networks based on the disaster management system predicted data.

  • PDF

Reinforcement of Collapsed Railway Subgrade and Line Capacity Increase Using Short Reinforcement with Rigid Wall (짧은 보강재와 일체형 강성벽체를 활용한 철도 붕괴노반 보강 및 선로용량 증대 기술)

  • Kim, Dae-Sang
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.11
    • /
    • pp.604-609
    • /
    • 2016
  • This study evaluated the long-term performance of RSR (Reinforced Subgrade for Railways) technology which increases the railway line capacity without the need for additional land. Its characteristics include the use of a short reinforcement with rigid wall, which make it possible to apply it in confined spaces. The 7m high and 40m long testbed employed to evaluate the long-term performance was designed and constructed near Jupo station on the Chang-hang line. This line, located close to a local bus route, had collapsed at the subgrade following heavy rainfall. The performance of the new type of subgrade was verified with long term measurements over a 2 year period including the surface and ground settlement, horizontal displacement of the wall, tensile strain of the reinforcement, and settlement of the rail top on the side track. Based on the results of the measurements made until now, we concluded that it had sufficient safety and serviceability for use as a railway subgrade. It is expected that RSR technology could be frequently used at sites which lack the necessary construction materials for an embankment and are located close to functional railway lines and boundaries, in order to settle civil complaints.

The Study on Operation Control & Management System of Bimodal Tram (바이모달트램 통합운영관리시스템 구축에 관한 연구)

  • Yoon, Hee-Taek;Park, Young-Kon;Lee, Kang-Won;Hwang, Eui-Kyeong
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.181-187
    • /
    • 2011
  • Since 2003, state transportation study core technology development is being promoted as part of the bimodal trams operating in accordance with the development of refractive vehicle as research infrastructure for building high-tech road transport system has been the research and development. Bimodal trams of refraction as the vehicle for him to introduce domestic first ever operation management system also developed in Korea according to case-based technology system, but most of the country, and, in this study, mainly those based on technology integration building management system and the bimodal trams of refraction of a vehicle operated was to highlight the features and benefits. Bimodal tram station itself is the way the exclusive properties and to operate the route with large transport capacity has the characteristics of the railway, but the only routes such as railroad lines is not of closed roads under certain circumstances, the flexibility to use has to be integrated operations management system of bimodal trams characteristics of the railroads and public transportation by combining the characteristics of a flexible, convenient and secure services to users with the aim of providing research and will denote the system developed. In this study, bimodal integration system required for the operation of the tram station around the wired and wireless network management center, applying the organic integration into one system so that you have to be centrally managed. In addition, the existing traffic management system operates as a unidirectional rather than monitoring all system-wide management via the interactive network through real-time requests and responses were configured to allow management and control. These findings of the existing traffic operation management system that you can jump step can be based on future unmanned vehicles and related systems through control of the operation management system will be offered as a basis.

  • PDF

Behavior of the Embankment on Normally Consolidated Clay Supported by the Piled Raft (Piled Raft 기초로 지지된 연약지반 상의 제방의 거동)

  • Kim, Sang-Kyu;Song, Sun-Ok;Han, Sung-Gil;Jeon, Jin-Kyu;Lee, Wan-Sung
    • Journal of the Korean Geotechnical Society
    • /
    • v.27 no.4
    • /
    • pp.33-41
    • /
    • 2011
  • A railway embankment route extending to 2 km was laid on normally consolidated clay in the West Gimhae Plain. This embankment was first built using the stage-construction technique, but longitudinal cracks suggesting arc sliding appeared on the surface of the embankment immediately after the first stage of its construction. As an alternative, the piled raft was installed on the failed embankment and then the remaining height of the embankment was raised. The behavior of the piled raft was monitored with different instruments during construction. This paper describes the monitoring results and analyses. The results show that if the pile group essentially exhibits the behavior of friction piles, the piled raft foundation performs well even in normally consolidated soft clay.

Home-based OD Matrix Production and Analysis Using Mobile Phone Data (이동통신 자료를 활용한 가정기반 OD 구축 및 분석)

  • Kim, Kyoungtae;Oh, Dongkyu;Lee, Inmook;Min, Jae Hong
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.5
    • /
    • pp.656-662
    • /
    • 2016
  • Based on time dependent location data of mobile phone users, users' ODs were produced after tracing their travel route and inducing their origins and destinations. System considered average signalizing frequency, which means that the longer the travel length is the more frequent the signal is. This is a home-based OD and is limited to the Seoul Metropolitan area. The OD matrix from the mobile phone data which was aggregated to the cell and transformed to the 'Dong' area, was compared to the KTDB OD. The results can be analyzed and it was determined that they are highly correlated because individual coefficients are 0.98 and 0.85, the former between the OD of this study and the KTDB Si/Gun/Gu unit area OD and the latter between the OD of this study and the Dong unit area KTDB OD.

A Guideline for Development of Track-Bridge Structural System with Sliding Layer to Reduce the Track-Bridge Interaction (궤도-교량 상호작용 저감을 위한 슬라이드 층이 고려된 궤도-교량 구조시스템의 개발 방향)

  • Yun, Kyung-Min;Choi, Shin-Hyung;Song, Dae-Seok;Lee, Kyung-Chan;Lim, Nam-Hyoung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.2
    • /
    • pp.1469-1476
    • /
    • 2015
  • The bridges take a significant part of entire route in Korea railway, because 70% of Korean territory is covered with mountains. For this reason, span enlargement of railway bridges is more advantageous to increase economic efficiency on the bridge design. However there are many limitations such as additional axial force of the rail, excessive displacement due to track-bridge interaction. In this study, track-bridge interaction analysis was conducted considering the sliding layer which was installed between the track and girder. From the numerical analysis results, the behavior of track-bridge interaction was investigated according to the installation method of sliding layer. Finally, a guideline for development of track-bridge structure system to reduce the track-bridge interaction was proposed.

Optimization of Planning-Level Locomotive Scheduling at KNR and Development of Its Implementation Prototype Program (한국철도에서의 계획단계 동력차 스케줄링 최적화 및 전문가 지원시스템의 프로토타입 프로그램 개발에 관한 연구)

  • 문대섭;김동오
    • Proceedings of the KSR Conference
    • /
    • 1999.11a
    • /
    • pp.46-53
    • /
    • 1999
  • As of July 1999, i,185 lomocotives(excluding metropolitan area electric locomotives) are in Korean National Railroad(KNR). With this limited number of resources assigning locomotives to each trains of timetable is very important in the entire railway management point of view because schedule can be regarded as goods in transportation industry. On a simple rail network, it is rather easier to assign proper locomotives to trains with the experience of operating experts and get optimal assignment solution. However, as the network is getting bigger and complicated, the number of trains and corresponding locomotives will be dramatically increased to rover all the demands required to service all of the trains in timetable. There will be also numerous operational constraints to be considered. Assigning proper locomotives to trains and building optimal cyclic rotations of locomotive routings will result in increasing efficiency of schedule and giving a guarantee of more profit. The purpose of this study is two fold: (1) we consider a planning-level locomotive scheduling problem with the objective of minimizing the wasting cost under various practical constraints and (2) development of implementation prototype program of its assigning result. Not like other countries, i.e. Canada, Sweden, Korean railroad operates on n daily schedule basis. The objective is to find optimal assignment of locomotives of different types to each trains, which minimize the wasting cost. This problem is defined on a planning stage and therefore, does not consider operational constraints such as maintenance and emergency cases. Due to the large scale of the problem size and complexity, we approach with heuristic methods and column generation to find optimal solution. The locomotive scheduling prototype consists of several modules including database, optimization engine and diagram generator. The optimization engine solves MIP model and provides an optimal locomotive schedule using specified optimization algorithms. A cyclic locomotive route diagram can be generated using this optimal schedule through the diagram generator.

  • PDF

Derivations of Positive Pressure Condition for Development of Foldable Safe Pathway in Railway Tunnel Fires (철도터널화재용 접이식 대피통로 개발을 위한 양압 조건 도출)

  • Kim, JiTae;Ro, Kyoungchul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.1
    • /
    • pp.284-289
    • /
    • 2019
  • The Korea Foldable safe pathway system is an evacuation support system to get temporary evacuation route in railway tunnel and large space fires. A prevention smoke screen is unfolded in fires and it is needed to prevent heat and smoke from fire source. Therefore, ventilation system for positive pressure condition is equipped with foldable safe pathway system. Numerical analyses of temperature and pressure distribution with distance from fire source were performed considering fire scenario of new train vehicle. The smoke temperatures did not exceed $200^{\circ}C$ that distance from the fire source was more than 20 m and smoke pressure was reduced with distance from fire source. Maximum smoke pressure was 14 Pa and average pressure was 6 Pa in position of prevention smoke screen. As results, to install foldable safe pathway system, ventilation system is need to maintain 6 Pa positive pressure condition.

Performance improvement of serial communication converter of train control computer (열차제어컴퓨터 시리얼통신변환장치(HADAX)의 성능개선에 관한 연구)

  • Cho, Bong-Kwan
    • Journal of The Korean Society For Urban Railway
    • /
    • v.6 no.4
    • /
    • pp.427-436
    • /
    • 2018
  • HADAX is a serial communication converter of train control computer. It is connected with various signal equipments such as wayside signal equipments, station signal equipments, train control computers, and transmits control information and signal condition information for train control. And transmits information to several electronic interlocking devices through a splitter interface. Since HADAX interfaces with many signaling devices through serial communication, frequent communication connection faults necessitate improvement of performance such as dual system configuration, integration of external splitter, and multi-channelization of communication card. The improved HADAX device should have compatibility with the dimensions of existing enclosure and enclosure, and verify the performance of dual system and splitter integration. Therefore, we verified the performance of HADAX through the route control test, dual system test, and multi-channel communication test with splitter integrated connection by connecting with the existing signal equipment.